%%tb-image-alt-text%%
Kamloops.me

Me and my Kamloops

Other Roads – Both Directions – Future Planned

Thomason Road/Clarricoates Road, in both directions. Paving operations planned between Hwy 95A and Treichel Road in Kimberley. Starting Wed May 12 at 7:00 AM MDT until Thu May 20 at 6:00 PM MDT. From 7:00 AM to 6:00 PM MDT on weekdays and Saturday. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Mon May 10 at 10:38 AM MDT. (DBC-29016)

Posted on: May 10, 2021


Other Roads – Southbound – Future Planned

HWY 5, southbound. Utility work planned between Blackwater Rd and Mann Rd 1 km south of Clearwater. Starting Tue May 11 at 9:00 AM PDT until Tue May 11 at 5:00 PM PDT. Right lane will be closed. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Mon May 10 at 10:09 AM PDT. (DBC-29023)

Posted on: May 10, 2021


Highway 5 – Southbound – Future Planned

Highway 5, southbound. Tree pruning planned between Hoirup Rd and Vavenby Bridge Rd for 7.9 km (Vavenby). Starting Mon May 17 at 7:00 AM PDT until Mon May 17 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Mon May 10 at 10:30 AM PDT. (DBC-29026)

Posted on: May 10, 2021


Other Roads – Both Directions – Future Planned

Banman Crescent, in both directions. Paving operations planned at Hwy 95A in Kimberley. Starting Wed May 12 at 7:00 AM MDT until Thu May 20 at 6:00 PM MDT. From 7:00 AM to 6:00 PM MDT on weekdays and Saturday. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Mon May 10 at 10:41 AM MDT. (DBC-29017)

Posted on: May 10, 2021


Other Roads – Future Planned

BLACKWATER ROAD. Pavement patching is planned. Between BONNIE ROAD and RAWLINGS ROAD. Starting Mon May 10 at 12:00 PM PDT until Mon May 10 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Mon May 10 at 10:07 AM PDT. (DBC-29022)

Posted on: May 10, 2021


Highway 3 – Current Planned

Highway 3. Road sweeping between Junction Hwy 6NS and Hood Rd for 65.7 km (14 km east of Salmo to Creston). Until Fri May 14 at 3:00 PM PDT. From 7:00 AM to 3:00 PM PDT on weekdays. Single lane alternating traffic. Last updated Mon May 10 at 9:15 AM PDT. (DBC-29013)

Posted on: May 10, 2021


Highway 5 – Northbound – Future Planned

Highway 5, northbound. Utility work planned between Russell St and Westsyde Rd for 4.4 km (Barriere). Starting Wed May 19 until Fri May 21. From 8:00 AM to 5:00 PM PDT on Wednesday, Thursday and Friday. Single lane alternating traffic will be in effect. Northbound lane will be closed. Last updated Mon May 10 at 9:56 AM PDT. (DBC-29020)

Posted on: May 10, 2021


Other Roads – Both Directions – Future Planned

St. Mary’s Lake Road, in both directions. Paving operations planned at Lakeside Road in Kimberley. Starting Wed May 12 at 7:00 AM MDT until Thu May 20 at 6:00 PM MDT. From 7:00 AM to 6:00 PM MDT on weekdays and Saturday. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Starting east of the lake to 100meters wets of Lakeside Road. Last updated Mon May 10 at 10:45 AM MDT. (DBC-29019)

Posted on: May 10, 2021


Other Roads – Current Planned

WEST FRASER ROAD. Pavement patching underway between RURIC SPRING DRIVE and MARSH ROAD. Single lane alternating traffic. Last updated Mon May 10 at 10:03 AM PDT. (DBC-29021)

Posted on: May 10, 2021


Other Roads – Both Directions – Future Planned

Thompson Road, in both directions. Paving operations planned between Hwy 95A and Sanderson Road in Kimberley. Starting Wed May 12 at 7:00 AM MDT until Thu May 20 at 6:00 PM MDT. From 7:00 AM to 6:00 PM MDT on weekdays and Saturday. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Mon May 10 at 10:34 AM MDT. (DBC-29015)

Posted on: May 10, 2021


Highway 97 – Both Directions – Future Planned

Highway 97, in both directions. Bridge maintenance planned between Sandhill Rd and Burnaby Ave W for 7.3 km (Penticton). Starting Wed May 12 at 9:00 AM PDT until Wed May 12 at 2:00 PM PDT. Lane closures in both directions planned. Bridge cleaning on Skaha Bridge and Eckhardt Bridge. Watch for slow moving vehicles. Last updated Mon May 10 at 8:23 AM PDT. (DBC-29004)

Posted on: May 10, 2021


Other Roads – Current Planned

HWY 3. Bridge maintenance between ERIE ROSS SPUR ROAD and JUNCTION OF HWY 3B 1 km north of Salmo. Until Tue May 11 at 2:00 PM PDT. From 7:30 AM to 2:00 PM PDT on Monday and Tuesday. Single lane alternating traffic. Last updated Mon May 10 at 8:35 AM PDT. (DBC-29005)

Posted on: May 10, 2021


Highway 5 – Southbound – Current Planned

Highway 5, southbound. Shoulder maintenance between West Kamloops and Exit 336: Walloper for 27.2 km (Kamloops to 14 km north of Surrey Lake Summit). Until Mon May 10 at 4:00 PM PDT. Road sweeping. Lane Closure. Last updated Mon May 10 at 8:27 AM PDT. (DBC-29006)

Posted on: May 10, 2021


Highway 3 – Both Directions – Current Planned

Highway 3, in both directions. Bridge maintenance between 9th Ave and Cedar Ave for 0.6 km (Fernie). Until Mon May 10 at 2:00 PM MDT. Single lane alternating traffic. Watch for traffic control. Last updated Mon May 10 at 8:34 AM MDT. (DBC-28994)

Posted on: May 10, 2021


Road 40 – Future Planned

Road 40 (Lillooet-Pioneer Rd). Bridge maintenance planned between West Pavilion Rd and Moon Creek Rd (2 km west of Lillooet). Starting Tue May 11 at 7:00 AM PDT until Thu May 20 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays. Lane Closure. Due to redecking Bridge River Bridge Expect 20 minute delays. Last updated Mon May 10 at 7:40 AM PDT. (DBC-28997)

Posted on: May 10, 2021


Highway 97C – Both Directions – Current Planned

Highway 97C, in both directions. Road sweeping between Pennask Summit and Elkhart Rd for 21.7 km (Pennask Summitt). Until Mon May 10 at 4:30 PM PDT. Please watch for slow moving vehicles. Last updated Mon May 10 at 7:57 AM PDT. (DBC-29002)

Posted on: May 10, 2021


Highway 3 – Both Directions – Future Planned

Highway 3, in both directions. Shoulder maintenance between Sparwood Dump Rd and Alexander Bridge for 3.9 km (Sparwood). Until Mon May 10 at 2:00 PM MDT. Single lane alternating traffic. Watch for traffic control. Last updated Mon May 10 at 8:42 AM MDT. (DBC-28999)

Posted on: May 10, 2021


Highway 97C – Both Directions – Current Planned

Highway 97C, in both directions. Maintenance at Kirkland Ranch Rd (4 km south of Ashcroft). Single lane alternating traffic. 50% legal axel weight. Last updated Mon May 10 at 7:57 AM PDT. (DBC-29001)

Posted on: May 10, 2021


Highway 97 – Current Planned

Highway 97. Road sweeping between Canim-Hendrix Lake Rd and Park Dr for 3.6 km (100 Mile House). Until Mon May 10 at 4:00 PM PDT. Single lane alternating traffic. Expect up to 15 Minute delays. Last updated Mon May 10 at 7:27 AM PDT. (DBC-28993)

Posted on: May 10, 2021


Highway 3A – Westbound – Future Planned

Highway 3A, westbound. Bridge maintenance planned between Insight Dr and Reibin Rd for 0.7 km (6 km west of Nelson). Starting Mon May 10 at 8:00 AM PDT for two days. Single lane alternating traffic will be in effect. Last updated Mon May 10 at 6:46 AM PDT. (DBC-28983)

Posted on: May 10, 2021


Westside Rd – Eastbound – Future Planned

Westside Rd, eastbound. Road sweeping planned between Highway 97 South and Browse Rd for 15.0 km (West Kelowna). Starting Mon May 10 at 5:00 PM PDT until Tue May 11 at 2:00 AM PDT. Watch for slow moving vehicles. Last updated Mon May 10 at 6:15 AM PDT. (DBC-28980)

Posted on: May 10, 2021


Highway 1 – Westbound – Future Planned

Highway 1, westbound. Bridge maintenance at Donald Bridge (24 km west of Golden). Until Mon May 10 at 3:00 PM MDT. Westbound lane closure. Last updated Mon May 10 at 7:14 AM MDT. (DBC-28979)

Posted on: May 10, 2021


Highway 97 – Northbound – Incident

Highway 97, northbound. Vehicle incident between Junction Hwy 97C and Glenrosa Rd (West Kelowna). Expect delays. Lane blocked. Emergency vehicles on scene. Watch for traffic control. Next update time Sun May 9 at 11:00 PM PDT. Last updated Sun May 9 at 9:54 PM PDT. (DBC-28975)

Posted on: May 9, 2021


Other Roads – Both Directions – Future Planned

Westside road , in both directions. Road sweeping planned between Hwy 97 and Westside Road near Kelowna. Starting Sun May 9 at 7:00 PM PDT until Mon May 10 at 3:00 AM PDT. Expect delays. Watch for traffic control personnel. Last updated Sun May 9 at 4:49 PM PDT. (DBC-28972)

Posted on: May 9, 2021


Highway 97C – Both Directions – Current Planned

Highway 97C, in both directions. Road sweeping between Pennask Summit and Loon Lake Rd for 34.4 km (Pennask Summitt). Until Sun May 9 at 4:00 PM PDT. Watch for slow moving vehicles. Last updated Sun May 9 at 6:43 AM PDT. (DBC-28967)

Posted on: May 9, 2021


Highway 1 – Both Directions – Incident

Highway 1, in both directions. Roadway obstruction between 2nd Nations Rd and 1 Ave SW (Salmon Arm). Assessment in progress. Expect delays. Watch for traffic control. Road hazard in construction zone. Slow down. Watch for traffic control. Next update time Sun May 9 at 1:30 AM PDT. Last updated Sun May 9 at 12:36 AM PDT. (DBC-28966)

Posted on: May 9, 2021


Highway 99 – Northbound – Incident

Highway 99, northbound. Debris on roadway between Fountain Valley Rd and Sallus Creek Rd for 8.6 km (10 to 18 km north of Lillooet). Watch for slippery sections. Loose gravel on road from an MVI. 15KM north of Lillooet. Last updated Sat May 8 at 2:42 PM PDT. (DBC-28963)

Posted on: May 8, 2021


Highway 93 – Both Directions – Incident

Highway 93, in both directions. Vehicle incident between Simpson River Trail and Kootenay National Pk (10 km south of British Columbia and Alberta Border). Road closed. Assessment in progress. Estimated time of opening not available. Next update time Sat May 8 at 2:30 PM MDT. Last updated Sat May 8 at 1:24 PM MDT. (DBC-28962)

Posted on: May 8, 2021


Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Road sweeping between Forbes Rd and Wright Station Rd for 7.5 km (30 km north of 100 Mile House to 33 km south of 150 Mile House). Until Sat May 8 at 3:00 PM PDT. Reduce speed to 50km. Last updated Sat May 8 at 8:08 AM PDT. (DBC-28958)

Posted on: May 8, 2021


Highway 99 – Incident

Highway 99. Vehicle incident at Fountain Valley Rd (10 km north of Lillooet). Single lane alternating traffic. Last updated Sat May 8 at 12:14 AM PDT. (DBC-28957)

Posted on: May 8, 2021


Highway 1 – Both Directions – Current Planned

Highway 1, in both directions. Construction work between Columbia West FSR and Redgrave Rest Area for 5.6 km (14 to 8 km east of East Boundary of Glacier National Park). Until Thu Nov 23, 2023. From 7:00 AM to 6:00 PM MDT on weekdays and Saturday. Expect delays. Watch for traffic control. Last updated Fri May 7 at 5:31 PM MDT. (DBC-28953)

Posted on: May 7, 2021


Highway 93 – Road Condition

Highway 93. Strong crosswinds between Wasa Junction and Stanley St for 102.3 km (3 km north of Wasa to Radium Hot Springs). Last updated Fri May 7 at 3:50 PM MDT. (DBCRCON-101117)

Posted on: May 7, 2021


Other Roads – Both Directions – Future Planned

Kirkland Ranch Road, in both directions. Maintenance planned between 1km and Sundance Road. Starting Sat May 8 at 8:00 AM PDT until Sat May 8 at 2:00 PM PDT. Road will be closed for repairs. Last updated Fri May 7 at 2:41 PM PDT. (DBC-28950)

Posted on: May 7, 2021


Highway 97 – Northbound – Future Planned

Highway 97, northbound. Bridge maintenance planned at Abbott St (Kelowna). Starting Sun May 9 at 9:00 PM PDT until Mon May 10 at 5:00 AM PDT. Lane Closure. WIDE LOADS use caution and call ahead 250-469-1363 or 250-469-0330. Last updated Fri May 7 at 1:49 PM PDT. (DBC-28944)

Posted on: May 7, 2021


Highway 97 – Southbound – Future Planned

Highway 97, southbound. Bridge maintenance planned between Abbott St and William R Bennett Bridge (Kelowna). Starting Mon May 10 at 9:00 PM PDT until Tue May 11 at 5:00 AM PDT. Lane Closure. Crack sealing is planned. Last updated Fri May 7 at 1:50 PM PDT. (DBC-28945)

Posted on: May 7, 2021


Highway 97 – Eastbound – Future Planned

Highway 97, eastbound. Utility work planned between Monte Lake Rd and Paxton Valley Rd for 0.1 km (19 to 18 km east of Monte Creek). Starting Wed May 19 at 9:00 AM PDT until Fri May 28 at 5:00 PM PDT. BC Hydro has line work to perform along Hwy 1, 3Km East of Monte Creek between Rocky Point Rd & Hwy 97. TCPs to perform speed reduction to 60km/h, no traffic to be stopped. Last updated Fri May 7 at 11:28 AM PDT. (DBC-28938)

Posted on: May 7, 2021


Kootenay Lake Ferry – Incident

Kootenay Lake Ferry. 1 sailing wait at Balfour Terminal. Until Fri May 7 at 3:00 PM PDT. Due to high traffic volume. Next update time Fri May 7 at 3:00 PM PDT. Last updated Fri May 7 at 11:40 AM PDT. (DBC-28941)

Posted on: May 7, 2021


Highway 97 – Eastbound – Future Planned

Highway 97, eastbound. Utility work planned between Monte Creek and Duck Range Rd (1 km east of Monte Creek). Starting Wed May 19 at 9:00 AM PDT until Fri May 28 at 5:00 PM PDT. BC Hydro has line work to perform along Hwy 97 735m North of Duck Range Rd, Kamloops. TCPs to perform speed reduction to 50km/h. Traffic will only need to be stopped in the event of an emergency. Last updated Fri May 7 at 11:38 AM PDT. (DBC-28940)

Posted on: May 7, 2021


Highway 95 – Both Directions – Future Planned

Highway 95, in both directions. Electrical maintenance planned between Champagne Rd and Reflection Lake Rd for 0.5 km (1 km south of Golden to Golden). Starting Sat May 8 at 9:00 AM MDT until Sat May 8 at 10:00 AM MDT. Lane Closure. Expect minor delays. Last updated Fri May 7 at 12:29 PM MDT. (DBC-28939)

Posted on: May 7, 2021


Highway 97 – Future Planned

Highway 97. Utility work planned between Barnhartvale Rd and Hanna Rd for 0.1 km (11 km east of Monte Creek). Starting Wed May 19 at 9:00 AM PDT until Fri May 28 at 5:00 PM PDT. BC Hydro has line work to perform along Barnhartvile Rd 5km South of Hwy 97, Kamloops between Robins Creek Road and Robins Range Road. TCPs to perform speed reduction to 50km/h. Traffic will only need to be stopped in the event of an emergency. Last updated Fri May 7 at 10:42 AM PDT. (DBC-28934)

Posted on: May 7, 2021


Kootenay Lake Ferry – Incident

Kootenay Lake Ferry. 1 sailing wait at Balfour Terminal. Until Fri May 7 at 11:30 AM PDT. Due to high traffic volume. Next update time Fri May 7 at 11:30 AM PDT. Last updated Fri May 7 at 8:34 AM PDT. (DBC-28925)

Posted on: May 7, 2021


Highway 97 – Both Directions – Future Planned

Highway 97, in both directions. Construction work planned between 15 Ave and 23 Ave for 0.6 km (Vernon). Starting Mon May 10 at 9:00 AM PDT until Wed May 12 at 3:00 PM PDT. Highway 97, in both directions. Construction work between 15th Ave and 25th Ave (Vernon, BC). Lane closures. Expect
Minor Delays. Last updated Fri May 7 at 8:05 AM PDT. (DBC-28924)

Posted on: May 7, 2021


Highway 1 – Both Directions – Current Planned

Highway 1, in both directions. Shoulder maintenance between West Kamloops and Copperhead Dr for 3.2 km (Kamloops). Until Fri May 7 at 4:00 PM PDT. Lane Closure. Road sweeping. Last updated Fri May 7 at 6:59 AM PDT. (DBC-28917)

Posted on: May 7, 2021


Highway 5 – Both Directions – Current Planned

Highway 5, in both directions. Road sweeping between Exit 336: Walloper and West Kamloops for 27.2 km (Kamloops to 14 km north of Surrey Lake Summit). Until Fri May 7 at 4:00 PM PDT. Shoulder maintenance. Lane Closure. Last updated Fri May 7 at 6:57 AM PDT. (DBC-28916)

Posted on: May 7, 2021


Highway 1 – Future Planned

Highway 1. Road construction work planned between Golden Donald Upper Rd and Yoho Bridge (3 km east of Golden). Starting Mon May 17 at 7:00 AM MDT until Fri May 21 at 12:00 PM MDT. The road will be closed. Extended closure, the road will be shut down from May 17 at 7:00 to May 21 at 12:00PM. Travelers must use detour route through HWY 95 and HWY 93S during this time. Next update time Fri May 21 at 12:00 PM MDT. Last updated Thu May 6 at 9:08 PM MDT. (DBC-28911)

Posted on: May 6, 2021


Highway 1 – Future Planned

[Truncated] Highway 1. Road construction work planned between Golden Donald Upper Rd and Yoho Bridge (4 km east of Golden). Starting Sat May 15 at 10:00 PM MDT until Mon May 17 at 7:00 AM MDT. From 10:00 PM to 7:00 AM MDT on weekends. The road will be closed. Full closure overnight, the road will be closed from 22:00 to 07:00 overnight on May 15 and May 16. Travelers must use detour route through HWY 95 and HWY 93S during this time. Next update time Mon May 17 at 7:00 AM MDT. Last updated Thu Ma

Posted on: May 6, 2021


Highway 1 – Future Planned

Highway 1. Road construction work planned between Golden Donald Upper Rd and Yoho Bridge for 3.7 km (3 to 7 km east of Golden). Starting Tue May 25 at 12:00 PM MDT until Fri May 28 at 12:00 PM MDT. The road will be closed. Extended closure, the road will be shut down from May 25 at 12:00PM to May 28 at 12:00PM. Travelers must use detour route through HWY 95 and HWY 93S during this time. Next update time Fri May 28 at 12:00 PM MDT. Last updated Thu May 6 at 9:19 PM MDT. (DBC-28912)

Posted on: May 6, 2021


Highway 1 – Future Planned

Highway 1. Road construction work planned between Golden Donald Upper Rd and Yoho Bridge (4 km east of Golden). Starting Sat May 15 until Sun May 16. From 9:00 AM to 3:00 PM MDT on weekends. Single lane alternating traffic will be in effect. Single lane alternating traffic from 09:00 to 15:00 on May 15 and May16. Next update time Sun May 16 at 3:00 PM MDT. Last updated Thu May 6 at 9:01 PM MDT. (DBC-28910)

Posted on: May 6, 2021


Other Roads – Both Directions – Incident

Kirkland Ranch Rd, in both directions. Roadway obstruction between 1km and Sundance rd. Single lane alternating traffic. 50% Load restrictions. No heavy traffic due to caving in culverts. Last updated Thu May 6 at 7:25 PM PDT. (DBC-28908)

Posted on: May 6, 2021


Highway 1 – Future Planned

Highway 1. Road maintenance work planned between Clanwilliam OH Bridge and Boulder Mtn Avalanche Gate for 2.8 km (9 to 6 km west of Revelstoke). Starting Mon May 10 until Fri May 14. From 7:00 AM to 4:00 PM PDT on weekdays. Eastbound lane will be closed. Expect minor delays. Traffic is still moving,
Caution narrow shoulder. Last updated Thu May 6 at 4:05 PM PDT. (DBC-28902)

Posted on: May 6, 2021