Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Road sweeping between Rutland Rd N and Crystal Waters Rd for 27.4 km (Kelowna to 11 km south of Coldstream). Until Thu May 19 at 9:00 PM PDT. From 9:00 PM to 1:30 AM PDT on Monday, Tuesday, Wednesday and Thursday. WATCH FOR SLOW MOVING VEHICLE AND FLAGGERS. Last updated Mon May 16 at 9:03 PM PDT. (DBC-41117)

Posted on: May 16, 2022


Highway 1 – Both Directions – Future Planned

Highway 1, in both directions. Pothole repair planned between Gill Ave and Cambie-Solsqua Rd for 11.4 km (Sicamous). Starting Tue May 17 at 8:00 AM PDT until Tue May 17 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Mon May 16 at 8:27 PM PDT. (DBC-41115)

Posted on: May 16, 2022


Highway 3 – Both Directions – Incident

Highway 3, in both directions. Vehicle fire between Old Richter Pass Rd and Vineyard Rd (5 km west of Osoyoos). Lane Closure. West bound slow lane closed. Next update time Tue May 17 at 3:00 PM PDT. Last updated Mon May 16 at 3:05 PM PDT. (DBC-41106)

Posted on: May 16, 2022


Highway 1 – Both Directions – Future Planned

Highway 1, in both directions. Paving operations planned at 1 Ave SW (Salmon Arm). Starting Tue May 17 at 5:30 AM PDT until Tue May 17 at 7:30 AM PDT. Single lane alternating traffic will be in effect. Last updated Mon May 16 at 1:40 PM PDT. (DBC-41101)

Posted on: May 16, 2022


Highway 6 EW – Both Directions – Future Planned

Highway 6 EW, in both directions. Road sweeping planned between Shafer Rd and Monashee Summit for 56.8 km (Monashee Summit to 11 km east of Lumby). Starting Tue May 17 until Thu May 19. From 6:00 AM to 3:00 PM PDT on Tuesday, Wednesday and Thursday. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Mon May 16 at 12:52 PM PDT. (DBC-41099)

Posted on: May 16, 2022


Highway 1 – Current Planned

Highway 1. Pothole repair between Gill Ave and Cambie-Solsqua Rd for 11.4 km (Sicamous). Until Mon May 16 at 4:00 PM PDT. Single lane alternating traffic. Last updated Mon May 16 at 11:46 AM PDT. (DBC-41093)

Posted on: May 16, 2022


Highway 6 EW – Current Planned

Highway 6 EW. Road sweeping between Hill Dr and Quesnel Rd for 10.8 km (Lumby to Coldstream). Until Mon May 16 at 2:00 PM PDT. Single lane alternating traffic. Last updated Mon May 16 at 10:38 AM PDT. (DBC-41088)

Posted on: May 16, 2022


Highway 1 – Westbound – Current Planned

Highway 1, westbound. Road sweeping between Abbey Rd and Tunkwa Lake Rd for 17.5 km (23 to 6 km west of Kamloops). Until Mon May 16 at 4:00 PM PDT. Machine sweeping shoulders and curbs. Last updated Mon May 16 at 7:41 AM PDT. (DBC-41066)

Posted on: May 16, 2022


Highway 5 – Southbound – Current Planned

Highway 5, southbound. Road sweeping between McLure Ferry Rd and Orchard Lake Rd for 3.2 km (16 km north of Kamloops to 15 km south of Barriere). Until Mon May 16 at 3:00 PM PDT. Lane Closure. Last updated Mon May 16 at 7:25 AM PDT. (DBC-41061)

Posted on: May 16, 2022


Highway 6 EW – Both Directions – Current Planned

Highway 6 EW, in both directions. Road sweeping between Rawlings Lake Rd and Sugar Lake Rd for 19.1 km (1 km west of Cherryville to 4 km east of Lumby). Until Mon May 16 at 4:00 PM PDT. Single lane alternating traffic. Expect minor delays. Last updated Mon May 16 at 7:05 AM PDT. (DBC-41060)

Posted on: May 16, 2022


Highway 97C – Road Condition

Highway 97C. Fog patches between Junction Hwy 97 and Pennask Summit for 33.0 km (West Kelowna to Pennask Summit). Last updated Mon May 16 at 7:05 AM PDT. (DBCRCON-129075)

Posted on: May 16, 2022


Highway 5 – Northbound – Current Planned

Highway 5, northbound. Road maintenance work between Exit 336: Walloper and Inks Lake Rd for 19.5 km (14 km north of Surrey Lake Summit to 1 km south of Kamloops). Until Mon May 16 at 4:00 PM PDT. SLOPE FLUME REPAIR. Last updated Mon May 16 at 7:30 AM PDT. (DBC-41063)

Posted on: May 16, 2022


Highway 1 – Current Planned

Highway 1. Bridge maintenance between Shuswap Ave and Little River Bridge for 8.6 km (Chase). Until Mon May 16 at 3:00 PM PDT. Single lane alternating traffic. Expect minor delays. Last updated Mon May 16 at 6:54 AM PDT. (DBC-41057)

Posted on: May 16, 2022


Highway 97C – Road Condition

Highway 97C. Limited visibility with fog between Trepanier Rd and Pennask Summit for 10.1 km (Pennask Summit). Last updated Sun May 15 at 8:22 AM PDT. (DBCRCON-129073)

Posted on: May 15, 2022


Highway 97C – Road Condition

Highway 97C. Fog patches between Junction Hwy 97 and Brenda Mine Rd for 22.9 km (West Kelowna to 10 km east of Pennask Summit). Last updated Sun May 15 at 6:32 AM PDT. (DBCRCON-129072)

Posted on: May 15, 2022


Highway 97 – Future Planned

Highway 97. Bridge maintenance planned between Old Vernon Rd and Crystal Waters Rd for 21.6 km (Kelowna to 11 km south of Coldstream). Starting Sat May 14 at 7:00 PM PDT until Sun May 15 at 1:00 AM PDT. Road will be open to traffic. Watch for slow moving traffic. Last updated Sat May 14 at 5:14 PM PDT. (DBC-41041)

Posted on: May 14, 2022


Highway 97C – Road Condition

Highway 97C. Fog patches between Junction Hwy 97 and Pennask Summit for 33.0 km (West Kelowna to Pennask Summit). Last updated Sat May 14 at 9:01 AM PDT. (DBCRCON-129069)

Posted on: May 14, 2022


Highway 97 – Both Directions – Incident

Highway 97, in both directions. There is a multi-vehicle incident between W Warren Ave and Fairview Rd for 0.8 km (Penticton). Single lane alternating traffic. Watch for traffic control. Last updated Fri May 13 at 9:58 PM PDT. (DBC-41035)

Posted on: May 13, 2022


Highway 97 – Both Directions – Future Planned

Highway 97, in both directions. Maintenance planned between Okanagan Lake Provincial Pk and William R Bennett Bridge for 33.5 km (Kelowna to 5 km north of Summerland). Starting Fri May 13 at 8:00 PM PDT until Sat May 14 at 3:00 AM PDT. Railing and barrier washing. Watch for slow moving vehicles. Last updated Fri May 13 at 7:35 PM PDT. (DBC-41033)

Posted on: May 13, 2022


Highway 1 – Both Directions – Future Planned

Highway 1, in both directions. Road construction work planned between 1 Ave SW and 10 Ave SW for 0.7 km (Salmon Arm). Starting Sat May 14 at 10:00 AM PDT until Sat May 14 at 7:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Expect delays. Last updated Fri May 13 at 2:10 PM PDT. (DBC-41030)

Posted on: May 13, 2022


Highway 6 EW – Westbound – Future Planned

Highway 6 EW, westbound. Utility work planned at Aberdeen Rd (Coldstream). Starting Tue May 17 at 9:00 AM PDT until Tue May 17 at 3:00 PM PDT. Lane Closure. Last updated Fri May 13 at 11:50 AM PDT. (DBC-41020)

Posted on: May 13, 2022


Highway 97 – Future Planned

Highway 97. Bridge maintenance planned between Skaha Lake Rd and Sage Mesa Dr for 7.9 km (Penticton). Starting Mon May 16 at 9:00 AM PDT until Mon May 16 at 3:00 PM PDT. Lane Closure. Last updated Fri May 13 at 11:39 AM PDT. (DBC-41018)

Posted on: May 13, 2022


Highway 97 – Both Directions – Future Planned

Highway 97, in both directions. Night time construction work planned between 31 Ave and 33 Ave for 0.2 km (Vernon). Starting Mon May 16 at 9:00 PM PDT until Fri May 20 at 6:00 AM PDT. Roadway will be reduced to two lanes. Possible delays. Last updated Fri May 13 at 12:20 PM PDT. (DBC-41024)

Posted on: May 13, 2022


Highway 97 – Future Planned

Highway 97. Bridge maintenance planned between Green Lake Rd and Johnson St for 29.1 km (Okanagan Falls to Summerland). Starting Tue May 17 at 9:00 AM PDT until Tue May 17 at 3:00 PM PDT. Lane Closure. Last updated Fri May 13 at 11:50 AM PDT. (DBC-41021)

Posted on: May 13, 2022


Highway 97C – Road Condition

Highway 97C. Watch for slippery sections between Trepanier Rd and Pennask Summit for 10.1 km (Pennask Summit). Last updated Fri May 13 at 6:29 AM PDT. (DBCRCON-129062)

Posted on: May 13, 2022


Highway 3 – Road Condition

Highway 3. Watch for slippery sections between 89th St and Wagon Wheel Rd for 23.2 km (Osoyoos). Last updated Fri May 13 at 6:29 AM PDT. (DBCRCON-129061)

Posted on: May 13, 2022


Highway 97 – Both Directions – Incident

Highway 97, in both directions. The traffic signal is out between Daimler Dr and Ross Rd for 0.1 km (West Kelowna). Traffic signal out. Traffic lights flashing red. Please use 4-way stop procedure. Maintenance crew on their way. Last updated Thu May 12 at 11:40 PM PDT. (DBC-41003)

Posted on: May 12, 2022


Highway 97 – Northbound – Future Planned

Highway 97, northbound. Road sweeping planned between Penno Rd and Crystal Waters Rd for 27.2 km (Kelowna to 11 km south of Coldstream). Starting Thu May 12 at 7:00 PM PDT until Fri May 13 at 2:00 AM PDT. Watch for slow moving vehicles. Last updated Thu May 12 at 4:58 PM PDT. (DBC-40994)

Posted on: May 12, 2022


Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Maintenance between Salmon River Rd and Chase-Falkland Rd for 15.8 km (Falkland). Until Thu May 12 at 4:00 PM PDT. Single lane alternating traffic. Expect minor delays. Guard rail cleaning. Last updated Thu May 12 at 7:46 AM PDT. (DBC-40959)

Posted on: May 12, 2022


Highway 97A – Both Directions – Current Planned

Highway 97A, in both directions. Bridge maintenance between the start of Highway 97A and Pleasant Valley Rd for 7.6 km (18 to 26 km south of Enderby). Until Thu May 12 at 3:00 PM PDT. Lane Closure. Bridge washing. Last updated Thu May 12 at 7:35 AM PDT. (DBC-40958)

Posted on: May 12, 2022


Highway 5 – Southbound – Current Planned

Highway 5, southbound. Maintenance between Inks Lake Rd and Exit 336: Walloper for 19.5 km (14 km north of Surrey Lake Summit to 1 km south of Kamloops). Until Thu May 12 at 4:30 PM PDT. Lane Closure. Last updated Thu May 12 at 7:13 AM PDT. (DBC-40955)

Posted on: May 12, 2022


Highway 1 – Both Directions – Current Planned

Highway 1, in both directions. Road sweeping between Savona Access Rd and Abbey Rd for 24.3 km (6 to 30 km west of Kamloops). Watch for slow moving vehicle. Last updated Thu May 12 at 7:26 AM PDT. (DBC-40957)

Posted on: May 12, 2022


Highway 1 – Both Directions – Current Planned

Highway 1, in both directions. Pothole repair between Gill Ave and Cambie-Solsqua Rd for 11.4 km (Sicamous). Until Thu May 12 at 4:00 PM PDT. Single lane alternating traffic. Last updated Thu May 12 at 6:51 AM PDT. (DBC-40954)

Posted on: May 12, 2022


Highway 97 – Current Planned

Highway 97. Maintenance between Chase-Falkland Rd and Duck Range Rd for 39.8 km (Falkland to 5 km east of Monte Creek). Until Sun May 15 at 4:00 PM PDT. From 7:00 AM to 4:00 PM PDT on weekends and Friday. Expect minor delays. Single lane alternating traffic. Cleaning guard rails. Last updated Thu May 12 at 7:49 AM PDT. (DBC-40961)

Posted on: May 12, 2022


Highway 12 – Future Planned

Highway 12. Utility work planned between Two Mile Rd and Six Mile Rd for 6.0 km (2 to 8 km north of Lytton). Starting Thu May 19 at 6:00 AM PDT until Thu May 19 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Thu May 12 at 7:16 AM PDT. (DBC-40956)

Posted on: May 12, 2022


Highway 97 – Both Directions – Future Planned

Highway 97, in both directions. Shoulder maintenance planned between Hardy St and Renfrew Rd (Peachland). Starting Thu May 12 at 7:00 AM PDT until Thu May 12 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Expect minor delays. Watch for danger trees. Last updated Thu May 12 at 6:41 AM PDT. (DBC-40951)

Posted on: May 12, 2022


Highway 97A – Current Planned

Highway 97A. Bridge maintenance between Powerhouse Rd and McLeod Rd for 0.6 km (11 km south of Enderby). Until Wed May 11 at 2:30 PM PDT. Single lane alternating traffic. Last updated Wed May 11 at 12:16 PM PDT. (DBC-40927)

Posted on: May 11, 2022


Highway 1 – Current Planned

Highway 1. Bridge maintenance between Yard Creek Loop Rd and Malakwa Loop Rd for 3.8 km (14 to 11 km east of Sicamous). Until Wed May 11 at 2:00 PM PDT. Lane Closure. Bridge washing, eastbound and westbound. Watch for crews on road, and obey all signs. Last updated Wed May 11 at 7:36 AM PDT. (DBC-40901)

Posted on: May 11, 2022


Highway 1 – Future Planned

Highway 1. Geotechnical investigation planned between Main St and Nicoamen River Rd for 15.2 km (Lytton). Starting Fri May 13 at 7:00 AM PDT until Fri May 20 at 12:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Wed May 11 at 7:45 AM PDT. (DBC-40904)

Posted on: May 11, 2022


Highway 5 – Southbound – Current Planned

Highway 5, southbound. Road maintenance work between Inks Lake Rd and Exit 336: Walloper for 19.5 km (14 km north of Surrey Lake Summit to 1 km south of Kamloops). Until Wed May 11 at 4:30 PM PDT. Lane Closure. Flume fixing in right hand shoulder. Last updated Wed May 11 at 7:09 AM PDT. (DBC-40896)

Posted on: May 11, 2022


Highway 1 – Future Planned

Highway 1. Geotechnical investigation planned between Main St and Nicoamen River Rd for 15.2 km (Lytton). Starting Tue May 24 at 7:00 AM PDT until Fri May 27 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Wed May 11 at 7:47 AM PDT. (DBC-40905)

Posted on: May 11, 2022


Highway 1 – Both Directions – Current Planned

Highway 1, in both directions. Road maintenance work between Abbey Rd and Pacific Way for 9.0 km (Kamloops). Until Wed May 11 at 4:00 PM PDT. Machine sweeping curbs and shoulders. Slow vehicles for 8 km. Last updated Wed May 11 at 7:17 AM PDT. (DBC-40899)

Posted on: May 11, 2022


Highway 6 EW – Both Directions – Future Planned

Highway 6 EW, in both directions. Utility work planned at Aberdeen Rd (Coldstream). Starting Wed May 11 at 9:00 AM PDT until Wed May 11 at 3:00 PM PDT. Lane closures in both directions planned. Last updated Tue May 10 at 2:33 PM PDT. (DBC-40872)

Posted on: May 10, 2022


Highway 97 – Southbound – Future Planned

Highway 97, southbound. Utility work planned at 48 Ave (Vernon). Starting Wed May 11 at 9:00 AM PDT until Wed May 11 at 3:00 PM PDT. Lane Closure. Last updated Tue May 10 at 2:35 PM PDT. (DBC-40873)

Posted on: May 10, 2022


Highway 97 – Northbound – Future Planned

Highway 97, northbound. Utility work planned between Leckie Rd and Banks Rd for 0.3 km (Kelowna). Starting Wed May 11 at 9:00 PM PDT until Thu May 12 at 6:00 AM PDT. Expect delays. Watch for traffic control personnel. Crews working in the right and middle lane. Last updated Tue May 10 at 2:01 PM PDT. (DBC-40867)

Posted on: May 10, 2022


Highway 97A – Future Planned

Highway 97A. Utility work planned at Knight Ave (Enderby). Starting Wed May 11 at 9:00 AM PDT until Wed May 11 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Tue May 10 at 2:38 PM PDT. (DBC-40874)

Posted on: May 10, 2022


Highway 97 – Southbound – Future Planned

Highway 97, southbound. Utility work planned between Pollard Rd and Beaver Lake Rd for 0.4 km (1 to 2 km north of Kelowna). Starting Thu May 12 at 9:00 PM PDT until Fri May 13 at 6:00 AM PDT. Expect delays. Watch for traffic control personnel. Crews will be working in the right and middle lane. Last updated Tue May 10 at 2:05 PM PDT. (DBC-40868)

Posted on: May 10, 2022


Highway 5 – Northbound – Current Planned

Highway 5, northbound. Maintenance at Puett Ranch Rd (Kamloops). Lane Closure. Right lane closed. Last updated Tue May 10 at 11:54 AM PDT. (DBC-40860)

Posted on: May 10, 2022


Highway 1 – Current Planned

Highway 1. Road sweeping between Abbey Rd and Pacific Way for 7.9 km (Kamloops). Until Tue May 10 at 4:00 PM PDT. Shoulder maintenance. Machine sweeping, right shoulders, curbs and guard rails. Eastbound and westbound. Slow vehicles for 8 km. Last updated Tue May 10 at 7:59 AM PDT. (DBC-40845)

Posted on: May 10, 2022


Highway 6 EW – Road Condition

Highway 6 EW. Slushy with slippery sections between North Fork Rd and Monashee Summit for 42.1 km (Cherryville to Monashee Summit). Last updated Tue May 10 at 6:41 AM PDT. (DBCRCON-129030)

Posted on: May 10, 2022