Highway 1 (TransCanada Highway), in both directions. Maintenance planned between Illecillewaet Brake Check and Glacier National Park East Boundary for 48.9 km (5 km west of West Boundary of Glacier National Park to East Boundary of Glacier National Park). Starting Thu Sep 5 at 7:00 AM PDT until Thu Sep 5 at 3:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Wed Sep 4 at 8:44 AM PDT. (DBC-67870)
Highway 3 (Crowsnest Highway), in both directions. Bridge maintenance planned at Wardner Bridge (11 km west of Jaffray). Starting Wed Sep 4 at 7:30 AM MDT until Wed Sep 4 at 11:00 AM MDT. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Wed Sep 4 at 6:29 AM MDT. (DBC-67858)
Highway 97A. Construction work between Salts Rd and Emeny Rd (5 km north of Enderby). Until Wed Sep 25. From 7:00 AM to 7:00 PM PDT on weekdays. New traffic signal installation. Expect delays. Watch for traffic control. Last updated Thu Aug 29 at 2:54 PM PDT. (DBC-67734)
WESTSIDE RD , in both directions. Paving operations planned between BROWSE RD and OLD FERRY RD. Starting Tue Sep 3 at 7:45 PM PDT until Thu Sep 5 at 3:00 AM PDT. From 7:45 PM to 3:00 AM PDT on Tuesday, Wednesday and Thursday. Single lane alternating traffic will be in effect. Last updated Tue Sep 3 at 7:37 PM PDT. (DBC-67851)
[Truncated] Highway 1 (TransCanada Highway), in both directions. Road construction work planned between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (2 to 5 km west of West Boundary of Glacier National Park). Starting Mon Sep 9 until Sat Nov 30. From 4:00 AM to 8:00 PM PDT on weekdays and Saturday. Full closure 4-6AM, 30 min closures 4AM-8AM and stoppages 8AM-8PM. Emergency vehicle access open. Speed reduced to 50km/hr. Watch for crews. Next update time Sat Nov 30 at 8:00 PM PDT.
Highway 1 (TransCanada Highway). Road construction work planned between Illecillewaet Brake Check and MacDonald Snowshed for 3.0 km (5 to 2 km west of West Boundary of Glacier National Park). Starting Thu Sep 5 at 4:00 AM PDT until Sat Sep 7 at 8:00 PM PDT. 30 minute full closures between 4AM-8AM and intermittent stoppages between 8AM-8PM. Emergency vehicle access open. Speed reduced to 50km/hr. Watch for construction crews. Last updated Tue Sep 3 at 5:31 PM PDT. (DBC-67847)
Highway 1 (TransCanada Highway), eastbound. Vehicle recovery planned between Grand Blvd and Holman Rd for 0.6 km (Kamloops). Starting Wed Sep 4 at 12:00 PM PDT until Wed Sep 4 at 2:00 PM PDT. Right lane will be closed. Watch for traffic control personnel. Last updated Tue Sep 3 at 4:08 PM PDT. (DBC-67842)
Highway 93, in both directions. Construction work between Radium Hill Rd and Stanley St (1 km south of Radium Hot Springs). Until Thu Oct 31. From 7:00 AM to 6:00 PM MDT on weekdays and Saturday. Roadway reduced to one lane. Expect minor delays. The traffic will be reduced to 50km/h. Full closures Sep 13-Oct 4 1am-5am. No alternate route. Emergency vehicle access open. Next update time Thu Oct 31 at 6:00 AM MDT. Last updated Tue Sep 3 at 3:52 PM MDT. (DBC-65247)
Highway 5 (Coquihalla South), in both directions. Bridge maintenance at Exit 238: Juliet Rd (19 km north of Coquihalla Summit). Until Fri Oct 4. Expect delays. Road will be reduced to single lane counterflow traffic Sept 3 to Oct 4 24 hours a day. Please slow down through work zone and obey signage. Last updated Tue Sep 3 at 4:33 PM PDT. (DBC-67845)
Highway 1 (TransCanada Highway), eastbound. Road maintenance work planned between West Boundary of Mount Revelstoke National Park and Skunk Cabbage Boardwalk (2 km east of West Boundary of Mount Revelstoke National Park). Starting Thu Sep 5 at 7:00 AM PDT until Thu Sep 5 at 6:00 PM PDT. Shoulder will be closed. Last updated Tue Sep 3 at 4:12 PM PDT. (DBC-67843)
Highway 1 (TransCanada Highway), in both directions. Bridge maintenance planned at Bruhn Bridge (Sicamous). Starting Wed Sep 4 at 8:00 AM PDT until Wed Sep 4 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Last updated Tue Sep 3 at 3:22 PM PDT. (DBC-67837)
Upper Arrow Lake Ferry. Currently operating 20 minutes behind schedule at Upper Arrow Lake Ferry (Upper Arrow Lake). Next update time Tue Sep 3 at 4:00 PM PDT. Last updated Tue Sep 3 at 3:00 PM PDT. (DBC-67827)
Highway 1 (TransCanada Highway). Pavement patching is planned. Between Eagle River at Kay Falls Bridge and Enchanted Forest Ftg Rd for 2.8 km (29 to 32 km west of Revelstoke). Starting Wed Sep 4 at 7:00 AM PDT until Wed Sep 4 at 9:00 AM PDT. Single lane alternating traffic will be in effect. Last updated Tue Sep 3 at 2:02 PM PDT. (DBC-67829)
Highway 1 (TransCanada Highway). Shoulder maintenance planned between Avoca Rd W and Highway 23 South for 41.7 km (Revelstoke to 25 km east of Sicamous). Starting Wed Sep 4 at 7:00 AM PDT until Wed Sep 4 at 2:00 PM PDT. Watch for slow moving vehicle. Last updated Tue Sep 3 at 2:06 PM PDT. (DBC-67831)
Needles Ferry, in both directions. 1 sailing wait at Needles Ferry (Needles). Next update time Tue Sep 3 at 3:00 PM PDT. Last updated Tue Sep 3 at 1:53 PM PDT. (DBC-67828)
Highway 5A, northbound. Construction work planned between the start of Highway 5A and Junction Hwy 97C for 61.9 km (Princeton to 1 km north of Aspen Grove). Starting Mon Sep 9 at 8:00 AM PDT until Mon Sep 9 at 5:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Last updated Tue Sep 3 at 11:50 AM PDT. (DBC-67825)
Canim Lake Rd. Utility work planned between 610 FSR and Hendrix Rd. Starting Fri Sep 6 at 8:00 AM PDT until Fri Sep 6 at 4:00 PM PDT. Single lane alternating traffic will be in effect. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Tue Sep 3 at 11:27 AM PDT. (DBC-67824)
Highway 99. Utility work planned between Medicine Man Rd and Old Cariboo Rd for 25.6 km (70 to 44 km north of Lillooet). Starting Thu Sep 5 until Thu Sep 19. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Expect delays. Please watch for signage and personnel. Last updated Tue Sep 3 at 11:14 AM PDT. (DBC-67822)
Highway 1 (TransCanada Highway), in both directions. Bridge construction at Nicomen River Rd (14 km east of Lytton). Until Sat Nov 30. Single lane alternating traffic. Watch for traffic control. Expect delays. Speed reduced to 30km/hr. Highway stoppages with expected delays of 15 minutes. Highway will be closed from 8pm to 6am nightly Sept 23rd to Sept 26th (4 nights). Project completion: Nov 30, 2024. Next update time Tue Sep 10 at 9:00 AM PDT. Last updated Tue Sep 3 at 9:50 AM PDT. (DBC-56391)
Highway 5 (Coquihalla South), in both directions. Bridge maintenance between Exit 238: Juliet Rd and Exit 256: Coldwater Rd for 18.6 km (19 km north of Coquihalla Summit to 29 km south of Merritt). Until Fri Sep 20. Roadway reduced to one lane. Obey signage and watch for traffic control. Expect delays. Last updated Tue Sep 3 at 9:39 AM PDT. (DBC-67818)
Highway 3 (Crowsnest Highway). Ditching between Chapman Rd and Long Joe Rd for 1.1 km (10 to 11 km east of Osoyoos). Until Wed Sep 4 at 4:00 PM PDT. Eastbound lane closure. Watch for traffic control. Watch for traffic control. Last updated Tue Sep 3 at 6:13 AM PDT. (DBC-67807)
Highway 99. Utility work between Industrial Pl and E Lillooet Rd for 2.8 km (Lillooet). Until Thu Sep 19. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Fri Aug 30 at 2:37 PM PDT. (DBC-67765)
Highway 12, in both directions. Utility work between Munson Rd and 1KM N of Laluwissin Creek FSR. Until Thu Sep 19. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Fri Aug 30 at 1:48 PM PDT. (DBC-67761)
Puntzi Lake Rd. Utility work between Southwood Rd and 5KM N/O Southwood Rd. Until Fri Sep 20. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Fri Aug 30 at 2:45 PM PDT. (DBC-67768)
Highway 99, in both directions. Utility work between Sallus Creek Rd and Smith Rd for 19.1 km (37 to 18 km north of Lillooet). Until Thu Sep 19. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Fri Aug 30 at 1:55 PM PDT. (DBC-67762)
Highway 12. Utility work between Fraser Cres and Sumner Rd for 3.9 km (Lillooet). Until Thu Sep 19. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Fri Aug 30 at 1:41 PM PDT. (DBC-67760)
Highway 99. Utility work between Fountain Ranch Rd and Headless Gulch Rd. Until Mon Sep 16. From 8:00 AM to 4:00 PM PDT daily. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Fri Aug 30 at 2:42 PM PDT. (DBC-67767)
Highway 93, in both directions. Rock scaling between McKay Creek Maint and Settlers Rd for 7.6 km (7 to 15 km north of Radium Hot Springs). Until Mon Sep 30. From 7:00 AM to 9:00 PM MDT daily. Watch for traffic control. Expect delays. Speed limit reduced to 30 km/h in work zone. No work on long weekends. Last updated Tue Aug 27 at 11:40 AM MDT. (DBC-67637)
Highway 1 (TransCanada Highway). Vehicle recovery between Hartley Rd and Anderson Rd for 7.6 km (8 km west of Golden to Golden). Until Tue Sep 3 at 5:00 AM MDT. Single lane alternating traffic. Watch for flaggers and recovery crew. Next update time Tue Sep 3 at 5:00 AM MDT. Last updated Mon Sep 2 at 11:09 PM MDT. (DBC-67803)
Highway 1 (TransCanada Highway), in both directions. Road cleared at Anderson Rd (1 km west of Golden). Expect delays due to congestion. Last updated Mon Sep 2 at 8:49 PM MDT. (DBC-67802)
Upper Arrow Lake Ferry, westbound. 1 sailing wait at Upper Arrow Lake Ferry. Due to high traffic volume. Next update time Mon Sep 2 at 2:30 PM PDT. Last updated Mon Sep 2 at 1:02 PM PDT. (DBC-67797)
Needles Ferry, westbound. 2 sailing wait between the end of Needles Ferry and Needles Ferry for 0.1 km (Needles). Possible ferry delays. 2 sailing wait from the Fauquier side. Next update time Mon Sep 2 at 2:30 PM PDT. Last updated Mon Sep 2 at 1:05 PM PDT. (DBC-67799)
Highway 97 (Cariboo Connector). Utility work between Canim-Hendrix Lake Rd and Dawson Rd for 5.3 km (100 Mile House). Until Mon Sep 30. From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Fri Aug 30 at 1:30 PM PDT. (DBC-67758)
Highway 93, in both directions. Construction work planned between Settlers Rd and Kootenay Crossing Warden Station (20 km north of Radium Hot Springs). Starting Tue Sep 3 until Thu Sep 5. Expect construction zone reduced speed limits and some delays during daylight hours. Last updated Sun Sep 1 at 11:25 PM MDT. (DBC-67792)
Highway 97, in both directions. Road maintenance work planned between Princeton Ave and Seclusion Bay Rd for 7.2 km (Peachland). Starting Sat Aug 31 at 9:00 PM PDT until Sun Sep 1 at 3:00 AM PDT. Mowing. Yield to oncoming traffic. Observe and be aware. Last updated Sat Aug 31 at 7:57 PM PDT. (DBC-67782)
Highway 5 (Coquihalla North), southbound. Police incident between Exit 290: Merritt and Exit 286: Merritt – 97C for 13.0 km (Merritt). Right lane closed. Expect delays. Watch for traffic control. Next update time Fri Aug 30 at 11:00 PM PDT. Last updated Fri Aug 30 at 7:57 PM PDT. (DBC-67773)
Highway 97, in both directions. Mowing between Princeton Ave and Seclusion Bay Rd for 7.2 km (Peachland). Starting Fri Aug 30 at 8:00 PM PDT until Sat Aug 31 at 3:00 AM PDT. Slow moving vehicles. Slow down and yield to oncoming traffic. Last updated Fri Aug 30 at 5:18 PM PDT. (DBC-67771)
Highway 1 (TransCanada Highway). Road maintenance work planned between Vavasour Rd and Watson Dr E for 2.8 km (34 to 31 km west of Kamloops). Starting Tue Sep 3 at 6:00 AM PDT until Thu Sep 5 at 6:00 PM PDT. From 6:00 AM to 6:00 AM PDT daily. Single lane alternating traffic will be in effect. Last updated Fri Aug 30 at 4:47 PM PDT. (DBC-67770)
Highway 1 (TransCanada Highway), in both directions. Construction work between Coburn St and Shuswap Ave for 0.7 km (Chase). From 6:00 AM to 5:00 PM PDT on weekdays. Blasting. Road closed intermittently. Watch for traffic control. Next update time Mon Sep 30 at 10:00 AM PDT. Last updated Fri Aug 30 at 10:25 AM PDT. (DBC-64961)
Highway 1 (TransCanada Highway). Shoulder maintenance planned between Blind Bay Rd and Hilltop Rd for 3.8 km (13 to 17 km west of Tappen). Starting Mon Sep 16 at 9:00 AM PDT until Wed Sep 25 at 4:00 PM PDT. Shoulder will be closed. Pole replacements – East bound – work on shoulder. Hwy 1 – Blind Bay Rd to Hilltop Rd. Last updated Thu Aug 29 at 2:33 PM PDT. (DBC-67731)
Highway 97. Paving operations between Similkameen Ave and 14th Ave for 20.9 km (Okanagan Falls to Oliver). Until Sat Sep 28. Lane Closure. Expect delays. Last updated Thu Aug 29 at 1:24 PM PDT. (DBC-67725)
Highway 1 (TransCanada Highway), in both directions. Construction work planned between Gladwin Rd and Junction Hwy 8 for 0.4 km (14 km east of Lytton). Starting Mon Sep 23 until Thu Sep 26. From 8:00 PM to 6:00 AM PDT on Monday, Tuesday, Wednesday and Thursday. Road closure planned. Access to Nicomen River road will be restricted to eastbound exiting traffic only. Last updated Thu Aug 29 at 10:38 AM PDT. (DBC-67719)
Soda-Creek Macalister Road, in both directions. Landslide at 10 kms from the Junction of Highway 97. Road closed. Geotech assessment underway. Next update time Fri Feb 21, 2025 at 2:00 PM PDT. Last updated Mon Aug 26 at 2:45 PM PDT. (DBC-16911)
Highway 5, northbound. Utility work between Petrol Rd and Blackwater Rd for 1.3 km (9 to 8 km south of Clearwater). Until Fri Sep 13. From 8:00 AM to 4:00 PM PDT daily. Lane Closure. Single lane alternating traffic. Watch for traffic control. Last updated Wed Aug 14 at 3:57 PM PDT. (DBC-67191)
Johnston Bridge. Travel advisory in effect at Front St. In Quesnel. Bridge closed. Northbound and southbound traffic will detour through Johnston Subdivision and North Star Road. Industrial traffic and heavy commercial traffic must detour via Plywood Rd. And Maple Drive. Industrial traffic is not allowed to detour through Johnston Subdivision. Next update time Fri Sep 20 at 2:00 PM PDT. Last updated Thu Aug 22 at 2:53 PM PDT. (DBC-47311)
Highway 3 (Crowsnest Highway), in both directions. Paving operations between Jim Smith Lake Rd and Ft. Steele Overhead Bridge for 5.8 km (Cranbrook). Until Sun Sep 29. Lane Closure. Watch for traffic control. Expect delays. Single lane traffic with 10 minute delay. Last updated Thu Aug 15 at 1:59 PM MDT. (DBC-67226)
Highway 97, southbound. Construction work between Exeter Station Road and Birch Ave 1 km north of 100 Mile House. Until Fri Sep 20. From 8:00 AM to 4:00 PM PDT daily. Southbound lane closure. Right lane closed. Expect minor delays. Last updated Thu Aug 15 at 8:58 AM PDT. (DBC-67216)
Highway 31A, eastbound. Paving operations between Duncan Dr and Retallak for 13.5 km (3 to 16 km east of New Denver). Until Fri Oct 11. From 7:00 AM to 8:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Reduced speed. Watch for crew and equipment. Watch for gravel sections, uneven pavement, milled surfaces. Last updated Tue Aug 13 at 8:52 AM PDT. (DBC-67107)
Highway 22, in both directions. Paving operations between Warfield Hill Rd and 5th Ave for 20.2 km (Castlegar to Trail). Until Sat Sep 28 at 8:00 PM PDT. From 6:00 AM to 8:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect delays. Last updated Wed Aug 14 at 11:39 AM PDT. (DBC-67182)
Highway 6 EW. Paving operations between McCormack Rd and 1st Ave NE for 35.6 km (Nakusp to 17 km east of Fauquier). Until Sat Sep 21. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Overnight parking of equipment with short single lane alternating traffic section may be in effect. Last updated Thu Aug 8 at 3:59 PM PDT. (DBC-67007)