%%tb-image-alt-text%%
Kamloops.me

Me and my Kamloops

Highway 5 – Both Directions – Current Planned

Highway 5, in both directions. Construction work between Exit 202 and Exit 217: Zopkios Brake Check for 3.1 km (3 km north of Great Bear Snowshed to Great Bear Snowshed). Until Thu May 13 at 4:00 PM PDT. Lane closures in both directions in effect. Watch for traffic control. Last updated Thu May 13 at 7:23 AM PDT. (DBC-29179)