%%tb-image-alt-text%%
Kamloops.me

Me and my Kamloops

Highway 1 – Eastbound – Incident

Highway 1, eastbound. Vehicle fire between Willow Rd and Old Hwy (12 km west of Chase). Lane Closure. Next update time Tue Jun 8 at 8:00 PM PDT. Last updated Tue Jun 8 at 6:22 PM PDT. (DBC-30244)

Posted on: June 8, 2021


Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Road maintenance work between Edwards Rd and Crystal Waters Rd for 26.9 km (11 km south of Coldstream to Kelowna). Until Thu Jun 24. From 5:00 PM to 1:00 AM PDT on Sunday, Monday, Tuesday, Wednesday and Thursday. Watch for traffic control. Drainage and Catch basin cleaning. Please slow down for slow moving equipment and flaggers. Last updated Tue Jun 8 at 5:16 PM PDT. (DBC-30242)

Posted on: June 8, 2021


Highway 97 – Northbound – Future Planned

Highway 97, northbound. Utility work planned at Lakeshore Dr S (Summerland). Starting Thu Jun 10 at 9:00 AM PDT until Thu Jun 10 at 3:00 PM PDT. Repair damaged street light.
Please use caution when travelling in noted area. Last updated Tue Jun 8 at 2:19 PM PDT. (DBC-30226)

Posted on: June 8, 2021


Highway 97B – Southbound – Future Planned

Highway 97B, southbound. Maintenance planned between Mayfair Rd and Hudson Rd for 0.3 km (1 km south of Salmon Arm). Starting Fri Jun 11 at 10:00 AM PDT until Fri Jun 11 at 12:00 PM PDT. Splicing/Aerial Crossing at 5939 Grindrod-Salmon Arm Highway, Salmon Arm (97B). TCPs to perform centreline crossover for approx.1 hour, & traffic all-stop for approx.1 minute. Speed reduction to 60km/h. Last updated Tue Jun 8 at 2:48 PM PDT. (DBC-30231)

Posted on: June 8, 2021


Highway 97B – Southbound – Future Planned

Highway 97B, southbound. Maintenance planned between Hudson Rd and Sonora Rd for 0.8 km (1 to 2 km south of Salmon Arm). Starting Fri Jun 11 at 8:00 AM PDT until Fri Jun 11 at 12:00 PM PDT. Aerial Crossing at 6828 Grindrod-Salmon Arm Highway, Salmon Arm (97B). TCPs to perform traffic all-stop for approx.1 minute. Speed reduction to 60km/h. Last updated Tue Jun 8 at 2:36 PM PDT. (DBC-30228)

Posted on: June 8, 2021


Highway 97 – Both Directions – Future Planned

Highway 97, in both directions. Maintenance planned between Nettle Rd and Park Rill for 1.4 km (3 to 1 km north of Oliver). Starting Fri Jun 11 at 7:00 AM PDT until Sat Jun 12 at 5:00 PM PDT. Gas main installation to serve a property at 7127 Hwy 97, Oliver. Working on the shoulder of the road and also boring under the roadway. Single lane alternating traffic with a speed reduction to 50km. Last updated Tue Jun 8 at 8:35 AM PDT. (DBC-30211)

Posted on: June 8, 2021


Highway 5A – Both Directions – Future Planned

Highway 5A, in both directions. Road sweeping planned between Campbell Creek Rd and Rose Hill Rd for 10.0 km (Kamloops to 10 km south of Kamloops). Starting Tue Jun 8 at 7:30 AM PDT until Tue Jun 8 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Tue Jun 8 at 6:54 AM PDT. (DBC-30197)

Posted on: June 8, 2021


Highway 5 – Northbound – Current Planned

Highway 5, northbound. Road sweeping between Exit 290: Merritt and Exit 336: Walloper for 36.8 km (14 km north of Surrey Lake Summit to 7 km north of Merritt). Until Tue Jun 8 at 3:00 PM PDT. Please watch for slow moving vehicles. Last updated Tue Jun 8 at 6:06 AM PDT. (DBC-30191)

Posted on: June 8, 2021


Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Mowing between Gellatly Rd and William R Bennett Bridge for 10.6 km (West Kelowna to 1 km south of Kelowna). Until Fri Jun 11. From 7:00 PM to 1:00 AM PDT on weekdays. Watch for traffic control. Watch for slow moving vehicle and flaggers. Last updated Mon Jun 7 at 5:32 PM PDT. (DBC-30185)

Posted on: June 7, 2021


Highway 1 – Eastbound – Future Planned

Highway 1, eastbound. Road maintenance work planned between Coburn St and Shuswap Ave (Chase). Starting Thu Jun 10 at 8:30 AM PDT until Mon Jun 28 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Highway 1 – Detour Construction and Pipe installation
– Excavation and Paving work
– Storm Main installation. Last updated Mon Jun 7 at 3:26 PM PDT. (DBC-30180)

Posted on: June 7, 2021


Highway 97A – Both Directions – Incident

Highway 97A, in both directions. Vehicle incident between Wagner Rd and Powerhouse Rd (11 km south of Enderby). Assessment in progress. Lane Closure. Expect delays. Next update time Mon Jun 7 at 4:00 PM PDT. Last updated Mon Jun 7 at 2:00 PM PDT. (DBC-30175)

Posted on: June 7, 2021


Other Roads – Both Directions – Future Planned

Dunn Lake Road, in both directions. Geotechnical investigation planned at Boulder Creek Bridge 34 km north of Barriere. Starting Tue Jun 8 at 8:00 AM PDT until Tue Jun 8 at 6:00 PM PDT. Road closure planned. Estimated time of re-opening Tue Jun 8 at 6:00 PM PDT. Last updated Mon Jun 7 at 12:37 PM PDT. (DBC-30171)

Posted on: June 7, 2021


Highway 97A – Southbound – Current Planned

Highway 97A, southbound. Paving operations between Emeny Rd and Salts Rd for 0.8 km (5 km north of Enderby). Until Tue Jun 8 at 5:00 PM PDT. OH Electrical work for BC Hydro. Last updated Mon Jun 7 at 8:54 AM PDT. (DBC-30160)

Posted on: June 7, 2021


Highway 97 – Southbound – Current Planned

Highway 97, southbound. Paving operations between 13th Ave and Alba Rd for 1.0 km (Okanagan Falls). Until Fri Jun 11. Single lane alternating traffic. Paving Weyerhaeuser Rd and tieing into hwy 97 in Okanagan Falls. Single lane alternating traffic on hwy 97 and on the Weyerhaeuser Rd. Last updated Mon Jun 7 at 8:07 AM PDT. (DBC-30154)

Posted on: June 7, 2021


Highway 5A – Both Directions – Future Planned

Highway 5A, in both directions. Road sweeping planned between Campbell Creek Rd and Separation Rd for 3.5 km (7 to 10 km south of Kamloops). Starting Mon Jun 7 at 7:30 AM PDT until Mon Jun 7 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Mon Jun 7 at 7:18 AM PDT. (DBC-30149)

Posted on: June 7, 2021


Highway 6 EW – Both Directions – Current Planned

Highway 6 EW, in both directions. Road sweeping between Aberdeen Rd and Shuswap Ave for 21.5 km (Coldstream to Lumby). Until Tue Jun 8. From 7:00 AM to 3:30 PM PDT on Monday and Tuesday. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Last updated Mon Jun 7 at 6:20 AM PDT. (DBC-30145)

Posted on: June 7, 2021


Highway 1 – Both Directions – Current Planned

Highway 1, in both directions. Maintenance between Pierres Point Rd and Gill Ave for 38.5 km (Sicamous to Salmon Arm). Until Mon Jun 7 at 6:00 AM PDT. Single lane alternating traffic. Watch for traffic control. Last updated Mon Jun 7 at 3:08 AM PDT. (DBC-30141)

Posted on: June 7, 2021


Highway 1 – Both Directions – Incident

Highway 1, in both directions. Vehicle fire between Arnouse Lane and Little River Bridge (9 km east of Chase). Assessment in progress. Road closed. Emergency vehicles on scene. Watch for traffic control. Next update time Mon Jun 7 at 4:15 AM PDT. Last updated Mon Jun 7 at 3:38 AM PDT. (DBC-30142)

Posted on: June 7, 2021


Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Maintenance between Jones Flat Rd and Princeton Ave for 20.1 km (Peachland to Summerland). Until Thu Jun 10. From 9:00 PM to 6:00 AM PDT on Sunday, Monday, Tuesday and Wednesday. Watch for traffic control. Last updated Sun Jun 6 at 10:54 PM PDT. (DBC-30139)

Posted on: June 6, 2021


Highway 8 – Both Directions – Incident

Highway 8, in both directions. Police incident between Aberdeen Rd and the end of Highway 8 (3 km west of Merritt). Road closed. Assessment in progress. Detour in effect. Hwy 8 is Closed between the Hwy 97C junction and Mamit Lake Ranch Rd. Detour available to passenger vehicles only. Next update time Sun Jun 6 at 10:00 PM PDT. Last updated Sun Jun 6 at 8:38 PM PDT. (DBC-30137)

Posted on: June 6, 2021


Highway 97 – Westbound – Current Planned

Highway 97, westbound. Special event between Hanna Rd and Duck Range Rd for 2.4 km (8 to 5 km east of Monte Creek). Expect Major delays due to congestion. Brake check traffic backed up due to truck rally. Last updated Sat Jun 5 at 11:09 AM PDT. (DBC-30125)

Posted on: June 5, 2021


Highway 5 – Incident

Highway 5. Travel advisory planned between Highway 1 and Halston/ Mt. Paul Road. Starting Sat Jun 5 at 10:00 AM PDT until Sat Jun 5 at 3:00 PM PDT. Motorists are advised to expect high vehicle volumes and delays around Hwy 5N and Hwy 1 Valleyview Interchange (Exit 374) to Halston/ Mt. Paul road due to planned Solidarity Convoys. Next update time Sat Jun 5 at 3:00 PM PDT. Last updated Fri Jun 4 at 4:00 PM PDT. (DBC-30112)

Posted on: June 4, 2021


Highway 1 – Incident

Highway 1. Travel advisory planned between Peterson Creek Bridge and Comazzetto Road. Starting Sat Jun 5 at 10:00 AM PDT until Sat Jun 5 at 3:00 PM PDT. Motorists are advised to expect high vehicle volumes and delays around Hwy 5N and Hwy 1 Valleyview Interchange (Exit 374) to Halston/ Mt. Paul road due to planned Solidarity Convoys. Next update time Sat Jun 5 at 3:00 PM PDT. Last updated Fri Jun 4 at 4:04 PM PDT. (DBC-30113)

Posted on: June 4, 2021


Highway 33 – Both Directions – Future Planned

Highway 33, in both directions. Bridge maintenance planned between Three Forks Rd and Philpott Rd for 2.7 km (11 to 14 km south of Kelowna). Starting Tue Jun 8 at 9:00 AM PDT until Tue Jun 8 at 2:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Fri Jun 4 at 1:24 PM PDT. (DBC-30108)

Posted on: June 4, 2021


Highway 97C – Both Directions – Future Planned

Highway 97C, in both directions. Bridge maintenance planned between Junction Hwy 97 and Trepanier Rd for 6.6 km (3 km west of Peachland to West Kelowna). Starting Mon Jun 7 at 9:00 AM PDT until Mon Jun 7 at 2:00 PM PDT. Right lane will be closed. Last updated Fri Jun 4 at 1:31 PM PDT. (DBC-30109)

Posted on: June 4, 2021


Highway 5A – Future Planned

Highway 5A. Utility work planned between Junction Hwy 97C and Monck Park Rd for 0.5 km (Merritt). Starting Mon Jun 7 at 9:00 AM PDT until Fri Jun 18 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Possible delays. Hwy 5A between Joeyaska Rd and Sterling Rd. Last updated Fri Jun 4 at 11:20 AM PDT. (DBC-30105)

Posted on: June 4, 2021


Highway 97B – Northbound – Future Planned

Highway 97B, northbound. Utility work planned between 14 Ave SE and 10 Ave SE for 0.3 km (Salmon Arm). Starting Mon Jun 7 at 8:00 AM PDT until Fri Jun 11 at 5:00 PM PDT. Cable Placement at 620 Grindrod-Salmon Arm Highway, Salmon Arm. TCPs to perform SLAT with speed drop to 50km/h. Last updated Fri Jun 4 at 8:05 AM PDT. (DBC-30089)

Posted on: June 4, 2021


Highway 97B – Northbound – Future Planned

Highway 97B, northbound. Utility work planned between 14 Ave SE and 10 Ave NE for 2.0 km (Salmon Arm). Starting Mon Jun 7 at 8:00 AM PDT until Fri Jun 11 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Cable Placement at 620 Grindrod-Salmon Arm Highway, Salmon Arm. TCPs to perform SLAT with speed drop to 50km/h. Last updated Fri Jun 4 at 8:11 AM PDT. (DBC-30091)

Posted on: June 4, 2021


McLure Ferry – Incident

McLure Ferry. Ferry is currently out of service between McLure Ferry and the end of McLure Ferry (McLure). Road closed. Due to high water. Next update time Sun Jun 6 at 8:00 AM PDT. Last updated Fri Jun 4 at 6:48 AM PDT. (DBC-30081)

Posted on: June 4, 2021


Other Roads – Both Directions – Future Planned

Silver Star Road, in both directions. Shoulder maintenance planned between Pleasant Valley Road and Cathedral Drive in Vernon. Starting Sun Jun 6 until Fri Jul 30. From 7:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Fri Jun 4 at 6:35 AM PDT. (DBC-30080)

Posted on: June 4, 2021


Highway 97 – Northbound – Incident

Highway 97, northbound. Collision between Stickle Rd and Meadowlark Rd for 2.0 km (2 to 4 km north of Vernon). Until Thu Jun 3. Assessment in progress. Northbound lane closure. Next update time Thu Jun 3 at 6:00 PM PDT. Last updated Thu Jun 3 at 5:03 PM PDT. (DBC-30068)

Posted on: June 3, 2021


Little Fort Ferry – Both Directions – Incident

Little Fort Ferry, in both directions. Ferry is currently out of service at Little Fort Ferry (1 km west of Little Fort). CLOSED DUE TO HIGH WATER. Next update time Sun Jun 6 at 8:00 AM PDT. Last updated Thu Jun 3 at 12:20 PM PDT. (DBC-30048)

Posted on: June 3, 2021


Highway 97 – Both Directions – Incident

Highway 97, in both directions. Structural fire between Grandview Flats Rd N and Tonasket Rd (17 km north of Vernon). Road closed. Assessment in progress. Emergency vehicles on scene. Detour not available. Next update time Thu Jun 3 at 12:00 PM PDT. Last updated Thu Jun 3 at 10:44 AM PDT. (DBC-30039)

Posted on: June 3, 2021


Highway 5 – Northbound – Current Planned

Highway 5, northbound. Maintenance between Exit 336: Walloper and Inks Lake Rd for 19.5 km (14 km north of Surrey Lake Summit to 1 km south of Kamloops). Until Thu Jun 3 at 4:00 PM PDT. Lane Closure. Last updated Thu Jun 3 at 7:59 AM PDT. (DBC-30027)

Posted on: June 3, 2021


Highway 1 – Eastbound – Current Planned

Highway 1, eastbound. Maintenance between Deadman-Vidette Rd and Sabiston Creek Rd for 3.7 km (29 to 33 km east of Cache Creek). Until Thu Jun 3 at 2:00 PM PDT. Lane Closure. Last updated Thu Jun 3 at 7:53 AM PDT. (DBC-30025)

Posted on: June 3, 2021


Highway 5A – Southbound – Current Planned

Highway 5A, southbound. Maintenance between Separation Rd and Campbell Creek Rd for 3.5 km (10 to 7 km south of Kamloops). Until Thu Jun 3 at 2:00 PM PDT. Single lane alternating traffic. Last updated Thu Jun 3 at 7:55 AM PDT. (DBC-30026)

Posted on: June 3, 2021


Highway 1 – Westbound – Future Planned

Highway 1, westbound. Road sweeping planned between 2nd Nations Rd and Sandy Point Rd for 3.1 km (Salmon Arm). Starting Mon Jun 7 at 4:00 AM PDT until Mon Jun 7 at 7:00 AM PDT. Watch for traffic control personnel. Barrier sweeping ongoing. Watch for diminishing lanes, or lane closures. Slow down when you see amber flashing lights. Last updated Wed Jun 2 at 10:53 AM PDT. (DBC-29980)

Posted on: June 2, 2021


Highway 6 EW – Eastbound – Future Planned

Highway 6 EW, eastbound. Road sweeping planned between Aberdeen Rd and Mountain View Ave for 20.3 km (Coldstream to Lumby). Starting Thu Jun 3 at 7:00 AM PDT until Thu Jun 3 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Expect delays. Watch for traffic control personnel. Barrier sweeping crew. Watch for shadow vehicles & slow moving equipment. Delays up to 15 minutes. Slow down when you see amber flashing lights. Last updated Wed Jun 2 at 11:04 AM PDT. (DBC-29981)

Posted on: June 2, 2021


Highway 5A – Southbound – Future Planned

Highway 5A, southbound. Utility work planned between Campbell Creek Rd and Roche Lake Rd for 7.0 km (17 to 10 km south of Kamloops). Starting Mon Jun 7 until Fri Jun 11. From 8:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Wed Jun 2 at 10:48 AM PDT. (DBC-29979)

Posted on: June 2, 2021


Highway 5 – Northbound – Current Planned

Highway 5, northbound. Maintenance between Exit 336: Walloper and Inks Lake Rd for 19.5 km (1 km south of Kamloops to 14 km north of Surrey Lake Summit). Until Wed Jun 2 at 4:00 PM PDT. Lane Closure. Last updated Wed Jun 2 at 7:42 AM PDT. (DBC-29962)

Posted on: June 2, 2021


Highway 97 – Northbound – Incident

Highway 97, northbound. Vehicle incident between Crystal Waters Rd and Crystal Waters Rd for 0.9 km (11 km south of Coldstream). Assessment in progress. Next update time Wed Jun 2 at 9:00 AM PDT. Last updated Wed Jun 2 at 7:50 AM PDT. (DBC-29963)

Posted on: June 2, 2021


Highway 97A – Southbound – Future Planned

Highway 97A, southbound. Pavement patching is planned. Between Smith Dr and Greenhow Rd for 12.2 km (25 to 12 km south of Enderby). Starting Wed Jun 2 at 7:00 AM PDT until Wed Jun 2 at 3:00 PM PDT. Watch for traffic control personnel. Watch for lane closures. Slow down when you see amber flashing lights. Last updated Wed Jun 2 at 6:33 AM PDT. (DBC-29955)

Posted on: June 2, 2021


Highway 5A – Incident

Highway 5A. Vehicle incident at Roche Lake Rd (17 km south of Kamloops). Single lane alternating traffic. Vehicle incident 5 kms South of Roche Lake Road. Last updated Tue Jun 1 at 10:43 PM PDT. (DBC-29950)

Posted on: June 1, 2021


Highway 97A – Southbound – Future Planned

Highway 97A, southbound. Paving operations planned between Russell Ave and Granville Ave for 0.2 km (Enderby). Starting Fri Jun 4 at 7:00 AM PDT until Fri Jun 4 at 5:00 PM PDT. Vernon Paving to pave Hubert Ave. Last updated Tue Jun 1 at 2:15 PM PDT. (DBC-29932)

Posted on: June 1, 2021


Highway 5 – Northbound – Current Planned

Highway 5, northbound. Road sweeping between Exit 228: Coquihalla Lakes Rd and Exit 250: Larson Hill for 21.6 km (31 to 9 km north of Coquihalla Summit). Until Tue Jun 1 at 4:00 PM PDT. Right lane closed. Please watch for slow moving vehicles. Last updated Tue Jun 1 at 9:10 AM PDT. (DBC-29914)

Posted on: June 1, 2021


Highway 1 – Current Planned

Highway 1. Pavement patching underway at Nina Pl (Kamloops). Until Tue Jun 1 at 4:00 PM PDT. Eastbound lane closure. Last updated Tue Jun 1 at 7:38 AM PDT. (DBC-29898)

Posted on: June 1, 2021


Highway 97 – Westbound – Future Planned

Highway 97, westbound. Utility work planned between Pinaus Lake Rd and Bulman Rd for 1.3 km (15 to 13 km west of Falkland). Starting Wed Jun 2 at 9:30 AM PDT until Thu Jun 10 at 3:00 PM PDT. Utility Works, conductor crossing on Hwy 97 at 1.55 km East of Meadowview Farm 6591 BC-97 (GPS coordinates: 50.469052, -119.657785). Intermittent Traffic Control will be implemented. Last updated Mon May 31 at 11:32 AM PDT. (DBC-29862)

Posted on: May 31, 2021


Highway 1 – Northbound – Future Planned

Highway 1, northbound. Blasting planned between Cisco Siding Rd and George Rd for 5.2 km (7 to 2 km south of Lytton). Starting Tue Jun 8 at 12:00 PM PDT until Tue Jun 8 at 2:00 PM PDT. Lane Closure. Expect delays. Last updated Mon May 31 at 9:42 AM PDT. (DBC-29858)

Posted on: May 31, 2021


Highway 6 EW – Both Directions – Future Planned

Highway 6 EW, in both directions. Utility work planned between Rawlings Lake Rd and Montgomery Rd for 5.1 km (9 to 4 km east of Lumby). Starting Wed Jun 2 at 9:00 AM PDT until Mon Jun 7 at 3:00 PM PDT. For the purpose of constructing the following works: telus conduit via trenching along shoulder of Hwy 6 @ Gibsons speed reduction requested to 60 km/h, SLAT only if necessary. Last updated Mon May 31 at 8:51 AM PDT. (DBC-29853)

Posted on: May 31, 2021


Highway 5 – Current Planned

Highway 5. Road sweeping between Exit 202 and Exit 228: Coquihalla Lakes Rd for 26.6 km (11 km south of Great Bear Snowshed to 9 km north of Coquihalla Summit). Until Mon May 31 at 4:00 PM PDT. Watch for slow moving vehicles between Box Canyon Chain up to the Pool Plaza. Last updated Mon May 31 at 8:16 AM PDT. (DBC-29847)

Posted on: May 31, 2021