ME and my Kamloops

Highway 20 – Road Condition

Highway 20. Slushy sections between Anahim Lake Rd and Sawmill Creek Rd for 96.0 km (Anahim Lake to Tatla Lake). Last updated Sat Oct 12 at 6:09 AM PDT. (DBCRCON-32842)

Posted on: October 12, 2019


Highway 20 – Both Directions – Current Planned

Highway 20, in both directions. Road maintenance work between Rainbow Range Trailhead and Kappan Mtn Rd for 40.8 km (Anahim Lake). Until Sun Oct 13. From 7:00 AM to 3:00 PM PDT on weekends. Single lane alternating traffic. Watch for traffic control. Last updated Fri Oct 11 at 12:46 PM PDT. (DBC-12621)

Posted on: October 12, 2019


Road 40 – Current Planned

Road 40 (Lillooet-Pioneer Rd). Utility work between Haylmore Lane and Gun Creek Pit Rd for 4.7 km (94 to 99 km west of Lillooet). Until Fri Oct 18 at 6:00 PM PDT. Lane closures in both directions in effect. Expect delays. Expect delays up to 5 minutes. Last updated Wed Oct 9 at 8:17 AM PDT. (DBC-12557)

Posted on: October 9, 2019


Highway 20 – Both Directions – Current Planned

Highway 20, in both directions. Shoulder maintenance between Redstone-Chezacut Rd and Bayliff Rd for 1.4 km (31 to 32 km west of Alexis Creek). Until Wed Oct 16 at 2:15 PM PDT. From 9:00 AM to 2:30 PM PDT on weekdays. Watch for traffic control. Last updated Tue Oct 8 at 8:35 AM PDT. (DBC-12523)

Posted on: October 8, 2019


Highway 97 – Current Planned

Highway 97. Shoulder maintenance between Mound Rd and Big Bar Rd for 4.4 km (3 to 7 km north of Clinton). Until Sat Oct 12 at 5:00 PM PDT. Lane Closure. Last updated Fri Oct 4 at 1:52 PM PDT. (DBC-12425)

Posted on: October 5, 2019


Highway 20 – Both Directions – Current Planned

Highway 20, in both directions. Road maintenance work between Chignell Rd and Tatlayoko Rd for 10.8 km (Tatla Lake). Until Tue Oct 15. From 6:00 AM to 5:00 PM PDT daily. Single lane alternating traffic. Last updated Thu Oct 3 at 8:38 AM PDT. (DBC-12384)

Posted on: October 3, 2019


Highway 20 – Both Directions – Current Planned

Highway 20, in both directions. Maintenance between Rainbow Range Trailhead and Christensen Rd for 40.8 km (Anahim Lake). Until Sat Oct 5 at 4:30 PM PDT. From 9:00 AM to 4:30 PM PDT daily. Single lane alternating traffic. Last updated Fri Sep 27 at 7:36 PM PDT. (DBC-12256)

Posted on: September 29, 2019


Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Paving operations between Lovett Rd and Wright Station Rd for 21.0 km (33 km south of 150 Mile House to 17 km north of 100 Mile House). Until Wed Oct 9 at 7:00 PM PDT. Single lane alternating traffic. Expected delays of 15 minutes. Please watch for signage and personnel. Last updated Fri Sep 20 at 1:42 PM PDT. (DBC-12022)

Posted on: September 20, 2019


Highway 1 – Road Condition

Highway 1. Heavy rain between Back Valley Rd and Juniper Beach Prov Park Access Rd for 16.8 km (Cache Creek to 17 km east of Cache Creek). Potential for debris flows. No stopping during rainfall between Back Valley Road and Juniper Beach Provincial Park Access Road. Plan for highway closure in event of heavy rain. Last updated Mon Sep 9 at 1:30 PM PDT. (DBC-11632)

Posted on: September 9, 2019


Other Roads – Incident

High Bar Road. High Bar Road. Mudslide between Jesmond Road and Big Bar Road. Road closed. Estimated time of opening not available. Assessment in progress. Next update time Mon Sep 9 at 4:00 PM PDT. Last updated Mon Sep 9 at 8:19 AM PDT. (DBC-11641)

Posted on: September 9, 2019


Road 40 – Current Planned

Road 40 (Lillooet-Pioneer Rd). Maintenance between Marshall Lake Rd and Michelmoon FSR for 35.5 km (64 to 28 km west of Lillooet). Until Fri Sep 13 at 5:00 PM PDT. Single lane alternating traffic. Expect up to 20 minute delays. Last updated Mon Sep 9 at 7:06 AM PDT. (DBC-11649)

Posted on: September 9, 2019


Other Roads – Road Condition

Loon Lake Road. Loon Lake Road. Heavy rain between Cariboo Highway and Stevens Road. Potential for debris flows. No stopping during rainfall between Cariboo Highway & Stevens Rd. Plan for highway closure in event of heavy rain. Last updated Mon Sep 9 at 4:09 AM PDT. (DBC-11631)

Posted on: September 9, 2019


Highway 97C – Road Condition

Highway 97C. Heavy rain between Cornwall Rd and Empter Frontage Rd for 5.9 km (Ashcroft). Potential for debris flows. No stopping during rainfall between Cornwall Rd. & Empter Frontage Rd. Plan for highway closure in event of heavy rain. Last updated Mon Sep 9 at 4:08 AM PDT. (DBC-11630)

Posted on: September 9, 2019


Highway 1 – Road Condition

Highway 1. Heavy rain between Cornwall Rd and Old Cariboo Rd for 9.6 km (1 km east of Ashcroft to Cache Creek). Potential for debris flows. No stopping during rainfall between Cornwall Rd. & Old Cariboo Rd.
Plan for Highway closure in event of heavy rain. Last updated Mon Sep 9 at 4:08 AM PDT. (DBC-11627)

Posted on: September 9, 2019


Highway 99 – Road Condition

Highway 99. Heavy rain between Hat Creek Rd and Jackson Rd for 19.7 km (50 to 70 km north of Lillooet). Potential for debris flows. No stopping during rainfall between Hat Creek Rd. & Jackson Rd. Plan for highway closure in event of heavy rain. Last updated Mon Sep 9 at 4:08 AM PDT. (DBC-11629)

Posted on: September 9, 2019


Highway 97 – Road Condition

Highway 97. Heavy rain between Stephenson Rd and 26 Mile Frontage Rd for 34.3 km (Cache Creek to 4 km south of Clinton). Potential for debris flows. No stopping during rainfall between Stephenson Rd. And 26 mile Frontage Rd. 5km¿¿¿s south of Clinton. Plan for highway closure in event of heavy rain. Last updated Mon Sep 9 at 4:07 AM PDT. (DBC-11628)

Posted on: September 9, 2019


Highway 20 – Both Directions – Current Planned

Highway 20, in both directions. Road maintenance work between Miner Lake FSR and Dowling Rd for 8.7 km (24 to 15 km west of Tatla Lake). Until Mon Sep 30 at 6:00 PM PDT. From 6:00 AM to 6:00 PM PDT daily. Road construction work. Single lane alternating traffic. Watch for traffic control. Last updated Wed Sep 4 at 8:12 AM PDT. (DBC-11514)

Posted on: September 4, 2019


Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Paving operations between Loon Lake Rd and Kelly Lake Rd for 18.4 km (Clinton). Until Fri Sep 20 at 7:00 PM PDT. Single lane alternating traffic. Expected delays of 10 minutes. Watch for signage and personnel. Last updated Thu Aug 29 at 8:53 AM PDT. (DBC-11398)

Posted on: September 3, 2019


Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Paving operations between Montessa Dr and 90 Mile Loop Rd for 9.9 km (9 km south of 100 Mile House to 16 km north of 70 Mile House). Until Fri Sep 20 at 7:00 PM PDT. Expect delays. Watch for traffic control. Single lane only with lane closure. Last updated Thu Aug 29 at 8:44 AM PDT. (DBC-11396)

Posted on: September 3, 2019


Other Roads – Incident

Alexis Creek Nazko Road. Alexis Creek Nazko Road. Washout at Alexis Lake. Road is open to traffic. Washout 29 km North of Hwy20 on Alexis Creek Nazko Road. Detour via Raven Lake-Palmer to Clusko Aneko Road. Next update time Fri Aug 16 at 12:00 PM PDT. Last updated Thu Aug 15 at 8:01 PM PDT. (DBC-10634)

Posted on: August 15, 2019


Other Roads – Incident

High Bar Road. High Bar Road. Washout between Jesmond Road and Big Bar Ferry Road. Assessment in progress. Road closed. Estimated time of opening not available. Next update time Mon Aug 19 at 4:00 PM PDT. Last updated Thu Aug 15 at 7:05 PM PDT. (DBC-10834)

Posted on: August 15, 2019


Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Paving operations between Elefson Rd and Campbell Rd for 2.9 km (2 to 5 km south of 100 Mile House). Until Sat Aug 31 at 7:00 PM PDT. Roadway reduced to one lane. Expect delays. Watch for traffic control. Last updated Thu Aug 15 at 6:56 PM PDT. (DBC-10767)

Posted on: August 15, 2019


Highway 97 – Both Directions – Future Planned

Highway 97, in both directions. Utility work planned between Loon Lake Rd and Kelly Lake Rd for 18.4 km (Clinton). Starting Mon Aug 19 at 8:00 AM PDT until Mon Aug 19 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Expect delays of 10 minutes. Please watch for signage and personnel. Last updated Thu Aug 15 at 6:55 PM PDT. (DBC-10976)

Posted on: August 15, 2019


Highway 1 – Both Directions – Future Planned

Highway 1, in both directions. Utility work planned between Campbell Hill Dr and Collins Rd for 2.2 km (Cache Creek). Starting Mon Aug 19 at 8:00 AM PDT until Mon Aug 19 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Intermittent lane closure with minimal delays. Please watch for signage and personnel. Last updated Thu Aug 15 at 6:54 PM PDT. (DBC-10978)

Posted on: August 15, 2019


Highway 99 – Both Directions – Current Planned

Highway 99, in both directions. Maintenance between Fountain Valley Rd and Sallus Creek Rd for 5.2 km (13 to 18 km north of Lillooet). Watch for 24 hour flagging personnel and signage. Commercial Truckers, please note: effective March 7 27,000kg GVW Legal Loading on Hwy 99 between its junction with Fountain Valley Rd, 15km North of Lillooet and its junction with Pavilion-Clinton Rd. 35km North of Lillooet. Last updated Thu Aug 15 at 6:54 PM PDT. (DBC-4550)

Posted on: August 15, 2019


Highway 97 – Both Directions – Future Planned

Highway 97, in both directions. Utility work planned between Bull Mountain Rd and Mountain House Rd for 4.8 km (8 to 3 km north of Wildwood). Starting Mon Aug 19 at 7:00 AM PDT until Thu Sep 12 at 5:30 PM PDT. Single lane alternating traffic will be in effect. Intermittent lane closures with expected 10 minute delays. Please watch for signage and personnel. Last updated Thu Aug 15 at 11:22 AM PDT. (DBC-10986)

Posted on: August 15, 2019


Highway 97 – Both Directions – Future Planned

Highway 97, in both directions. Special event planned between Hixon Sub Rd and Parenteau Rd for 1.1 km (Hixon). Starting Sat Aug 17 at 10:00 AM PDT until Sat Aug 17 at 10:30 AM PDT. Road closure planned. Detour will not be available. Closed for the Hixon Parade (approx 25 mins). Last updated Thu Aug 15 at 9:34 AM PDT. (DBC-10979)

Posted on: August 15, 2019


Highway 20 – Both Directions – Current Planned

Highway 20, in both directions. Road maintenance work between Mackenzie-Grease Trailhead and Elsey Rd for 79.5 km (7 km east of Firvale to 6 km west of Anahim Lake). Until Fri Aug 16. From 7:30 AM to 3:00 PM PDT on weekdays. Single lane alternating traffic. Last updated Mon Aug 12 at 7:54 AM PDT. (DBC-10860)

Posted on: August 12, 2019


Nazko Rd – Westbound – Current Planned

Nazko Rd, westbound. Mowing between Pinnacles Rd and Centennial Park Rd for 91.8 km (94 to 2 km east of Nazko). Until Fri Aug 16 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on weekdays. Watch for traffic control at various locations. Last updated Fri Aug 9 at 11:36 AM PDT. (DBC-10793)

Posted on: August 12, 2019


Highway 20 – Both Directions – Future Planned

Highway 20, in both directions. Bridge construction planned between Nusatsum-noeick FSR and Jourdenais Rd (16 km west of Firvale). Starting Sat Aug 3 at 6:00 AM PDT until Sun Aug 4 at 8:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Delay anticipated to be 5 minutes or less. There will be no work on Mon Aug 5th. Last updated Thu Aug 1 at 10:19 AM PDT. (DBC-10605)

Posted on: August 1, 2019


Highway 20 – Future Planned

Highway 20 . Bridge construction planned at Nusatsum River bridge. Starting Thu Aug 1 at 7:00 PM PDT until Fri Aug 2. Road closure planned. Nusatsum River bridge will be closed August 1st from 19:00 to 24:00. Only emergency vehicles less than 5 tons will be permitted passing the bridge under the escort of a traffic controller. Next update time Fri Aug 2. Last updated Wed Jul 31 at 11:10 AM PDT. (DBC-10567)

Posted on: July 31, 2019


Horsefly Rd – Current Planned

Horsefly Rd. Road maintenance work between Horsefly-Likely Rd; Likely Rd and Walters Dr for 46.1 km (2 km west of Dugan Lake to 1 km west of Horsefly). Until Fri Aug 2. From 8:30 AM to 3:30 PM PDT on Tuesday, Wednesday, Thursday and Friday. Shoulder closed. Watch for traffic control. Last updated Tue Jul 30 at 11:21 AM PDT. (DBC-10526)

Posted on: July 30, 2019


Highway 97 – Future Planned

Highway 97. Road sweeping planned between William R Bennett Bridge and Abbott St (Kelowna). Starting Tue Jul 30 at 8:00 PM PDT until Wed Jul 31 at 6:00 AM PDT. Last updated Mon Jul 29 at 12:07 PM PDT. (DBC-10497)

Posted on: July 29, 2019


Highway 3A – Both Directions – Current Planned

Highway 3A, in both directions. Road maintenance work at Highway 3; Keremeos (Keremeos). Until Tue Jul 30 at 6:00 PM PDT. Single lane alternating traffic. Single Lane Alternating Traffic with Minor Delays of Up to 5 minutes expected for shoulder widening & base repairs 500 metres west of Twin Lakes Road. Last updated Wed Jul 24 at 4:04 PM PDT. (DBC-10390)

Posted on: July 29, 2019


Other Roads – Incident

Farwell Canyon Road. Farwell Canyon Road. Washout between Highway 20 and Big Creek Rd. Single lane alternating traffic. Work in progress. Local traffic only. Expect minor delays to 15 minutes. Next update time Fri Jul 26 at 9:00 AM PDT. Last updated Thu Jul 25 at 8:20 PM PDT. (DBC-9930)

Posted on: July 25, 2019


Other Roads – Incident

Meadow Lake Road. Meadow Lake Road. Mudslide between Canoe Creek Indian Reserve and Churn Creek Bridge near Clinton. Single lane alternating traffic. Muddy sections. Last updated Thu Jul 25 at 8:20 PM PDT. (DBC-10044)

Posted on: July 25, 2019


Other Roads – Incident

LOON LAKE ROAD. LOON LAKE ROAD. Mudslide between RENSCH RD and HIGHWAY 97. Single lane alternating traffic. Last updated Thu Jul 25 at 8:20 PM PDT. (DBC-10380)

Posted on: July 25, 2019


Highway 5 – Northbound – Current Planned

Highway 5, northbound. Paving operations between River St and CN Junction Rd for 5.7 km (Kamloops). Until Thu Aug 1. From 7:00 PM to 6:00 AM PDT on weekdays and Sunday. Northbound lane closure. Last updated Thu Jul 25 at 8:23 AM PDT. (DBC-10408)

Posted on: July 25, 2019


Other Roads – Both Directions – Incident

Sky Ranch Road. Sky Ranch Road, in both directions. Washout at Sky Ranch Road. Estimated time of opening not available. Detour not available. Road is open to 17km mark, after 17km road is closed. Work in progress. Next update time Tue Jul 30 at 2:00 PM PDT. Last updated Thu Jul 25 at 6:38 AM PDT. (DBC-9933)

Posted on: July 25, 2019


Other Roads – Incident

Taseko Lake Road. Taseko Lake Road. Washout between Stone Reserve and Stone Reserve. Road closed. Estimated time of opening not available. Washed out at the 4 km mark closed at Minton Creek. Detour via Minton Creek rd. Taseko Lake Rd is Single Lane Alternating Traffic. Work in progress. Next update time Tue Jul 30 at 3:00 PM PDT. Last updated Thu Jul 25 at 6:38 AM PDT. (DBC-9931)

Posted on: July 25, 2019


Highway 33 – Current Planned

Highway 33. Mowing between Big White Rd and Black Mountain Dr for 26.0 km (Kelowna). From 7:30 AM to 3:00 AM PDT on weekdays. SHADOW VEHICLE SLOW MOVING. Last updated Thu Jul 25 at 6:14 AM PDT. (DBC-10276)

Posted on: July 25, 2019


Other Roads – Current Planned

SUGAR LAKE ROAD. SUGAR LAKE ROAD. Bridge maintenance between SUGAR LAKE and SUGAR LAKE near Cherryville. Until Wed Jul 31 at 12:00 PM PDT. Structure load restricted to 15,000kg. Please expect minor delays. Road will be fully closed July 29th 8am-12pm for maintenance. Last updated Thu Jul 25 at 6:12 AM PDT. (DBC-10377)

Posted on: July 25, 2019


Dog Creek Rd – Incident

Dog Creek Rd. Washout between Gang Ranch Rd and Upper Dog Creek Rd for 3.0 km (80 to 83 km south of Williams Lake). Single lane alternating traffic. Expect minor delays. Next update time Fri Jul 26 at 9:00 AM PDT. Last updated Wed Jul 24 at 6:15 AM PDT. (DBC-10082)

Posted on: July 24, 2019


Highway 20 – Current Planned

Highway 20. Road maintenance work between Atnarko Campground Access Rd and Kappan Mtn Rd for 61.8 km (33 km east of Firvale to Anahim Lake). Until Fri Jul 26 at 2:30 PM PDT. Single lane alternating traffic. Last updated Mon Jul 22 at 10:58 AM PDT. (DBC-10283)

Posted on: July 22, 2019


Nazko Rd – Both Directions – Current Planned

Nazko Rd, in both directions. Maintenance between 2400 Rd and 2500 Rd (68 km east of Nazko). Until Sat Aug 31 at 5:00 PM PDT. Single lane alternating traffic. Expect minimal delays. Please watch for personnel and signage. Last updated Fri Jul 19 at 4:22 PM PDT. (DBC-10131)

Posted on: July 22, 2019


Highway 20 – Current Planned

Highway 20. Bridge maintenance at Nusatsum-noeick FSR (16 km west of Firvale). Until Thu Jul 25 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. No construction during the Bella Coola Musical Festival Period from July 19th to 22nd. Last updated Thu Jul 18 at 7:50 PM PDT. (DBC-9680)

Posted on: July 18, 2019


Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Rock slope stabilization between Bentley Rd and Callan Rd for 4.1 km (Summerland). Until Fri Aug 16 at 3:00 PM PDT. From 730 AM to 530 PM expect up to 20 minute delays for equipment operations and debris removal, allow time for these delays and obey construction zone rules and traffic control workers at the site. Last updated Wed Jul 17 at 9:53 AM PDT. (DBC-9838)

Posted on: July 17, 2019


Other Roads – Incident

Word Creek Road. Word Creek Road. Bridge closed at Gaspard Bridge. Structural damage to the Gaspard Bridge. Road closed at Gang Creek Road until further notice. Next update time Wed Jul 31 at 8:00 AM PDT. Last updated Mon Jul 15 at 9:11 AM PDT. (DBC-9941)

Posted on: July 15, 2019


Highway 20 – Both Directions – Current Planned

Highway 20, in both directions. Mowing between Bittner Rd and Chilko-Newton Rd for 121.7 km (32 km west of Tatla Lake to 19 km west of Alexis Creek). Until Thu Jul 25. From 7:00 AM to 5:00 PM PDT daily. Watch for traffic control. Last updated Mon Jul 15 at 7:41 AM PDT. (DBC-10069)

Posted on: July 15, 2019


Highway 3 – Both Directions – Future Planned

Highway 3, in both directions. Seal coating planned between Saturday Creek and Ashnola Rd for 65.3 km (11 km east of Sunday Summit to 7 km east of Hedley). Starting Mon Aug 19 at 7:00 AM PDT until Fri Aug 30 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Approximately 27 Km’s of Seal Coating on two sections of Hwy 3, in Princeton area.
24 hour pilot car assisted traffic control. Last updated Thu Jul 4 at 2:43 PM PDT. (DBC-9845)

Posted on: July 4, 2019


Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Construction work between Procter St and Fox Mountain Rd for 2.2 km (Williams Lake). Until Mon Sep 30 at 7:00 AM PDT. Expect some delays. Please watch for signage and personnel. Last updated Thu Jul 4 at 9:03 AM PDT. (DBC-9829)

Posted on: July 4, 2019


Nazko Rd – Westbound – Current Planned

Nazko Rd, westbound. Roadside brushing between Centennial Park Rd and Bill Rd (Nazko). Until Thu Aug 1 at 3:00 PM PDT. From 6:00 AM to 3:00 PM PDT daily. Lane Closure. Expect delays of 5 minutes. Please watch for signage and personnel. Last updated Wed Jul 3 at 3:59 PM PDT. (DBC-9807)

Posted on: July 3, 2019


Highway 97 – Both Directions – Future Planned

Highway 97, in both directions. Maintenance planned between W Duncan Ave and Pacific Cres (Penticton). Starting Thu Oct 10 at 7:00 AM PDT until Thu Oct 10 at 7:00 PM PDT. Last updated Wed Jun 19 at 11:09 AM PDT. (DBC-9485)

Posted on: June 19, 2019


Highway 20 – Westbound – Current Planned

Highway 20, westbound. Bridge construction between Elsey Rd and Rainbow Range Trailhead (23 km west of Anahim Lake). Until Wed Sep 18 at 5:00 PM PDT. Expect minor delays. Louie Creek Bridge 23km West of Anahim Lake. Last updated Mon Jun 17 at 4:29 PM PDT. (DBC-9406)

Posted on: June 18, 2019


Highway 3 – Both Directions – Current Planned

Highway 3, in both directions. Ditching at Saturday Creek (2 km east of Sunday Summit). Until Thu Jun 6 at 4:00 PM PDT. Single lane alternating traffic. Last updated Thu Jun 6 at 7:30 AM PDT. (DBC-9048)

Posted on: June 6, 2019


Highway 5 – Northbound – Current Planned

Highway 5, northbound. Maintenance between Exit 202 and Exit 217: Exit 217 Zopkios Brake Check for 14.0 km (3 km south of Coquihalla Summit to 11 km south of Great Bear Snowshed). Until Thu Jun 6 at 3:30 PM PDT. IN THE GREAT BEAR SNOW SHED. Last updated Thu Jun 6 at 7:26 AM PDT. (DBC-9047)

Posted on: June 6, 2019


Highway 5A – Current Planned

Highway 5A. Maintenance between Highway 3 and Skye Blue Loop for 31.4 km (Princeton to 8 km south of Gulliford Lake Rest Area). Until Thu Jun 6 at 3:00 PM PDT. Last updated Thu Jun 6 at 5:48 AM PDT. (DBC-9042)

Posted on: June 6, 2019


Little Fort Ferry – Incident

Little Fort Ferry. Ferry is currently out of service between Little Fort Ferry and Little Fort Ferry (1 km west of Little Fort). Sailings restricted to emergencies only between 10:00PM and 4:00AM due to high debris flow at night. Normal sailings resume between 4AM to 10PM. Open to local traffic only due to Windpass Rd being closed for maintenance. Detour via Dunn Lake Road. This is until further notice. Last updated Wed Jun 5 at 2:12 PM PDT. (DBC-8873)

Posted on: June 5, 2019


Highway 12 – Future Planned

Highway 12. Electrical maintenance planned between Three Mile Rd and Six Mile Rd for 4.8 km (4 to 8 km north of Lytton). Starting Mon Jun 17 at 10:00 AM PDT until Mon Jun 17 at 4:00 PM PDT. Last updated Wed Jun 5 at 1:00 PM PDT. (DBC-9022)

Posted on: June 5, 2019


Highway 1 – Future Planned

Highway 1. Electrical maintenance planned between Kanaka Station Rd and Cisco Siding Rd for 4.1 km (7 km west of Lytton to 4 km east of Jackass Mountain Summit). Starting Tue Jun 18 at 8:00 AM PDT until Wed Jun 19 at 4:00 PM PDT. Last updated Wed Jun 5 at 12:47 PM PDT. (DBC-9021)

Posted on: June 5, 2019


Highway 1 – Future Planned

Highway 1. Electrical maintenance planned between Jackass Summit and Kanaka Station Rd for 1.7 km (2 to 4 km east of Jackass Mountain Summit). Starting Wed Jun 12 at 8:00 AM PDT until Thu Jun 13 at 4:00 PM PDT. Last updated Wed Jun 5 at 12:44 PM PDT. (DBC-9020)

Posted on: June 5, 2019


Highway 1 – Future Planned

Highway 1. Electrical maintenance planned at Jackass Summit (2 km east of Jackass Mountain Summit). Starting Mon Jun 10 at 8:00 AM PDT until Tue Jun 11 at 4:00 PM PDT. Last updated Wed Jun 5 at 12:35 PM PDT. (DBC-9019)

Posted on: June 5, 2019


Highway 5 – Northbound – Future Planned

Highway 5, northbound. Garbage pickup planned between Peavine Rd and McMurphy Station Rd for 25.7 km (20 km south of Avola to 1 km south of Vavenby). Starting Thu Jun 6 at 5:00 AM PDT until Thu Jun 6 at 6:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Wed Jun 5 at 11:19 AM PDT. (DBC-8970)

Posted on: June 5, 2019


Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Construction work between Road 5 and Road 4 for 0.6 km (2 km south of Oliver). Until Thu Jun 6 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on Wednesday and Thursday. Single lane alternating traffic. Expect minor delays. Last updated Wed Jun 5 at 9:52 AM PDT. (DBC-9005)

Posted on: June 5, 2019


Other Roads – Current Planned

97C. 97C. Road sweeping between TREPANIER and BRENDA MINES. Until Thu Jun 6. From 7:00 AM to 3:00 PM PDT on Wednesday and Thursday. Watch for slow moving vehicles, sweeper in left lane. Last updated Wed Jun 5 at 9:09 AM PDT. (DBC-9009)

Posted on: June 5, 2019


Highway 6 EW – Both Directions – Current Planned

Highway 6 EW, in both directions. Utility work between Shafer Rd and Byers Rd (12 km east of Lumby). Until Thu Jun 6 at 6:00 PM PDT. Installing web camera. Last updated Mon Jun 3 at 2:14 PM PDT. (DBC-8916)

Posted on: June 5, 2019


Highway 5 – Southbound – Current Planned

Highway 5, southbound. Road sweeping between Exit 202 and Exit 192 for 9.3 km (15 km north of Hope to 11 km south of Great Bear Snowshed). Until Wed Jun 5 at 4:30 PM PDT. Last updated Wed Jun 5 at 7:34 AM PDT. (DBC-9000)

Posted on: June 5, 2019


Highway 5 – Both Directions – Current Planned

Highway 5, in both directions. Maintenance between Exit 202 and Exit 217: Exit 217 Zopkios Brake Check for 14.0 km (3 km south of Coquihalla Summit to 11 km south of Great Bear Snowshed). Until Wed Jun 5 at 3:30 PM PDT. GREAT BEAR SNOW SHED. Last updated Wed Jun 5 at 7:08 AM PDT. (DBC-8989)

Posted on: June 5, 2019


Highway 1 – Current Planned

Highway 1. Maintenance between Balmoral Rd and Ford Rd for 6.0 km (2 to 8 km west of Tappen). Until Fri Jun 7 at 4:00 PM PDT. Lane Closure. 70 KILOMETER SPEED LIMIT PAY ATTENTION TO TRAFFIC CONTROL. Last updated Wed Jun 5 at 6:01 AM PDT. (DBC-8983)

Posted on: June 5, 2019


Highway 5 – Southbound – Future Planned

Highway 5, southbound. Maintenance planned between Blue River Bridge and Montana Creek FSR; Vavenby Bridge Rd for 82.7 km (Blue River to Vavenby). Starting Fri Jun 7 at 9:00 AM PDT until Fri Jun 7 at 1:00 PM PDT. Last updated Tue Jun 4 at 1:37 PM PDT. (DBC-8969)

Posted on: June 4, 2019


Highway 1 – Both Directions – Future Planned

Highway 1, in both directions. Utility work planned at Deadman-Vidette Rd (29 km east of Cache Creek). Starting Tue Jun 11 at 7:00 AM PDT until Thu Jun 13 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on Tuesday, Wednesday and Thursday. Last updated Tue Jun 4 at 11:06 AM PDT. (DBC-8908)

Posted on: June 4, 2019


Highway 97 – Current Planned

Highway 97. Utility work between Madeline Lake Rd and O’Neil Rd (18 km east of Falkland). Until Wed Jun 5 at 3:00 PM PDT. Ground water monitoring. Last updated Mon Jun 3 at 2:22 PM PDT. (DBC-8917)

Posted on: June 4, 2019


Highway 1 – Both Directions – Current Planned

Highway 1, in both directions. Utility work at Juniper Beach Prov Park Access Rd (17 km east of Cache Creek). Until Wed Jun 5. From 8:00 AM to 4:00 PM PDT on Tuesday and Wednesday. Single lane alternating traffic. Last updated Mon Jun 3 at 8:45 AM PDT. (DBC-8848)

Posted on: June 4, 2019


Highway 1 – Both Directions – Current Planned

Highway 1, in both directions. Bridge maintenance between Congreve Rd and Finlayson St for 0.2 km (Sicamous). Until Sat Jun 8. From 7:00 PM to 5:30 AM PDT on weekdays and Saturday. Single lane alternating traffic. 20 minute delays. Last updated Mon Jun 3 at 9:07 PM PDT. (DBC-8911)

Posted on: June 3, 2019


Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Road sweeping between Old Vernon Rd and Crystal Waters Rd for 21.6 km (Kelowna to 11 km south of Coldstream). Until Wed Jun 5. From 8:00 PM to 6:00 AM PDT on Monday, Tuesday and Wednesday. Watch for slow moving vehicles. Last updated Mon Jun 3 at 4:44 PM PDT. (DBC-8930)

Posted on: June 3, 2019


Highway 5 – Both Directions – Current Planned

Highway 5, in both directions. Shoulder maintenance at Hoirup Rd (7 km north of Vavenby). Until Fri Jun 21. From 3:00 AM to 5:00 PM PDT daily. Last updated Mon Jun 3 at 2:44 PM PDT. (DBC-8920)

Posted on: June 3, 2019


Highway 5 – Southbound – Future Planned

Highway 5, southbound. Maintenance planned between Mount Olie St and Allen-Meeker Rd for 5.5 km (Little Fort). Starting Thu Jun 6 until Fri Jun 7. From 7:00 AM to 6:00 PM PDT on Thursday and Friday. Single lane alternating traffic will be in effect. Last updated Mon Jun 3 at 2:32 PM PDT. (DBC-8919)

Posted on: June 3, 2019


Highway 1 – Future Planned

Highway 1. Utility work planned between 3 St NW and Shuswap St for 0.3 km (Salmon Arm). Starting Thu Jun 13 at 9:00 AM PDT until Fri Jun 14 at 4:00 PM PDT. Ground water sampling. Last updated Mon Jun 3 at 2:32 PM PDT. (DBC-8918)

Posted on: June 3, 2019


Highway 5 – Both Directions – Current Planned

Highway 5, in both directions. Rock slope stabilization at Barriere Town Rd (Barriere). Until Fri Jun 7. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Last updated Mon Jun 3 at 11:31 AM PDT. (DBC-8909)

Posted on: June 3, 2019


Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Road sweeping between Crystal Waters Rd and Clerke Rd for 12.2 km (Coldstream). Until Fri Jun 7 at 6:00 PM PDT. Lane Closure. Last updated Fri May 31 at 8:57 PM PDT. (DBC-8869)

Posted on: June 3, 2019


Highway 97B – Both Directions – Current Planned

Highway 97B, in both directions. Maintenance between Highway 97A and Black Rd for 8.8 km (Salmon Arm). Until Fri Jun 14. From 6:00 AM to 3:00 PM PDT on weekdays. Single lane alternating traffic. Expect minor delays. Last updated Sun Jun 2 at 6:47 PM PDT. (DBC-8884)

Posted on: June 3, 2019


Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Maintenance between Crystal Waters Rd and Westside Rd; Westside Rd for 29.8 km (11 km north of Vernon to 11 km south of Coldstream). Until Fri Jun 14. From 6:00 AM to 3:00 PM PDT on weekdays. Lane closures in both directions in effect. Last updated Sun Jun 2 at 6:35 PM PDT. (DBC-8883)

Posted on: June 3, 2019


Highway 97A – Both Directions – Current Planned

Highway 97A, in both directions. Maintenance between Highway 97 and Enderby Grindrod Rd for 37.1 km (Enderby). Until Fri Jun 14. From 6:00 AM to 3:00 PM PDT on weekdays. Single lane alternating traffic. Expect minor delays. Last updated Sun Jun 2 at 6:30 PM PDT. (DBC-8882)

Posted on: June 3, 2019


Highway 1 – Both Directions – Future Planned

Highway 1, in both directions. Paving operations planned between Three Valley Siding and Three Valley Frtg for 4.2 km (16 to 20 km west of Revelstoke). Starting Wed Jun 5 at 5:00 AM PDT until Fri Jun 14 at 5:00 PM PDT. From 5:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Expect up to 20 min delays. Last updated Fri May 31 at 12:42 PM PDT. (DBC-8858)

Posted on: May 31, 2019


Highway 93 – Both Directions – Future Planned

Highway 93, in both directions. Maintenance planned between Marble Canyon Campground and the end of Highway 93 (3 km south of British Columbia and Alberta Border). Starting Sat Jun 1 at 7:00 AM MDT until Sat Jun 1 at 7:00 PM MDT. Expect minor delays. Watch for traffic control personnel. Expect speed reduction to 50k/h for guardrail repairs. Last updated Fri May 31 at 12:00 PM MDT. (DBC-8852)

Posted on: May 31, 2019


Highway 1 – Both Directions – Current Planned

Highway 1, in both directions. Bridge construction between Rodeo Dr and Greenstone Rd for 3.5 km (7 to 11 km west of Kamloops). Until Sun Jun 9. From 6:00 AM to 6:00 PM PDT daily. Last updated Fri May 31 at 10:54 AM PDT. (DBC-8853)

Posted on: May 31, 2019


Highway 1 – Current Planned

Highway 1. Road construction work between Donald Rd and Forde Station Rd for 5.0 km (23 to 18 km west of Golden). Until Mon Jul 15. From 6:00 AM to 7:00 PM MDT on weekdays and Saturday. Expect minor delays. Please obey construction speed limits and traffic control personnel. Last updated Fri May 31 at 10:20 AM MDT. (DBC-7076)

Posted on: May 31, 2019


Highway 1 – Current Planned

Highway 1. Construction work between Columbia West FSR; Columbia West FSR and Donald FSR for 4.6 km (12 to 16 km east of East Boundary of Glacier National Park). Until Sat Jun 15 at 5:00 AM MDT. From 7:30 AM to 5:30 PM MDT daily. Expect minor delays. Last updated Fri May 31 at 10:18 AM MDT. (DBC-5914)

Posted on: May 31, 2019


Highway 3 – Current Planned

Highway 3. Paving operations between Collins Rd; Collins Rd and Lafferty Pit Rd; Lafferty Pit Rd for 26.8 km (6 km east of Grand Forks to 5 km east of Christina Lake). Until Wed Jun 12 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Last updated Fri May 31 at 10:12 AM PDT. (DBC-7622)

Posted on: May 31, 2019


Highway 3 – Current Planned

Highway 3. Bridge construction between Paulson Detour Rd; Paulson Detour Rd and Paulson Detour Rd; Paulson Detour Rd (15 km east of Christina Lake). Until Fri Nov 15. Single lane alternating traffic. Monday to Sunday: 24 hours per day
Lane width reduced to 4.2 meters. Last updated Fri May 31 at 10:12 AM PDT. (DBC-6980)

Posted on: May 31, 2019


Other Roads – Both Directions – Incident

West Fraser Road. West Fraser Road, in both directions. Washout at Narcosli Creek. Long-term closure with no estimated time frame for re-establishing service. Detour via Garner Road and Webster Lake Road. Last updated Thu May 30 at 8:12 PM PDT. (DBC-2090)

Posted on: May 30, 2019


Other Roads – Both Directions – Road Condition

EAST YOUNG LAKE. EAST YOUNG LAKE, in both directions. Muddy sections between BOULE-YOUNG LAKE RD and YOUNG LAKE RD near 70 Mile House. Travel advisory in effect. BOULE-YOUNG LAKE RD TO THE END OF EAST YOUNG LAKE RD HAS SEVERE MUD, PROCEED WITH CAUTION AND WITH A SUITABLE VEHICLE. Last updated Thu May 30 at 8:11 PM PDT. (DBC-6898)

Posted on: May 30, 2019


Other Roads – Incident

Loon Lake Road. Loon Lake Road. Debris on roadway between Stevens Road and Rensch Road. Single lane alternating traffic. Until further notice. Last updated Thu May 30 at 8:11 PM PDT. (DBC-6454)

Posted on: May 30, 2019


Highway 23 – Future Planned

Highway 23. Bridge maintenance planned between Revelstoke Dam Access Rd and Wallis Rd (28 km north of Revelstoke). Starting Mon Jun 3 until Wed Jun 5. From 7:30 AM to 6:00 PM PDT on Monday, Tuesday and Wednesday. Single lane alternating traffic will be in effect. Bridge Maintenance on Mars Creek Bridge, Carnes Creek Bridge and St. Cyr Bridge. Last updated Thu May 30 at 5:03 PM PDT. (DBC-8832)

Posted on: May 30, 2019


Highway 1 – Future Planned

Highway 1. Road construction work planned between Quartz Creek FSR; Quartz Creek FSR and Wiseman Rd for 10.7 km (16 to 27 km east of East Boundary of Glacier National Park). Starting Tue Jun 4 at 8:00 AM MDT until Thu Jun 6 at 5:00 PM MDT. From 8:00 AM to 5:00 PM MDT on Tuesday, Wednesday and Thursday. Lane Closure. Single lane alternating traffic will be in effect. Motorists may experience minor delays. Last updated Thu May 30 at 4:21 PM MDT. (DBC-8826)

Posted on: May 30, 2019


Little Fort Ferry – Both Directions – Incident

Little Fort Ferry, in both directions. Possible ferry delays between the start of Little Fort Ferry and the end of Little Fort Ferry for 0.1 km (Little Fort). Detour in effect. Open to local traffic only due to Windpass Rd being closed for maintenance. Detour via Dunn Lake Road. Last updated Thu May 30 at 4:14 PM PDT. (DBC-8083)

Posted on: May 30, 2019


Other Roads – Road Condition

MOUND-LOON LAKE RD. MOUND-LOON LAKE RD. Muddy sections between MOUND RD and ROSE RD 1 km north of Clinton. Travel advisory in effect. MOUND RD TO ROSE RD HAS SEVERE MUD, PROCEED WITH CAUTION AND WITH A SUITABLE VEHICLE. Last updated Thu May 30 at 4:11 PM PDT. (DBC-6899)

Posted on: May 30, 2019


Highway 20 – Both Directions – Road Condition

Highway 20, in both directions. Water pooling between Kettle Pond Trailhead and Elsey Rd for 22.5 km (32 km east of Firvale to 38 km west of Anahim Lake). Watch for light water going across the road. Last updated Thu May 30 at 4:10 PM PDT. (DBC-8133)

Posted on: May 30, 2019


Highway 97 – Southbound – Incident

Highway 97, southbound. Rock slide at 2 km north of Summerland. Right lane closed. Expect delays. The highway is open in both directions, the southbound right lane is closed to continue to monitor the slope. Please watch for roadside workers. Last updated Thu May 30 at 2:32 PM PDT. (DBC-5194)

Posted on: May 30, 2019


Lytton Ferry – Both Directions – Incident

Lytton Ferry , in both directions. Possible ferry delays at Lytton Ferry 1 km north of Lytton. Please be advised that the Lytton Ferry is currently restricted to just light traffic and school buses due to rising water levels. Be aware ferry could be taken out at short notice due to current river levels and weather conditions. Last updated Thu May 30 at 11:36 AM PDT. (DBC-8216)

Posted on: May 30, 2019


Highway 5 – Southbound – Future Planned

Highway 5, southbound. Maintenance planned between Harmon Rd and Joyce Lane for 21.6 km (Vavenby to Clearwater). Starting Wed Jun 5 at 8:00 AM PDT until Fri Jun 7 at 5:00 PM PDT. Last updated Thu May 30 at 10:28 AM PDT. (DBC-8821)

Posted on: May 30, 2019


Highway 12 – Current Planned

Highway 12. Mowing between Laluwissin Creek FSR and Highway 99 for 38.7 km (Lillooet to 22 km north of Lytton). Watch for Shadow Vehicle – Mowing from 7am to 5pm. Last updated Thu May 30 at 10:04 AM PDT. (DBC-8820)

Posted on: May 30, 2019


Highway 99 – Current Planned

Highway 99. Mowing between Texas Creek Rd and Highway 97 for 76.5 km (Lillooet). Watch for Shadow Vehicle. Mowing from 7am to 5pm. Last updated Thu May 30 at 10:01 AM PDT. (DBC-8819)

Posted on: May 30, 2019


Highway 5 – Current Planned

Highway 5. Utility work between Josephine Rd and Allen-Meeker Rd for 49.5 km (10 km south of Little Fort to 9 km north of Kamloops). Until Tue Jun 4 at 4:00 PM PDT. Last updated Thu May 30 at 9:55 AM PDT. (DBC-8818)

Posted on: May 30, 2019


Highway 1 – Both Directions – Future Planned

Highway 1, in both directions. Construction work planned at Bruhn Bridge (Sicamous). Starting Mon Jun 3 at 7:00 AM PDT until Thu Jun 6 at 7:00 PM PDT. Single lane alternating traffic will be in effect. Geotech Drilling
10min delays. Last updated Thu May 30 at 9:33 AM PDT. (DBC-8817)

Posted on: May 30, 2019


Highway 31 – Future Planned

Highway 31. Electrical maintenance planned between Isaacs Rd and Miles Rd for 0.4 km (1 km south of Kaslo to Kaslo). Starting Tue Jun 4 at 9:00 AM PDT until Tue Jun 4 at 12:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu May 30 at 8:35 AM PDT. (DBC-8810)

Posted on: May 30, 2019


Highway 31 – Future Planned

Highway 31. Electrical maintenance planned between A Ave and 5th St for 0.2 km (Kaslo). Starting Tue Jun 4 at 12:00 PM PDT until Tue Jun 4 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu May 30 at 8:34 AM PDT. (DBC-8811)

Posted on: May 30, 2019


Highway 3 – Future Planned

Highway 3. Utility work planned between 41st Ave and Lakeview Arrow Creek Rd for 2.6 km (4 to 7 km east of Creston). Starting Fri May 31 at 7:00 AM PDT until Fri May 31 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Thu May 30 at 8:12 AM PDT. (DBC-8808)

Posted on: May 30, 2019


Highway 97 – Future Planned

Highway 97. Shoulder maintenance planned between Pavilion FSR and Chasm Rd for 37.1 km (8 km south of 70 Mile House to 13 km south of Clinton). Starting Fri May 31 at 7:00 AM PDT until Fri May 31 at 6:00 PM PDT. Lane Closure. Last updated Thu May 30 at 7:15 AM PDT. (DBC-8799)

Posted on: May 30, 2019


Highway 1 – Both Directions – Current Planned

Highway 1, in both directions. Crack sealing is underway between Walhachin Rd and Abbey Rd for 42.0 km (21 km east of Cache Creek to 6 km west of Kamloops). Until Thu Jun 6 at 3:00 PM PDT. Single lane alternating traffic. Expect minor delays. Last updated Wed May 29 at 2:10 PM PDT. (DBC-8771)

Posted on: May 30, 2019


Highway 97 – Both Directions – Future Planned

Highway 97, in both directions. Bridge maintenance planned between Nelson St and Legion Dr (Quesnel). Starting Sun Jun 2 at 6:00 PM PDT until Thu Jun 6 at 5:00 AM PDT. From 6:00 PM to 5:00 AM PDT on Sunday, Monday, Tuesday, Wednesday and Thursday. Single lane alternating traffic will be in effect. Bridge maintenance at Quesnel River Bridge. Expect 20 minute delays. Last updated Wed May 29 at 5:03 PM PDT. (DBC-8777)

Posted on: May 29, 2019


Highway 1 – Future Planned

Highway 1. Geotechnical investigation planned at Bruhn Bridge (Sicamous). Starting Mon Jun 3 at 7:00 AM PDT until Fri Jun 7 at 7:00 PM PDT. Last updated Wed May 29 at 4:40 PM PDT. (DBC-8784)

Posted on: May 29, 2019


Highway 97 – Current Planned

Highway 97. Construction work between Procter St and Fox Mountain Rd for 1.8 km (Williams Lake). Until Thu Jun 27 at 5:00 PM PDT. Expect delays. Please watch for personnel and signage. Last updated Wed May 29 at 4:09 PM PDT. (DBC-8783)

Posted on: May 29, 2019


Other Roads – Both Directions – Current Planned

Hwy 97C. Hwy 97C, in both directions. Paving operations between Merritt and Logan Lake. Until Mon Jul 15. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays. Last updated Wed May 29 at 3:23 PM PDT. (DBC-8439)

Posted on: May 29, 2019


Highway 5 – Southbound – Future Planned

Highway 5, southbound. Paving operations planned at Exit 217: Exit 217 Zopkios Brake Check (3 km south of Coquihalla Summit). Starting Sat Jun 1 at 5:00 AM PDT until Sat Jun 1 at 3:00 PM PDT. Roadway will be reduced to one lane. Speed limit 60 km/h. Last updated Wed May 29 at 2:13 PM PDT. (DBC-8722)

Posted on: May 29, 2019


Highway 31 – Both Directions – Current Planned

Highway 31, in both directions. Road maintenance work between Amundsen Rd and Birch Hill Lane for 0.7 km (4 km south of Kaslo). Until Fri May 31 at 3:30 PM PDT. From 6:30 AM to 3:30 PM PDT on Thursday. Single lane alternating traffic. Expect minor delays. Last updated Wed May 29 at 10:10 AM PDT. (DBC-8767)

Posted on: May 29, 2019


Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Mowing between Sutton Rd and MacKenzie Ave N for 11.5 km (Williams Lake). Until Thu May 30. From 7:00 AM to 5:00 PM PDT on Wednesday and Thursday. Shoulder closed. Watch for traffic control. Last updated Wed May 29 at 8:51 AM PDT. (DBC-8765)

Posted on: May 29, 2019


Highway 20 – Both Directions – Current Planned

Highway 20, in both directions. Mowing between Bond Lake Rd and Highway 97 for 7.3 km (Williams Lake). Until Thu May 30. From 7:00 AM to 5:00 PM PDT on Wednesday and Thursday. Shoulder closed. Watch for traffic control. Last updated Wed May 29 at 8:42 AM PDT. (DBC-8764)

Posted on: May 29, 2019


Highway 3A – Current Planned

Highway 3A. Geotechnical investigation between Middle Bench Rd and Upper Bench Rd for 0.6 km (Keremeos). Until Thu May 30 at 4:00 PM PDT. Last updated Mon May 27 at 4:12 PM PDT. (DBC-8671)

Posted on: May 29, 2019


Highway 3 – Current Planned

Highway 3. Construction work between College Creek FSR and Mannix Rd (2 km west of Castlegar). Until Fri Jul 26. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Watch for traffic control. Expect delays. Watch for equipment and reduced speed zones. Last updated Mon May 27 at 11:42 AM PDT. (DBC-8664)

Posted on: May 29, 2019


Highway 1 – Current Planned

[Truncated] Highway 1. Paving operations between Woolsey Creek FSR; East Boundary of Mount Revelstoke National Park and Lanark Snowshed for 15.6 km (1 km east of East Boundary of Mount Revelstoke National Park to 1 km west of West Boundary of Glacier National Park). Until Sat Jun 15 at 5:00 PM PDT. From 5:00 AM to 5:00 PM PDT on weekdays and Saturday. Single lane alternating traffic, expect up to 20 minute delays. Reduced speed in work zones and on milled surfaces. Last updated Tue May 28 at 6:1

Posted on: May 28, 2019


Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Paving operations between Cariboo Hwy 97 S and North Lakeside Dr for 8.1 km (150 Mile House to 3 km south of Williams Lake). Until Thu Jun 27 at 6:00 PM PDT. Single lane alternating traffic. Expected delays of 5 minutes. Please watch for personnel and signage. Last updated Tue May 28 at 4:08 PM PDT. (DBC-8729)

Posted on: May 28, 2019


Upper Arrow Lake Ferry – Incident

Upper Arrow Lake Ferry. There will be required maintenance at Upper Arrow Lake. Starting Tue Jun 11 at 11:00 PM PDT until Wed Jun 12 at 5:00 AM PDT. Ferry will be out of service. Next update time Wed Jun 12 at 5:00 AM PDT. Last updated Tue May 28 at 2:29 PM PDT. (DBC-8723)

Posted on: May 28, 2019


Highway 97 – Both Directions – Future Planned

Highway 97, in both directions. Paving operations planned between William R Bennett Bridge and Abbott St for 1.0 km (Kelowna). Starting Sun Jun 2 at 7:00 PM PDT until Thu Jun 6 at 6:00 AM PDT. From 7:00 PM to 6:00 AM PDT on Sunday, Monday, Tuesday, Wednesday and Thursday. Last updated Tue May 28 at 11:05 AM PDT. (DBC-8720)

Posted on: May 28, 2019


Highway 3 – Current Planned

Highway 3. Construction work between Hedley-Nickleplate Rd and 1 St for 20.4 km (7 km east of Hedley to Keremeos). Until Sat Sep 28 at 4:00 PM PDT. Shoulder remediation. Last updated Fri May 24 at 4:06 PM PDT. (DBC-8586)

Posted on: May 28, 2019


Highway 97 – Current Planned

Highway 97. Road sweeping between Beaver Lake Rd and Edwards Rd for 55.0 km (14 km south of Quesnel to 30 km north of Wildwood). Until Sat Jun 1 at 6:00 AM PDT. From 9:00 PM to 6:00 AM PDT on weekdays. Lane closures in both directions in effect. Last updated Mon May 27 at 6:06 PM PDT. (DBC-8676)

Posted on: May 27, 2019

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn
Share on email
Email

Activity Steam

Mon, Oct 14, 2019 at 5:31 pm - Darryl Schmidt smiled at the place: Cinnamon Ridge Hoodoos
Sun, Oct 13, 2019 at 1:54 pm - Darryl Schmidt smiled at the post: Orkadian Farms celebrates a century of farming in B.C.
Fri, Oct 11, 2019 at 10:14 am - Hank Thetank indicated that they are Interested in Art in Public Spaces at Kamloops Airport 2019
Wed, Sep 25, 2019 at 1:24 am - Darryl Schmidt smiled at the event: Art in Public Spaces at Kamloops Airport 2019
Wed, Sep 25, 2019 at 1:23 am - Darryl Schmidt indicated that they are Interested in Art in Public Spaces at Kamloops Airport 2019
Sun, Sep 15, 2019 at 3:43 pm - Darryl Schmidt smiled at the place: Aberdeen Hills Park
Fri, Aug 30, 2019 at 12:11 pm - Darryl Schmidt smiled at the event: Larry Pilcher’s ~ Au Contraire
Sun, Aug 18, 2019 at 3:55 pm - Hank Thetank created a new Profile
Sat, Aug 17, 2019 at 1:50 pm - Hank Thetank smiled at the event: Mike Alexander in our KAC Galleries
Sat, Aug 17, 2019 at 1:49 pm - Darryl Schmidt indicated that they are Interested in Mike Alexander in our KAC Galleries
Fri, Jul 26, 2019 at 10:45 am - Darryl Schmidt posted on their blog: I would like you to know about this and then comment on it like a champ
Fri, Jul 26, 2019 at 9:05 am - Hank Thetank posted on their blog: Everyone should go and see this
Sat, May 11, 2019 at 10:06 pm - Darryl Schmidt created a Creative Profile for Darloso Amtigadon
Thu, Mar 28, 2019 at 6:09 pm - Archie Andrews created a new Profile
Mon, Mar 25, 2019 at 9:17 pm - Fred Flintstone created a new Profile
Full Stream