Kootenays
Highway 95A – Southbound – Current Planned

Highway 95A, southbound. Road maintenance work between Hannay St and Fortier St for 0.6 km (Kimberley). Until Sun Jul 21. From 9:00 AM to 3:00 PM MDT on weekends, Thursday and Friday. Watch for traffic control. Last updated Fri Jun 21 at 12:09 PM MDT. (DBC-65414)

Posted on: July 18, 2024


Kootenays
Highway 95A – Both Directions – Future Planned

Highway 95A, in both directions. Utility work planned at Standard Hill Rd (Cranbrook). Starting Mon Jul 22 at 7:00 AM MDT until Wed Jul 24 at 5:00 PM MDT. Work is from Standard Hill Rd to Cranbrook Underpass Bridge. Hydrovac works near Lagoons for site investigation. Last updated Wed Jul 17 at 4:00 PM MDT. (DBC-66284)

Posted on: July 17, 2024


Thompson Okanagan
Highway 5 – Southbound – Future Planned

Highway 5, southbound. Construction work planned between Vavenby Bridge Rd and Harmon Rd for 2.6 km (Vavenby). Starting Mon Jul 22 until Sat Jul 27. From 8:00 AM to 6:00 PM PDT daily. Lane Closure. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Wed Jul 17 at 2:48 PM PDT. (DBC-66282)

Posted on: July 17, 2024


Thompson Okanagan
Highway 1 – Both Directions – Current Planned

Highway 1 (TransCanada Highway), in both directions. Paving operations between Pacific Way and Grand Blvd for 11.2 km (Kamloops). Until Fri Jul 26 at 6:00 AM PDT. From 7:00 PM to 6:00 AM PDT on weekdays and Sunday. Lane Closure. Watch for traffic control. Expect up to 15 minute delays. Next update time Fri Jul 26 at 6:00 AM PDT. Last updated Wed Jul 17 at 11:12 AM PDT. (DBC-64552)

Posted on: July 17, 2024


Thompson Okanagan
Highway 5A – Both Directions – Current Planned

Highway 5A, in both directions. Construction work at Airport Rd (Princeton). Until Wed Jul 31 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on Tuesday, Wednesday and Thursday. Single lane alternating traffic. Work is between Airport Road and Coyote Valley Rd. Please obey all construction signs and watch for crews and equipment. Last updated Mon Jul 15 at 3:11 PM PDT. (DBC-66203)

Posted on: July 16, 2024


Kootenays
Highway 1 – Both Directions – Current Planned

Highway 1, in both directions. Road construction work at Highway 95. Until Sun Jul 21. Expect delays due to congestion. Railway construction work. Last updated Mon Jul 15 at 5:52 PM MDT. (DBC-66205)

Posted on: July 15, 2024


Cariboo
Highway 26 – Current Planned

Highway 26. Utility work between Pooley Street and Ski Hill Road in Wells. Until Fri Jul 26 at 4:00 PM PDT. Westbound lane closure. Single lane alternating traffic. 5 minute delays. Watch for signs and personnel. Last updated Mon Jul 15 at 11:55 AM PDT. (DBC-66190)

Posted on: July 15, 2024


Thompson Okanagan
Highway 1 – Both Directions – Current Planned

Highway 1 (TransCanada Highway), in both directions. Bridge construction at Nicomen River Rd (14 km east of Lytton). Until Sat Nov 30. Single lane alternating traffic. Watch for traffic control. Expect delays. Speed reduced to 30km/hr. Highway stoppages with expected delays of 15 minutes. Project completion: Nov 30, 2024. Next update time Mon Jul 29 at 10:00 AM PDT. Last updated Mon Jul 15 at 11:10 AM PDT. (DBC-56391)

Posted on: July 15, 2024


Thompson Okanagan
Highway 5 – Southbound – Current Planned

Highway 5 (Coquihalla North), southbound. Utility work between West Kamloops and Inks Lake Rd for 1.9 km (Kamloops). Until Fri Jul 26. From 8:00 AM to 4:00 PM PDT on weekdays and Saturday. Right lane closed. Watch for traffic control. Last updated Thu Jun 27 at 11:05 AM PDT. (DBC-65642)

Posted on: July 15, 2024


Kootenays
Highway 3 – Both Directions – Current Planned

Highway 3 (Crowsnest Highway), in both directions. Bridge construction at Jaffray Overhead Bridge (5 km east of Jaffray). Until Sat Aug 31. Expect delays. Watch for flagging to allow for trucks to enter and exit site. Watch for speed reductions and crews working in the area. Last updated Sat Jul 13 at 2:32 PM MDT. (DBC-60199)

Posted on: July 13, 2024


Thompson Okanagan
Highway 1 – Both Directions – Current Planned

Highway 1 (TransCanada Highway), in both directions. Road maintenance work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 6:00 AM to 5:00 PM PDT on weekdays. Road closed intermittently. Watch for traffic control. Next update time Fri Jul 26 at 10:00 AM PDT. Last updated Fri Jul 12 at 10:04 AM PDT. (DBC-64961)

Posted on: July 12, 2024


Cariboo
Highway 26 – Both Directions – Current Planned

Highway 26, in both directions. Paving operations at 500 Nyland Lake Rd (16 km east of Quesnel). Until Wed Sep 11 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Lane Closure. Pilot car controlled. Last updated Tue Jul 9 at 7:26 PM PDT. (DBC-66046)

Posted on: July 10, 2024


Thompson Okanagan
Other Roads – Both Directions – Current Planned

Youngsberg Road, in both directions. Bridge construction at Youngsberg Bridge near Princeton. Road closed. Estimated time of opening not available. No vehicle or pedestrian crossing available. Next update time Mon Sep 9 at 3:00 PM PDT. Last updated Mon Jul 8 at 3:46 PM PDT. (DBC-35978)

Posted on: July 8, 2024


Kootenays
Highway 1 – Both Directions – Current Planned

Highway 1 (Kicking Horse Pass), in both directions. Construction work between Golden Donald Upper Rd and Yoho Bridge for 5.3 km (2 to 7 km east of Golden). Until Wed Jul 31 at 5:30 PM MDT. Highway is reduced to one lane in each direction. 2-Hour closures between Sun July 28 at 10pm and Mon July 29 at 7am MDT. Watch for Traffic Control Personnel on site. Next update time Mon Jul 29 at 9:00 AM MDT. Last updated Mon Jul 8 at 8:46 AM MDT. (DBC-62137)

Posted on: July 8, 2024


Thompson Okanagan
Highway 97 – Both Directions – Incident

Highway 97, in both directions. Landslide between Callan Rd and N Beach Rd for 1.5 km (2 to 1 km north of Summerland). Landslide between Callan Rd and N Beach Rd. Road open to two-way traffic. Expect intermittent closures of 15 minutes. Next update time Tue Jul 23 at 12:30 PM PDT. Last updated Sat Jul 6 at 3:07 PM PDT. (DBC-55794)

Posted on: July 6, 2024


Kootenays
Highway 22 – Southbound – Current Planned

Highway 22, southbound. Paving operations between 23rd St and Minto Rd for 3.9 km (Castlegar). Until Fri Jul 26 at 6:30 AM PDT. From 5:30 PM to 6:30 AM PDT on weekdays and Sunday. Single lane alternating traffic. Night time milling and paving. Reduce speed. Watch for crew and equipment. Watch for uneven pavement and milled surfaces. Last updated Sun Jun 30 at 1:51 PM PDT. (DBC-65695)

Posted on: July 3, 2024


Kootenays
Highway 3 – Eastbound – Current Planned

Highway 3 (Crowsnest Highway), eastbound. Paving operations between Mannix Rd and Columbia Ave for 4.3 km (Castlegar). Until Fri Jul 26 at 6:30 AM PDT. From 5:30 PM to 6:30 AM PDT on weekdays and Sunday. Single lane alternating traffic. Night time milling and paving. Reduce speed. Watch for crew and equipment. Watch for uneven pavement and milled surfaces. Last updated Sun Jun 30 at 1:51 PM PDT. (DBC-65694)

Posted on: July 3, 2024


Thompson Okanagan
Highway 97A – Current Planned

Highway 97A. Utility work between Stepney Cross Rd and Baptiste Rd for 0.5 km (3 km south of Enderby). Until Fri Jul 26. From 7:30 AM to 5:30 PM PDT daily. Shoulder closed. Expect delays due to congestion. Speed reduction to 50km/hr. Prepare for random minor stoppages. Last updated Fri Jun 28 at 9:26 AM PDT. (DBC-65665)

Posted on: July 3, 2024


Thompson Okanagan
Other Roads – Current Planned

Ashnola Rd. Bridge maintenance between River Rd and Highway 3. Until Fri Aug 2. From 8:30 AM to 3:00 PM PDT on Monday, Tuesday, Wednesday and Thursday. Road closed. Bridge will re-open after 3:00pm daily. Last updated Thu Jun 20 at 11:13 AM PDT. (DBC-65385)

Posted on: July 2, 2024


Thompson Okanagan
Highway 5 – Southbound – Current Planned

Highway 5, southbound. Utility work between Bain Rd and Clearwater Village Rd for 1.4 km (Clearwater). Until Wed Jul 31. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Last updated Tue Jun 25 at 3:27 PM PDT. (DBC-65568)

Posted on: July 2, 2024


Kootenays
Highway 1 – Both Directions – Current Planned

Highway 1 (TransCanada Highway), in both directions. Bridge construction between Albert Canyon West Bridge and Albert Canyon Rd (3 km east of East Boundary of Mount Revelstoke National Park). Until Sun Sep 15. From 7:00 AM to 5:30 PM PDT daily. Eastbound lane closure. Detour in effect. Speed reduction from 100 km/h to 60 km/h in effect. Watch for traffic control. No delays expected. Last updated Wed Jun 26 at 1:11 PM PDT. (DBC-65605)

Posted on: June 30, 2024


Kootenays
Highway 1 – Both Directions – Current Planned

Highway 1 (TransCanada Highway), in both directions. Construction work between Meadows in the Sky Pkwy and West Boundary of Mount Revelstoke National Park for 14.9 km (Revelstoke to 1 km west of West Boundary of Mount Revelstoke National Park). Until Thu Aug 1. From 7:00 PM to 7:00 AM PDT on weekdays and Sunday. Single lane alternating traffic. Up to 15 min delays. Obey traffic control personnel. Last updated Mon Jun 17 at 1:03 PM PDT. (DBC-65189)

Posted on: June 19, 2024


Kootenays
Highway 93 – Both Directions – Current Planned

Highway 93, in both directions. Construction work between Radium Hill Rd and Stanley St (1 km south of Radium Hot Springs). Until Thu Oct 31. From 7:00 AM to 6:00 PM MDT on weekdays and Saturday. Roadway reduced to one lane. Expect minor delays. The traffic will be reduced to 50km/hr. Last updated Mon Jun 17 at 9:11 AM MDT. (DBC-65247)

Posted on: June 17, 2024


Cariboo
Other Roads – Both Directions – Incident

Soda-Creek Macalister Road, in both directions. Landslide at 10 kms from the Junction of Highway 97. Road closed. Geotech assessment underway. Next update time Fri Jul 26 at 2:00 PM PDT. Last updated Sat Jun 15 at 2:03 PM PDT. (DBC-16911)

Posted on: June 15, 2024


Cariboo
Highway 97 – Current Planned

Highway 97 (Cariboo Connector). Utility work between Canim-Hendrix Lake Rd and Dawson Rd for 5.3 km (100 Mile House). Until Fri Aug 30. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Pole installations on 103 Mile Hill. Speed reduction to 50 km/h. Different closures required for different sections within the work span. Intermittent stoppages to occur for 3 mins max (ITC) when cable is crossing the Highway as needed. Last updated Fri Jun 7 at 3:46 PM PDT. (DBC-64956)

Posted on: June 10, 2024


Cariboo
Road 40 – Current Planned

Road 40 (Lillooet-Pioneer Rd). Utility work between Gun Creek Pit Rd and Mission Mountain Rd for 48.0 km (91 to 43 km west of Lillooet). Until Mon Sep 23. From 8:00 AM to 8:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 20 minutes. Please watch for signage and personnel. Last updated Fri Jun 7 at 3:58 PM PDT. (DBC-64947)

Posted on: June 8, 2024


Thompson Okanagan
Other Roads – Both Directions – Current Planned

Halston Avenue Connector, in both directions. Bridge construction between Kingston Avenue and Salish Road in Kamloops. Lane closures in both directions in effect. Watch for traffic control. Possible delays. Next update time Mon Sep 30 at 9:00 AM PDT. Last updated Thu Jun 6 at 3:09 PM PDT. (DBC-61191)

Posted on: June 6, 2024


Cariboo
Highway 20 – Both Directions – Current Planned

Highway 20, in both directions. Road maintenance work between Fisheries Pool Campground Access Rd and Rainbow Range Trailhead for 36.3 km (17 km east of Firvale to 39 km west of Anahim Lake). Until Wed May 7, 2025. From 7:00 AM to 3:30 PM PDT on weekdays. Single lane alternating traffic. Last updated Tue May 28 at 6:06 PM PDT. (DBC-64459)

Posted on: May 28, 2024


Kootenays
Highway 23 – Northbound – Future Planned

Highway 23, northbound. Utility work planned between Goldstream Rd and Downie St – Mica Village for 48.4 km (5 to 54 km south of Mica Dam). Starting Tue Aug 6 until Fri Aug 16. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. For BC Hydro pole replacement. Speed reduction to 60 km/h. Last updated Tue May 28 at 2:54 PM PDT. (DBC-64321)

Posted on: May 28, 2024


Thompson Okanagan
Highway 1 – Both Directions – Current Planned

Highway 1 (TransCanada Highway), in both directions. Ditching between Bolton Rd and Schneider Pl (1 km east of Tappen). Until Sat Aug 31. From 7:00 PM to 10:30 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays up to 20 minutes. Last updated Tue May 28 at 2:21 PM PDT. (DBC-64006)

Posted on: May 28, 2024


Thompson Okanagan
Highway 1 – Both Directions – Current Planned

Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Tappen Valley Rd for 3.2 km (Tappen). Until Tue Dec 31. From 7:00 AM to 12:00 AM PDT on weekdays and Saturday. Expect delays. Reduced speed through work zone at 80 km/hr during inactive work, 60 km/hr during active work. Intermittent minor stoppages. Last updated Tue May 28 at 2:20 PM PDT. (DBC-57219)

Posted on: May 28, 2024


Thompson Okanagan
Highway 1 – Both Directions – Current Planned

Highway 1 (TransCanada Highway), in both directions. Blasting between Tappen Beach Rd and 65 Ave NW (1 km west of Salmon Arm). Until Thu Oct 31. From 5:30 PM to 3:00 AM PDT and from 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Up to one 20 minute closure daily. Additional 5 minute closures may be required intermittently. Watch for traffic control. Last updated Tue May 28 at 2:20 PM PDT. (DBC-57687)

Posted on: May 28, 2024


Cariboo
Other Roads – Both Directions – Incident

Durrell Road, in both directions. Landslide at 700m from Highway 97. Road closed. Detour in effect. Detour available via Highway 97 and Dale Lake Road. Next update time Wed Oct 23 at 12:00 PM PDT. Last updated Mon Apr 22 at 1:30 PM PDT. (DBC-27390)

Posted on: April 22, 2024


Cariboo
Other Roads – Both Directions – Incident

Quesnel-Hixon Road, in both directions. Landslide at Cottonwood bridge. Road closed. Next update time Wed Oct 23 at 2:00 PM PDT. Last updated Wed Apr 17 at 2:22 PM PDT. (DBC-28386)

Posted on: April 17, 2024


Cariboo
Other Roads – Incident

Johnston Bridge. Travel advisory in effect at Front St. In Quesnel. Bridge is open to vehicles with gross vehicle weight rating of 10,000 kilograms or lower. Industrial traffic and heavy commercial traffic must detour via Plywood Rd and Maple Drive. Industrial traffic is not allowed to detour through Johnston Subdivision. Next update time Fri Apr 11, 2025 at 2:00 PM PDT. Last updated Thu Apr 11 at 10:28 AM PDT. (DBC-47311)

Posted on: April 11, 2024


Cariboo
Other Roads – Both Directions – Incident

McKay Road, in both directions. Flooding at McKay Road. Road closed. Next update time Thu Aug 8 at 9:00 AM PDT. Last updated Mon Apr 8 at 7:57 AM PDT. (DBC-53013)

Posted on: April 8, 2024


Cariboo
Other Roads – Incident

Kersley-Dale Landing Rd. Landslide at 500 metres in from Highway 97 Intersection. Road closed. A temporary Single Lane Gravel Road for Local Traffic via Arnoldus Road. Next update time Thu Aug 8 at 9:00 AM PDT. Last updated Mon Apr 8 at 7:57 AM PDT. (DBC-23443)

Posted on: April 8, 2024


Kootenays
Highway 31 – Incident

Highway 31. Watch for falling rocks between Balfour and Block Rd for 73.7 km (1 km south of Meadow Creek to Balfour). Last updated Fri Mar 29 at 8:59 PM PDT. (DBC-61482)

Posted on: March 29, 2024


Kootenays
Highway 3A – Incident

Highway 3A. Watch for falling rocks between Fraser Subdivision Rd and Junction Hwy 3 for 77.6 km (1 km south of Kootenay Bay Ferry Landing to Creston). Last updated Fri Mar 29 at 8:58 PM PDT. (DBC-61894)

Posted on: March 29, 2024