Kootenays
Needles Ferry – Westbound – Incident

Needles Ferry, westbound. 2 sailing wait between the end of Needles Ferry and Needles Ferry for 0.1 km (Needles). Possible ferry delays. 2 sailing wait from the Fauquier side. Next update time Mon Sep 2 at 2:30 PM PDT. Last updated Mon Sep 2 at 1:05 PM PDT. (DBC-67799)

Posted on: September 2, 2024


Kootenays
Highway 93 – Both Directions – Future Planned

Highway 93, in both directions. Construction work planned between Settlers Rd and Kootenay Crossing Warden Station (20 km north of Radium Hot Springs). Starting Tue Sep 3 until Thu Sep 5. Expect construction zone reduced speed limits and some delays during daylight hours. Last updated Sun Sep 1 at 11:25 PM MDT. (DBC-67792)

Posted on: September 1, 2024


Kootenays
Highway 3 – Both Directions – Current Planned

Highway 3 (Crowsnest Highway), in both directions. Paving operations between Jim Smith Lake Rd and Ft. Steele Overhead Bridge for 5.8 km (Cranbrook). Until Sun Sep 29. Lane Closure. Watch for traffic control. Expect delays. Single lane traffic with 10 minute delay. Last updated Thu Aug 15 at 1:59 PM MDT. (DBC-67226)

Posted on: August 21, 2024


Kootenays
Highway 31A – Eastbound – Current Planned

Highway 31A, eastbound. Paving operations between Duncan Dr and Retallak for 13.5 km (3 to 16 km east of New Denver). Until Fri Oct 11. From 7:00 AM to 8:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Reduced speed. Watch for crew and equipment. Watch for gravel sections, uneven pavement, milled surfaces. Last updated Tue Aug 13 at 8:52 AM PDT. (DBC-67107)

Posted on: August 19, 2024


Kootenays
Highway 22 – Both Directions – Current Planned

Highway 22, in both directions. Paving operations between Warfield Hill Rd and 5th Ave for 20.2 km (Castlegar to Trail). Until Sat Sep 28 at 8:00 PM PDT. From 6:00 AM to 8:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays. Last updated Wed Aug 14 at 11:39 AM PDT. (DBC-67182)

Posted on: August 15, 2024


Kootenays
Highway 6 EW – Current Planned

Highway 6 EW. Paving operations between McCormack Rd and 1st Ave NE for 35.6 km (Nakusp to 17 km east of Fauquier). Until Sat Sep 21. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Overnight parking of equipment with short single lane alternating traffic section may be in effect. Last updated Thu Aug 8 at 3:59 PM PDT. (DBC-67007)

Posted on: August 13, 2024


Kootenays
Highway 3 – Both Directions – Current Planned

Highway 3 (Crowsnest Highway), in both directions. Bridge construction at Jaffray Overhead Bridge (5 km east of Jaffray). Until Thu Oct 31. Expect delays. Watch for flagging to allow for trucks to enter and exit site. Watch for speed reductions and crews working in the area. Last updated Mon Aug 12 at 9:47 AM MDT. (DBC-60199)

Posted on: August 12, 2024


Kootenays
Highway 1 – Both Directions – Current Planned

Highway 1 (TransCanada Highway), in both directions. Bridge construction between Albert Canyon West Bridge and Albert Canyon Rd (3 km east of East Boundary of Mount Revelstoke National Park). Until Sun Sep 15. From 7:00 AM to 5:30 PM PDT daily. Eastbound lane closure. Detour in effect. Speed reduction from 100 km/h to 60 km/h in effect. Watch for traffic control. No delays expected. Last updated Wed Jun 26 at 1:11 PM PDT. (DBC-65605)

Posted on: June 30, 2024


Kootenays
Highway 31 – Incident

Highway 31. Watch for falling rocks between Balfour and Block Rd for 73.7 km (1 km south of Meadow Creek to Balfour). Last updated Fri Mar 29 at 8:59 PM PDT. (DBC-61482)

Posted on: March 29, 2024


Kootenays
Highway 3A – Incident

Highway 3A. Watch for falling rocks between Fraser Subdivision Rd and Junction Hwy 3 for 77.6 km (1 km south of Kootenay Bay Ferry Landing to Creston). Last updated Fri Mar 29 at 8:58 PM PDT. (DBC-61894)

Posted on: March 29, 2024