Cariboo
Other Roads – Current Planned

Puntzi Lake Rd. Utility work between Southwood Rd and 5KM N/O Southwood Rd. Until Fri Sep 20. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Fri Aug 30 at 2:45 PM PDT. (DBC-67768)

Posted on: September 3, 2024


Cariboo
Highway 99 – Both Directions – Current Planned

Highway 99, in both directions. Utility work between Sallus Creek Rd and Smith Rd for 19.1 km (37 to 18 km north of Lillooet). Until Thu Sep 19. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Fri Aug 30 at 1:55 PM PDT. (DBC-67762)

Posted on: September 3, 2024


Cariboo
Highway 12 – Current Planned

Highway 12. Utility work between Fraser Cres and Sumner Rd for 3.9 km (Lillooet). Until Thu Sep 19. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Fri Aug 30 at 1:41 PM PDT. (DBC-67760)

Posted on: September 3, 2024


Cariboo
Highway 99 – Current Planned

Highway 99. Utility work between Fountain Ranch Rd and Headless Gulch Rd. Until Mon Sep 16. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Fri Aug 30 at 2:42 PM PDT. (DBC-67767)

Posted on: September 3, 2024


Kootenays
Highway 93 – Both Directions – Current Planned

Highway 93, in both directions. Rock scaling between McKay Creek Maint and Settlers Rd for 7.6 km (7 to 15 km north of Radium Hot Springs). Until Mon Sep 30. From 7:00 AM to 9:00 PM MDT daily. Watch for traffic control. Expect delays. Speed limit reduced to 30 km/h in work zone. No work on long weekends. Last updated Tue Aug 27 at 11:40 AM MDT. (DBC-67637)

Posted on: September 3, 2024


Kootenays
Highway 1 – Incident

Highway 1 (TransCanada Highway). Vehicle recovery between Hartley Rd and Anderson Rd for 7.6 km (8 km west of Golden to Golden). Until Tue Sep 3 at 5:00 AM MDT. Single lane alternating traffic. Watch for flaggers and recovery crew. Next update time Tue Sep 3 at 5:00 AM MDT. Last updated Mon Sep 2 at 11:09 PM MDT. (DBC-67803)

Posted on: September 2, 2024


Kootenays
Highway 1 – Both Directions – Incident

Highway 1 (TransCanada Highway), in both directions. Road cleared at Anderson Rd (1 km west of Golden). Expect delays due to congestion. Last updated Mon Sep 2 at 8:49 PM MDT. (DBC-67802)

Posted on: September 2, 2024


Kootenays
Upper Arrow Lake Ferry – Westbound – Incident

Upper Arrow Lake Ferry, westbound. 1 sailing wait at Upper Arrow Lake Ferry. Due to high traffic volume. Next update time Mon Sep 2 at 2:30 PM PDT. Last updated Mon Sep 2 at 1:02 PM PDT. (DBC-67797)

Posted on: September 2, 2024


Kootenays
Needles Ferry – Westbound – Incident

Needles Ferry, westbound. 2 sailing wait between the end of Needles Ferry and Needles Ferry for 0.1 km (Needles). Possible ferry delays. 2 sailing wait from the Fauquier side. Next update time Mon Sep 2 at 2:30 PM PDT. Last updated Mon Sep 2 at 1:05 PM PDT. (DBC-67799)

Posted on: September 2, 2024


Cariboo
Highway 97 – Current Planned

Highway 97 (Cariboo Connector). Utility work between Canim-Hendrix Lake Rd and Dawson Rd for 5.3 km (100 Mile House). Until Mon Sep 30. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Fri Aug 30 at 1:30 PM PDT. (DBC-67758)

Posted on: September 2, 2024


Kootenays
Highway 93 – Both Directions – Future Planned

Highway 93, in both directions. Construction work planned between Settlers Rd and Kootenay Crossing Warden Station (20 km north of Radium Hot Springs). Starting Tue Sep 3 until Thu Sep 5. Expect construction zone reduced speed limits and some delays during daylight hours. Last updated Sun Sep 1 at 11:25 PM MDT. (DBC-67792)

Posted on: September 1, 2024


Thompson Okanagan
Highway 97 – Both Directions – Future Planned

Highway 97, in both directions. Road maintenance work planned between Princeton Ave and Seclusion Bay Rd for 7.2 km (Peachland). Starting Sat Aug 31 at 9:00 PM PDT until Sun Sep 1 at 3:00 AM PDT. Mowing. Yield to oncoming traffic. Observe and be aware. Last updated Sat Aug 31 at 7:57 PM PDT. (DBC-67782)

Posted on: August 31, 2024


Thompson Okanagan
Highway 5 – Southbound – Incident

Highway 5 (Coquihalla North), southbound. Police incident between Exit 290: Merritt and Exit 286: Merritt – 97C for 13.0 km (Merritt). Right lane closed. Expect delays. Watch for traffic control. Next update time Fri Aug 30 at 11:00 PM PDT. Last updated Fri Aug 30 at 7:57 PM PDT. (DBC-67773)

Posted on: August 30, 2024


Thompson Okanagan
Highway 97 – Both Directions – Future Planned

Highway 97, in both directions. Mowing between Princeton Ave and Seclusion Bay Rd for 7.2 km (Peachland). Starting Fri Aug 30 at 8:00 PM PDT until Sat Aug 31 at 3:00 AM PDT. Slow moving vehicles. Slow down and yield to oncoming traffic. Last updated Fri Aug 30 at 5:18 PM PDT. (DBC-67771)

Posted on: August 30, 2024


Thompson Okanagan
Highway 1 – Future Planned

Highway 1 (TransCanada Highway). Road maintenance work planned between Vavasour Rd and Watson Dr E for 2.8 km (34 to 31 km west of Kamloops). Starting Tue Sep 3 at 6:00 AM PDT until Thu Sep 5 at 6:00 PM PDT. From 6:00 AM to 6:00 AM PDT daily. Single lane alternating traffic will be in effect. Last updated Fri Aug 30 at 4:47 PM PDT. (DBC-67770)

Posted on: August 30, 2024


Thompson Okanagan
Highway 1 – Both Directions – Current Planned

Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 6:00 AM to 5:00 PM PDT on weekdays. Blasting. Road closed intermittently. Watch for traffic control. Next update time Mon Sep 30 at 10:00 AM PDT. Last updated Fri Aug 30 at 10:25 AM PDT. (DBC-64961)

Posted on: August 30, 2024


Thompson Okanagan
Highway 1 – Future Planned

Highway 1 (TransCanada Highway). Shoulder maintenance planned between Blind Bay Rd and Hilltop Rd for 3.8 km (13 to 17 km west of Tappen). Starting Mon Sep 16 at 9:00 AM PDT until Wed Sep 25 at 4:00 PM PDT. Shoulder will be closed. Pole replacements – East bound – work on shoulder. Hwy 1 – Blind Bay Rd to Hilltop Rd. Last updated Thu Aug 29 at 2:33 PM PDT. (DBC-67731)

Posted on: August 29, 2024


Thompson Okanagan
Highway 97 – Current Planned

Highway 97. Paving operations between Similkameen Ave and 14th Ave for 20.9 km (Okanagan Falls to Oliver). Until Sat Sep 28. Lane Closure. Expect delays. Last updated Thu Aug 29 at 1:24 PM PDT. (DBC-67725)

Posted on: August 29, 2024


Thompson Okanagan
Highway 1 – Both Directions – Future Planned

Highway 1 (TransCanada Highway), in both directions. Construction work planned between Gladwin Rd and Junction Hwy 8 for 0.4 km (14 km east of Lytton). Starting Mon Sep 23 until Thu Sep 26. From 8:00 PM to 6:00 AM PDT on Monday, Tuesday, Wednesday and Thursday. Road closure planned. Access to Nicomen River road will be restricted to eastbound exiting traffic only. Last updated Thu Aug 29 at 10:38 AM PDT. (DBC-67719)

Posted on: August 29, 2024


Cariboo
Other Roads – Both Directions – Incident

Soda-Creek Macalister Road, in both directions. Landslide at 10 kms from the Junction of Highway 97. Road closed. Geotech assessment underway. Next update time Fri Feb 21, 2025 at 2:00 PM PDT. Last updated Mon Aug 26 at 2:45 PM PDT. (DBC-16911)

Posted on: August 26, 2024


Thompson Okanagan
Highway 5 – Northbound – Current Planned

Highway 5, northbound. Utility work between Petrol Rd and Blackwater Rd for 1.3 km (9 to 8 km south of Clearwater). Until Fri Sep 13. From 8:00 AM to 4:00 PM PDT daily. Lane Closure. Single lane alternating traffic. Watch for traffic control. Last updated Wed Aug 14 at 3:57 PM PDT. (DBC-67191)

Posted on: August 26, 2024


Cariboo
Other Roads – Incident

Johnston Bridge. Travel advisory in effect at Front St. In Quesnel. Bridge closed. Northbound and southbound traffic will detour through Johnston Subdivision and North Star Road. Industrial traffic and heavy commercial traffic must detour via Plywood Rd. And Maple Drive. Industrial traffic is not allowed to detour through Johnston Subdivision. Next update time Fri Sep 20 at 2:00 PM PDT. Last updated Thu Aug 22 at 2:53 PM PDT. (DBC-47311)

Posted on: August 22, 2024


Kootenays
Highway 3 – Both Directions – Current Planned

Highway 3 (Crowsnest Highway), in both directions. Paving operations between Jim Smith Lake Rd and Ft. Steele Overhead Bridge for 5.8 km (Cranbrook). Until Sun Sep 29. Lane Closure. Watch for traffic control. Expect delays. Single lane traffic with 10 minute delay. Last updated Thu Aug 15 at 1:59 PM MDT. (DBC-67226)

Posted on: August 21, 2024


Cariboo
Highway 97 – Southbound – Current Planned

Highway 97, southbound. Construction work between Exeter Station Road and Birch Ave 1 km north of 100 Mile House. Until Fri Sep 20. From 8:00 AM to 4:00 PM PDT daily. Southbound lane closure. Right lane closed. Expect minor delays. Last updated Thu Aug 15 at 8:58 AM PDT. (DBC-67216)

Posted on: August 19, 2024


Kootenays
Highway 31A – Eastbound – Current Planned

Highway 31A, eastbound. Paving operations between Duncan Dr and Retallak for 13.5 km (3 to 16 km east of New Denver). Until Fri Oct 11. From 7:00 AM to 8:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Reduced speed. Watch for crew and equipment. Watch for gravel sections, uneven pavement, milled surfaces. Last updated Tue Aug 13 at 8:52 AM PDT. (DBC-67107)

Posted on: August 19, 2024


Kootenays
Highway 22 – Both Directions – Current Planned

Highway 22, in both directions. Paving operations between Warfield Hill Rd and 5th Ave for 20.2 km (Castlegar to Trail). Until Sat Sep 28 at 8:00 PM PDT. From 6:00 AM to 8:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays. Last updated Wed Aug 14 at 11:39 AM PDT. (DBC-67182)

Posted on: August 15, 2024


Kootenays
Highway 6 EW – Current Planned

Highway 6 EW. Paving operations between McCormack Rd and 1st Ave NE for 35.6 km (Nakusp to 17 km east of Fauquier). Until Sat Sep 21. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Overnight parking of equipment with short single lane alternating traffic section may be in effect. Last updated Thu Aug 8 at 3:59 PM PDT. (DBC-67007)

Posted on: August 13, 2024


Kootenays
Highway 3 – Both Directions – Current Planned

Highway 3 (Crowsnest Highway), in both directions. Bridge construction at Jaffray Overhead Bridge (5 km east of Jaffray). Until Thu Oct 31. Expect delays. Watch for flagging to allow for trucks to enter and exit site. Watch for speed reductions and crews working in the area. Last updated Mon Aug 12 at 9:47 AM MDT. (DBC-60199)

Posted on: August 12, 2024


Thompson Okanagan
Highway 5 – Both Directions – Current Planned

Highway 5, in both directions. Construction work between Carilla Rd and Clough Rd for 3.7 km (11 to 7 km south of Barriere). Lane closures in both directions in effect. No lane closures on Sunday. Reduced speed 24 hours per day. Next update time Sat Sep 28 at 11:00 AM PDT. Last updated Mon Aug 12 at 8:04 AM PDT. (DBC-66432)

Posted on: August 12, 2024


Cariboo
Other Roads – Incident

Kersley-Dale Landing Rd. Landslide at 500 metres in from Highway 97 Intersection. Road closed. A temporary Single Lane Gravel Road for Local Traffic via Arnoldus Road. Next update time Mon Dec 9 at 9:00 AM PDT. Last updated Thu Aug 8 at 9:26 AM PDT. (DBC-23443)

Posted on: August 8, 2024


Cariboo
Other Roads – Both Directions – Incident

McKay Road, in both directions. Flooding at McKay Road. Road closed. Next update time Mon Dec 9 at 9:00 AM PDT. Last updated Thu Aug 8 at 9:26 AM PDT. (DBC-53013)

Posted on: August 8, 2024


Thompson Okanagan
Highway 97 – Southbound – Current Planned

Highway 97, southbound. Road maintenance work between William R Bennett Bridge and Glenrosa Rd for 14.1 km (West Kelowna to Kelowna). From 7:00 PM to 3:00 AM PDT on Tuesday and Wednesday. Slow moving vehicles Watch for crew and flaggers. Last updated Tue Aug 6 at 6:39 PM PDT. (DBC-66925)

Posted on: August 6, 2024


Thompson Okanagan
Highway 97 – Both Directions – Incident

Highway 97, in both directions. Landslide between Callan Rd and N Beach Rd for 1.5 km (2 to 1 km north of Summerland). Landslide between Callan Rd and N Beach Rd. Road open to two-way traffic. Expect intermittent closures of 10 minutes. Next update time Mon Oct 7 at 12:30 PM PDT. Last updated Thu Aug 1 at 4:48 PM PDT. (DBC-55794)

Posted on: August 1, 2024


Thompson Okanagan
Highway 1 – Both Directions – Current Planned

Highway 1 (TransCanada Highway), in both directions. Blasting between Shuswap Chase Creek Road and Coburn St for 2.8 km (Chase). Until Fri Sep 27 at 4:00 PM PDT. From 5:00 AM to 4:00 PM PDT on weekdays and Saturday. Lane Closure. Construction in both directions. Random stoppages of 5 minutes. Blasting closures most days between 9:00 AM to 1:00 PM for 20 minutes. Last updated Tue Jul 23 at 1:31 PM PDT. (DBC-66492)

Posted on: July 29, 2024


Cariboo
Highway 97 – Current Planned

Highway 97 (Cariboo Connector). Road construction work between Pollard Rd and Umiti Pit Rd for 3.8 km (15 to 11 km north of Quesnel). Until Fri Oct 25. From 7:00 AM to 7:00 PM PDT daily. Northbound lane closure. Expect minor delays. Please watch for signage and personnel. Expect speed reductions as well as minor delays of up to 20 minutes. Last updated Fri Jul 26 at 1:48 PM PDT. (DBC-66606)

Posted on: July 26, 2024


Thompson Okanagan
Other Roads – Both Directions – Future Planned

East and West, in both directions. Utility work planned between Bryden Rd and Barber Rd near Kelowna. Starting Tue Sep 24 at 9:00 AM PDT until Tue Sep 24 at 3:00 PM PDT. Lane Closure. Fibre Optic removal and placement. Single lane closure between Bryden Rd and Barber Rd. Approx. Delay of 5 minutes east and west bound. Last updated Thu Jul 25 at 1:35 PM PDT. (DBC-66570)

Posted on: July 25, 2024


Thompson Okanagan
Highway 97 – Both Directions – Current Planned

Highway 97, in both directions. Maintenance between Abbott St and Old Vernon Rd for 10.0 km (Kelowna). Until Thu Oct 31 at 6:00 AM PDT. Centre lane is closed in both directions. Median Landscaping – Intermittently moving work between 10 pm and 6 am Monday, Tuesday, Wednesday from July 24 to October 31. Centre lane closed in both directions. Delay length of 5 minutes in all directions. Last updated Thu Jul 25 at 1:24 PM PDT. (DBC-66569)

Posted on: July 25, 2024


Cariboo
Highway 97 – Both Directions – Current Planned

Highway 97 (Cariboo Connector), in both directions. Bridge construction between Stephenson Rd and Stage Rd for 0.1 km (Cache Creek). Until Mon Sep 30 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on weekdays. Expect minor delays. Last updated Thu Jul 18 at 12:47 PM PDT. (DBC-65990)

Posted on: July 18, 2024


Cariboo
Highway 26 – Both Directions – Current Planned

Highway 26, in both directions. Paving operations at 500 Nyland Lake Rd (16 km east of Quesnel). Until Wed Sep 11 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Lane Closure. Pilot car controlled. Last updated Tue Jul 9 at 7:26 PM PDT. (DBC-66046)

Posted on: July 10, 2024


Thompson Okanagan
Other Roads – Both Directions – Current Planned

Youngsberg Road, in both directions. Bridge construction at Youngsberg Bridge near Princeton. Road closed. Estimated time of opening not available. No vehicle or pedestrian crossing available. Next update time Mon Sep 9 at 3:00 PM PDT. Last updated Mon Jul 8 at 3:46 PM PDT. (DBC-35978)

Posted on: July 8, 2024


Kootenays
Highway 1 – Both Directions – Current Planned

Highway 1 (TransCanada Highway), in both directions. Bridge construction between Albert Canyon West Bridge and Albert Canyon Rd (3 km east of East Boundary of Mount Revelstoke National Park). Until Sun Sep 15. From 7:00 AM to 5:30 PM PDT daily. Eastbound lane closure. Detour in effect. Speed reduction from 100 km/h to 60 km/h in effect. Watch for traffic control. No delays expected. Last updated Wed Jun 26 at 1:11 PM PDT. (DBC-65605)

Posted on: June 30, 2024


Cariboo
Road 40 – Current Planned

Road 40 (Lillooet-Pioneer Rd). Utility work between Gun Creek Pit Rd and Mission Mountain Rd for 48.0 km (91 to 43 km west of Lillooet). Until Mon Sep 23. From 8:00 AM to 8:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 20 minutes. Please watch for signage and personnel. Last updated Fri Jun 7 at 3:58 PM PDT. (DBC-64947)

Posted on: June 8, 2024


Thompson Okanagan
Other Roads – Both Directions – Current Planned

Halston Avenue Connector, in both directions. Bridge construction between Kingston Avenue and Salish Road in Kamloops. Lane closures in both directions in effect. Watch for traffic control. Possible delays. Next update time Mon Sep 30 at 9:00 AM PDT. Last updated Thu Jun 6 at 3:09 PM PDT. (DBC-61191)

Posted on: June 6, 2024


Cariboo
Highway 20 – Both Directions – Current Planned

Highway 20, in both directions. Road maintenance work between Fisheries Pool Campground Access Rd and Rainbow Range Trailhead for 36.3 km (17 km east of Firvale to 39 km west of Anahim Lake). Until Wed May 7, 2025. From 7:00 AM to 3:30 PM PDT on weekdays. Single lane alternating traffic. Last updated Tue May 28 at 6:06 PM PDT. (DBC-64459)

Posted on: May 28, 2024


Thompson Okanagan
Highway 1 – Both Directions – Current Planned

Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Tappen Valley Rd for 3.2 km (Tappen). Until Tue Dec 31. From 7:00 AM to 12:00 AM PDT on weekdays and Saturday. Expect delays. Reduced speed through work zone at 80 km/hr during inactive work, 60 km/hr during active work. Intermittent minor stoppages. Last updated Tue May 28 at 2:20 PM PDT. (DBC-57219)

Posted on: May 28, 2024


Thompson Okanagan
Highway 1 – Both Directions – Current Planned

Highway 1 (TransCanada Highway), in both directions. Blasting between Tappen Beach Rd and 65 Ave NW (1 km west of Salmon Arm). Until Thu Oct 31. From 5:30 PM to 3:00 AM PDT and from 7:00 AM to 5:00 PM PDT on weekdays and Saturday. Up to one 20 minute closure daily. Additional 5 minute closures may be required intermittently. Watch for traffic control. Last updated Tue May 28 at 2:20 PM PDT. (DBC-57687)

Posted on: May 28, 2024


Cariboo
Other Roads – Both Directions – Incident

Durrell Road, in both directions. Landslide at 700m from Highway 97. Road closed. Detour in effect. Detour available via Highway 97 and Dale Lake Road. Next update time Wed Oct 23 at 12:00 PM PDT. Last updated Mon Apr 22 at 1:30 PM PDT. (DBC-27390)

Posted on: April 22, 2024


Cariboo
Other Roads – Both Directions – Incident

Quesnel-Hixon Road, in both directions. Landslide at Cottonwood bridge. Road closed. Next update time Wed Oct 23 at 2:00 PM PDT. Last updated Wed Apr 17 at 2:22 PM PDT. (DBC-28386)

Posted on: April 17, 2024


Kootenays
Highway 31 – Incident

Highway 31. Watch for falling rocks between Balfour and Block Rd for 73.7 km (1 km south of Meadow Creek to Balfour). Last updated Fri Mar 29 at 8:59 PM PDT. (DBC-61482)

Posted on: March 29, 2024


Kootenays
Highway 3A – Incident

Highway 3A. Watch for falling rocks between Fraser Subdivision Rd and Junction Hwy 3 for 77.6 km (1 km south of Kootenay Bay Ferry Landing to Creston). Last updated Fri Mar 29 at 8:58 PM PDT. (DBC-61894)

Posted on: March 29, 2024