Thompson Okanagan
Other Roads – Incident

Eagle Bay Rd. Downed hydro lines between Crescent Point and Eagleview Rd. Road closed. Next update time Thu Sep 5 at 3:00 PM PDT. Last updated Thu Sep 5 at 1:03 PM PDT. (DBC-67933)

Posted on: September 5, 2024


Kootenays
Highway 95A – Both Directions – Future Planned

Highway 95A, in both directions. Utility work planned between the start of Highway 95A and Standard Hill Rd for 1.6 km (Cranbrook). Starting Mon Sep 9 until Fri Oct 18. From 7:00 AM to 1:00 PM MDT on Friday and from 7:00 AM to 7:00 PM MDT on Monday, Tuesday, Wednesday and Thursday. Single lane alternating traffic will be in effect. Expect delays. Last updated Thu Sep 5 at 2:12 PM MDT. (DBC-67935)

Posted on: September 5, 2024


Cariboo
Highway 97 – Current Planned

Highway 97 (Cariboo Connector). Ditching between Soda Creek-MacAlister Rd and Ross Rd for 20.5 km (39 km south of Quesnel to 39 km north of Wildwood). Until Mon Sep 30 at 5:00 PM PDT. Construction work. Northbound lane closure. Expect minor delays. There will be placement of concrete roadside barriers. Please watch for signs and crews. Last updated Thu Sep 5 at 11:49 AM PDT. (DBC-66666)

Posted on: September 5, 2024


Kootenays
Needles Ferry – Both Directions – Incident

Needles Ferry, in both directions. There will be required maintenance between Needles BC and Faquier BC. Starting Sun Sep 8 at 10:00 PM PDT until Sun Sep 8 at 11:00 PM PDT. Ferry route will be closed. Next update time Sun Sep 8 at 11:00 PM PDT. Last updated Thu Sep 5 at 11:04 AM PDT. (DBC-67929)

Posted on: September 5, 2024


Cariboo
Highway 97 – Both Directions – Incident

Highway 97 (Cariboo Connector), in both directions. Vehicle incident between Easzee Dr and Hickling Rd (7 km north of 100 Mile House). Next update time Thu Sep 5 at 11:15 AM PDT. Last updated Thu Sep 5 at 10:24 AM PDT. (DBC-67926)

Posted on: September 5, 2024


Kootenays
Highway 3A – Future Planned

Highway 3A. Special event planned between Baker St and Vernon St for 0.5 km (Nelson). Starting Fri Sep 6 at 6:00 PM PDT until Fri Sep 6 at 7:00 PM PDT. Expect delays due to congestion. Last updated Thu Sep 5 at 9:03 AM PDT. (DBC-67917)

Posted on: September 5, 2024


Cariboo
Likely Rd – Current Planned

Likely Rd. Roadside brushing at Morehead Dam, 16 KM S of Likely. Until Sat Sep 7. From 8:00 AM to 4:30 PM PDT on Thursday and Friday. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Thu Sep 5 at 8:51 AM PDT. (DBC-67914)

Posted on: September 5, 2024


Kootenays
Highway 3A – Future Planned

Highway 3A. Special event planned between 2nd St and Anderson St for 0.1 km (Nelson). Starting Fri Sep 6 at 6:00 PM PDT until Fri Sep 6 at 7:00 PM PDT. Expect delays due to congestion. Last updated Thu Sep 5 at 9:07 AM PDT. (DBC-67918)

Posted on: September 5, 2024


Cariboo
Other Roads – Both Directions – Incident

Cave Road, in both directions. Landslide at Quesnel-Hixon Road. Road closed. Landslide on Cave Road. Next update time Mon Sep 9 at 10:00 AM PDT. Last updated Thu Sep 5 at 9:26 AM PDT. (DBC-67913)

Posted on: September 5, 2024


Thompson Okanagan
Highway 33 – Both Directions – Incident

Highway 33, in both directions. Vehicle recovery between Three Forks Rd and Philpott Rd for 2.7 km (11 to 14 km south of Kelowna). Until Thu Sep 5 at 6:00 PM PDT. Single lane alternating traffic. Watch for traffic control. Last updated Thu Sep 5 at 8:33 AM PDT. (DBC-67912)

Posted on: September 5, 2024


Kootenays
Upper Arrow Lake Ferry – Both Directions – Incident

Upper Arrow Lake Ferry, in both directions. There will be required maintenance between Shelter Bay and Galena Bay. Starting Sat Sep 7 at 11:00 PM PDT until Sun Sep 8 at 5:00 AM PDT. Ferry route will be closed. Last sailing Shelter Bay 22:00
Last sailing Galena Bay 22:30. Next update time Sun Sep 8 at 5:00 AM PDT. Last updated Thu Sep 5 at 8:58 AM PDT. (DBC-67916)

Posted on: September 5, 2024


Cariboo
Highway 24 – Future Planned

Highway 24. Utility work planned between Baker Rd and Taylor Lake Rd for 4.9 km (5 km west of Lone Butte to Lone Butte). Starting Fri Sep 6 at 8:00 AM PDT until Fri Sep 6 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Thu Sep 5 at 8:54 AM PDT. (DBC-67915)

Posted on: September 5, 2024


Thompson Okanagan
Highway 5 – Road Condition

Highway 5. Fog patches between Webb Rd and Wire Cache Rest Area for 81.1 km (2 km south of Little Fort to 18 km south of Avola). Last updated Thu Sep 5 at 6:37 AM PDT. (DBCRCON-187371)

Posted on: September 5, 2024


Thompson Okanagan
Highway 97 – Future Planned

Highway 97. Road maintenance work planned between Pinaus Lake Rd and Back Rd (14 km west of Falkland). Starting Thu Sep 12 until Sun Sep 22. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Thu Sep 5 at 6:59 AM PDT. (DBC-67911)

Posted on: September 5, 2024


Thompson Okanagan
Highway 1 – Current Planned

Highway 1 (TransCanada Highway). Shoulder maintenance between Perry River Bridge and Alpine Lane W for 43.8 km (25 km east of Sicamous to Revelstoke). Until Thu Sep 5 at 12:30 PM PDT. Reduce speed slow moving equipment working. Last updated Thu Sep 5 at 6:42 AM PDT. (DBC-67910)

Posted on: September 5, 2024


Thompson Okanagan
Highway 1 – Future Planned

Highway 1 (TransCanada Highway). Bridge maintenance planned between Old Sicamous Rd and Bruhn Bridge for 0.5 km (Sicamous). Starting Thu Sep 5 at 11:00 AM PDT until Thu Sep 5 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Wed Sep 4 at 5:21 PM PDT. (DBC-67900)

Posted on: September 4, 2024


Thompson Okanagan
Highway 3 – Both Directions – Incident

Highway 3 (Crowsnest Highway), in both directions. Vehicle incident at Whipsaw Creek Rd (11 km west of Princeton). Road closed. Assessment in progress. No detours available. Next update time Wed Sep 4 at 5:00 PM PDT. Last updated Wed Sep 4 at 3:55 PM PDT. (DBC-67893)

Posted on: September 4, 2024


Thompson Okanagan
Highway 1 – Both Directions – Current Planned

Highway 1 (TransCanada Highway), in both directions. Rock scaling between Gladwin Rd and Nicomen River Rd (10 km east of Lytton). Until Mon Oct 28. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Expect delays up to 20 minutes. Last updated Wed Sep 4 at 2:49 PM PDT. (DBC-67889)

Posted on: September 4, 2024


Thompson Okanagan
Highway 1 – Westbound – Future Planned

Highway 1 (TransCanada Highway), westbound. Utility work planned between Old Hatchery Rd and Tappen Valley Rd (Tappen). Starting Wed Sep 11 at 7:00 AM PDT until Wed Sep 11 at 5:00 PM PDT. Lane Closure. Expect minor delays. Last updated Wed Sep 4 at 2:51 PM PDT. (DBC-67890)

Posted on: September 4, 2024


Kootenays
Highway 1 – Both Directions – Future Planned

Highway 1 (TransCanada Highway), in both directions. Crack sealing is planned between Rogers Pass Summit and Beaver Valley Rd for 11.1 km (Rogers Pass Summit). Starting Thu Sep 5 until Fri Sep 6. From 6:00 AM to 9:00 PM PDT on Thursday and Friday. Expect delays. Speed reduction to 50km/h. Last updated Wed Sep 4 at 2:09 PM PDT. (DBC-67886)

Posted on: September 4, 2024


Kootenays
Needles Ferry – Both Directions – Incident

Needles Ferry, in both directions. 1 sailing wait between Fauquier and Needles. Next update time Wed Sep 4 at 8:00 PM PDT. Last updated Wed Sep 4 at 1:31 PM PDT. (DBC-67883)

Posted on: September 4, 2024


Thompson Okanagan
Highway 33 – Northbound – Future Planned

Highway 33, northbound. Construction work planned between Toovey Rd and Molnar Rd for 1.1 km (Kelowna). Starting Fri Sep 6 at 9:00 AM PDT until Fri Sep 13 at 3:00 PM PDT. Lane Closure. Last updated Wed Sep 4 at 1:19 PM PDT. (DBC-67882)

Posted on: September 4, 2024


Thompson Okanagan
Highway 5 – Northbound – Current Planned

Highway 5 (Coquihalla North), northbound. Utility work between Chuwhels Mountain Rd and Inks Lake Rd (11 km south of Kamloops). Until Wed Sep 4 at 5:00 PM PDT. Right lane closed. Watch for traffic control. Last updated Wed Sep 4 at 12:01 PM PDT. (DBC-67879)

Posted on: September 4, 2024


Cariboo
Highway 97 – Northbound – Current Planned

Highway 97 (Cariboo Connector), northbound. Paving operations between Lynes Creek Rd and Robertson Rd for 10.5 km (21 to 10 km north of Wildwood). Until Sat Oct 5. From 7:00 AM to 7:00 PM PDT daily. Single lane alternating traffic. Watch for traffic control. Expect delays. Next update time Wed Sep 11 at 10:00 AM PDT. Last updated Wed Sep 4 at 11:05 AM PDT. (DBC-66273)

Posted on: September 4, 2024


Kootenays
Highway 1 – Both Directions – Future Planned

Highway 1 (TransCanada Highway), in both directions. Maintenance planned between Illecillewaet Brake Check and Glacier National Park East Boundary for 48.9 km (5 km west of West Boundary of Glacier National Park to East Boundary of Glacier National Park). Starting Thu Sep 5 at 7:00 AM PDT until Thu Sep 5 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Wed Sep 4 at 8:44 AM PDT. (DBC-67870)

Posted on: September 4, 2024


Kootenays
Highway 3 – Both Directions – Future Planned

Highway 3 (Crowsnest Highway), in both directions. Bridge maintenance planned at Wardner Bridge (11 km west of Jaffray). Starting Wed Sep 4 at 7:30 AM MDT until Wed Sep 4 at 11:00 AM MDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Wed Sep 4 at 6:29 AM MDT. (DBC-67858)

Posted on: September 4, 2024


Thompson Okanagan
Highway 97A – Current Planned

Highway 97A. Construction work between Salts Rd and Emeny Rd (5 km north of Enderby). Until Wed Sep 25. From 7:00 AM to 7:00 PM PDT on weekdays. New traffic signal installation. Expect delays. Watch for traffic control. Last updated Thu Aug 29 at 2:54 PM PDT. (DBC-67734)

Posted on: September 4, 2024


Thompson Okanagan
Other Roads – Both Directions – Current Planned

WESTSIDE RD , in both directions. Paving operations planned between BROWSE RD and OLD FERRY RD. Starting Tue Sep 3 at 7:45 PM PDT until Thu Sep 5 at 3:00 AM PDT. From 7:45 PM to 3:00 AM PDT on Tuesday, Wednesday and Thursday. Single lane alternating traffic will be in effect. Last updated Tue Sep 3 at 7:37 PM PDT. (DBC-67851)

Posted on: September 3, 2024


Kootenays
Highway 1 – Both Directions – Future Planned

[Truncated] Highway 1 (TransCanada Highway), in both directions. Road construction work planned between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (2 to 5 km west of West Boundary of Glacier National Park). Starting Mon Sep 9 until Sat Nov 30. From 4:00 AM to 8:00 PM PDT on weekdays and Saturday. Full closure 4-6AM, 30 min closures 4AM-8AM and stoppages 8AM-8PM. Emergency vehicle access open. Speed reduced to 50km/hr. Watch for crews. Next update time Sat Nov 30 at 8:00 PM PDT.

Posted on: September 3, 2024


Kootenays
Highway 1 – Future Planned

Highway 1 (TransCanada Highway). Road construction work planned between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Starting Thu Sep 5 at 4:00 AM PDT until Sat Sep 7 at 8:00 PM PDT. 30 minute full closures between 4AM-8AM and intermittent stoppages between 8AM-8PM. Emergency vehicle access open. Speed reduced to 50km/hr. Watch for construction crews. Last updated Tue Sep 3 at 5:31 PM PDT. (DBC-67847)

Posted on: September 3, 2024


Thompson Okanagan
Highway 1 – Eastbound – Incident

Highway 1 (TransCanada Highway), eastbound. Vehicle recovery planned between Grand Blvd and Holman Rd for 0.6 km (Kamloops). Starting Wed Sep 4 at 12:00 PM PDT until Wed Sep 4 at 2:00 PM PDT. Right lane will be closed. Watch for traffic control personnel. Last updated Tue Sep 3 at 4:08 PM PDT. (DBC-67842)

Posted on: September 3, 2024


Kootenays
Highway 93 – Both Directions – Current Planned

Highway 93, in both directions. Construction work between Radium Hill Rd and Stanley St (1 km south of Radium Hot Springs). Until Thu Oct 31. From 7:00 AM to 6:00 PM MDT on weekdays and Saturday. Roadway reduced to one lane. Expect minor delays. The traffic will be reduced to 50km/h. Full closures Sep 13-Oct 4 1am-5am. No alternate route. Emergency vehicle access open. Next update time Thu Oct 31 at 6:00 AM MDT. Last updated Tue Sep 3 at 3:52 PM MDT. (DBC-65247)

Posted on: September 3, 2024


Thompson Okanagan
Highway 5 – Both Directions – Current Planned

Highway 5 (Coquihalla South), in both directions. Bridge maintenance at Exit 238: Juliet Rd (19 km north of Coquihalla Summit). Until Fri Oct 4. Expect delays. Road will be reduced to single lane counterflow traffic Sept 3 to Oct 4 24 hours a day. Please slow down through work zone and obey signage. Last updated Tue Sep 3 at 4:33 PM PDT. (DBC-67845)

Posted on: September 3, 2024


Kootenays
Highway 1 – Eastbound – Future Planned

Highway 1 (TransCanada Highway), eastbound. Road maintenance work planned between West Boundary of Mount Revelstoke National Park and Skunk Cabbage Boardwalk (2 km east of West Boundary of Mount Revelstoke National Park). Starting Thu Sep 5 at 7:00 AM PDT until Thu Sep 5 at 6:00 PM PDT. Shoulder will be closed. Last updated Tue Sep 3 at 4:12 PM PDT. (DBC-67843)

Posted on: September 3, 2024


Thompson Okanagan
Highway 1 – Both Directions – Future Planned

Highway 1 (TransCanada Highway), in both directions. Bridge maintenance planned at Bruhn Bridge (Sicamous). Starting Wed Sep 4 at 8:00 AM PDT until Wed Sep 4 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Tue Sep 3 at 3:22 PM PDT. (DBC-67837)

Posted on: September 3, 2024


Kootenays
Upper Arrow Lake Ferry – Incident

Upper Arrow Lake Ferry. Currently operating 20 minutes behind schedule at Upper Arrow Lake Ferry (Upper Arrow Lake). Next update time Tue Sep 3 at 4:00 PM PDT. Last updated Tue Sep 3 at 3:00 PM PDT. (DBC-67827)

Posted on: September 3, 2024


Kootenays
Highway 1 – Future Planned

Highway 1 (TransCanada Highway). Pavement patching is planned. Between Eagle River at Kay Falls Bridge and Enchanted Forest Ftg Rd for 2.8 km (29 to 32 km west of Revelstoke). Starting Wed Sep 4 at 7:00 AM PDT until Wed Sep 4 at 9:00 AM PDT. Single lane alternating traffic will be in effect. Last updated Tue Sep 3 at 2:02 PM PDT. (DBC-67829)

Posted on: September 3, 2024


Kootenays
Highway 1 – Future Planned

Highway 1 (TransCanada Highway). Shoulder maintenance planned between Avoca Rd W and Highway 23 South for 41.7 km (Revelstoke to 25 km east of Sicamous). Starting Wed Sep 4 at 7:00 AM PDT until Wed Sep 4 at 2:00 PM PDT. Watch for slow moving vehicle. Last updated Tue Sep 3 at 2:06 PM PDT. (DBC-67831)

Posted on: September 3, 2024


Kootenays
Needles Ferry – Both Directions – Incident

Needles Ferry, in both directions. 1 sailing wait at Needles Ferry (Needles). Next update time Tue Sep 3 at 3:00 PM PDT. Last updated Tue Sep 3 at 1:53 PM PDT. (DBC-67828)

Posted on: September 3, 2024


Thompson Okanagan
Highway 5A – Northbound – Future Planned

Highway 5A, northbound. Construction work planned between the start of Highway 5A and Junction Hwy 97C for 61.9 km (Princeton to 1 km north of Aspen Grove). Starting Mon Sep 9 at 8:00 AM PDT until Mon Sep 9 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Tue Sep 3 at 11:50 AM PDT. (DBC-67825)

Posted on: September 3, 2024


Cariboo
Other Roads – Future Planned

Canim Lake Rd. Utility work planned between 610 FSR and Hendrix Rd. Starting Fri Sep 6 at 8:00 AM PDT until Fri Sep 6 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Tue Sep 3 at 11:27 AM PDT. (DBC-67824)

Posted on: September 3, 2024


Cariboo
Highway 99 – Future Planned

Highway 99. Utility work planned between Medicine Man Rd and Old Cariboo Rd for 25.6 km (70 to 44 km north of Lillooet). Starting Thu Sep 5 until Thu Sep 19. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Expect delays. Please watch for signage and personnel. Last updated Tue Sep 3 at 11:14 AM PDT. (DBC-67822)

Posted on: September 3, 2024


Thompson Okanagan
Highway 1 – Both Directions – Current Planned

Highway 1 (TransCanada Highway), in both directions. Bridge construction at Nicomen River Rd (14 km east of Lytton). Until Sat Nov 30. Single lane alternating traffic. Watch for traffic control. Expect delays. Speed reduced to 30km/hr. Highway stoppages with expected delays of 15 minutes. Highway will be closed from 8pm to 6am nightly Sept 23rd to Sept 26th (4 nights). Project completion: Nov 30, 2024. Next update time Tue Sep 10 at 9:00 AM PDT. Last updated Tue Sep 3 at 9:50 AM PDT. (DBC-56391)

Posted on: September 3, 2024


Thompson Okanagan
Highway 5 – Both Directions – Current Planned

Highway 5 (Coquihalla South), in both directions. Bridge maintenance between Exit 238: Juliet Rd and Exit 256: Coldwater Rd for 18.6 km (19 km north of Coquihalla Summit to 29 km south of Merritt). Until Fri Sep 20. Roadway reduced to one lane. Obey signage and watch for traffic control. Expect delays. Last updated Tue Sep 3 at 9:39 AM PDT. (DBC-67818)

Posted on: September 3, 2024


Thompson Okanagan
Highway 3 – Current Planned

Highway 3 (Crowsnest Highway). Ditching between Chapman Rd and Long Joe Rd for 1.1 km (10 to 11 km east of Osoyoos). Until Wed Sep 4 at 4:00 PM PDT. Eastbound lane closure. Watch for traffic control. Watch for traffic control. Last updated Tue Sep 3 at 6:13 AM PDT. (DBC-67807)

Posted on: September 3, 2024


Cariboo
Highway 99 – Current Planned

Highway 99. Utility work between Industrial Pl and E Lillooet Rd for 2.8 km (Lillooet). Until Thu Sep 19. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Fri Aug 30 at 2:37 PM PDT. (DBC-67765)

Posted on: September 3, 2024


Cariboo
Highway 12 – Both Directions – Current Planned

Highway 12, in both directions. Utility work between Munson Rd and 1KM N of Laluwissin Creek FSR. Until Thu Sep 19. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Fri Aug 30 at 1:48 PM PDT. (DBC-67761)

Posted on: September 3, 2024


Cariboo
Other Roads – Current Planned

Puntzi Lake Rd. Utility work between Southwood Rd and 5KM N/O Southwood Rd. Until Fri Sep 20. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Fri Aug 30 at 2:45 PM PDT. (DBC-67768)

Posted on: September 3, 2024


Cariboo
Highway 99 – Both Directions – Current Planned

Highway 99, in both directions. Utility work between Sallus Creek Rd and Smith Rd for 19.1 km (37 to 18 km north of Lillooet). Until Thu Sep 19. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Fri Aug 30 at 1:55 PM PDT. (DBC-67762)

Posted on: September 3, 2024


Cariboo
Highway 12 – Current Planned

Highway 12. Utility work between Fraser Cres and Sumner Rd for 3.9 km (Lillooet). Until Thu Sep 19. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Fri Aug 30 at 1:41 PM PDT. (DBC-67760)

Posted on: September 3, 2024