Backgrounder: More than $89 million invested in clean economy infrastructure projects across British Columbia
District of Fort St. James
Tl’azt’en Nation – Health Centre Energy Efficiency Upgrades
Upgrade ventilation, roof insulation, and install heat recovery and heat pumps to enhance energy efficiency and indoor air quality.
$331,151
$0
$0
$110,384
*Regional District of Greater Vancouver
Northwest Langley Wastewater Treatment Plant Renewable Natural Gas Production
Construct a facility to convert biogas into renewable natural gas for the FortisBC grid and recover waste heat to replace gas-fired heating in the plant.
$7,309,423
$6,090,577
$4,873,558
$0
City of Kelowna
H2O Adventure and Fitness Centre Energy Modernization
Upgrade the building’s heat recovery, HVAC, and lighting systems, and install 100 kW of solar photovoltaics and 10 Level-2 EV chargers.
$671,007
$1,789,241
$894,788
$0
Kwakiutl First Nation
Community Building Energy Retrofits and Solar PV
Upgrade the building envelope, HVAC equipment, and lighting, and install solar photovoltaics at six on-reserve community buildings.
$1,544,435
$514,811
$0
$0
Regional District of Nanaimo
Oceanside Place Arena Heat Recovery and Energy Upgrades
Install heat pumps to recover heat from the refrigeration plant, upgrade air-handling and dehumidification systems, and remove existing gas-fired radiant heating.
$187,200
$499,169
$249,631
$0
Regional District of Nanaimo
Aquatic Centre HVAC Equipment Upgrades
Install a heat-recovery chiller, replace air-handling units with hydronic cooling coils, and add an air-source heat pump.
$1,054,636
$2,812,187
$1,406,357
$0
City of North Vancouver
Lonsdale Energy – North Vancouver Sewer Heat Recovery Plant
Construct a sewer heat recovery facility to distribute heat to neighbourhood buildings through an existing district energy system.
$4,786,200
$12,762,402
$0
$6,382,398
*District of North Vancouver
BC Hydro Customer Connection Project: Capilano University Electrification
Extend service capabilities to the university by installing underground feeder cables and constructing feeder duct banks at various locations.
$1,344,500
$0
$0
$1,344,500
District of Peachland
Thompson Okanagan Tourism Association – Inspiration/Training Center – Phase 2
Install a living roof and passive cooling systems for improved energy efficiency and sustainability, and renovate the washrooms to enhance accessibility.
$453,100
$283,188
$0
$396,462
Regional District of Powell River
Mid-Level Connector Multi-Use Pathway
Construct a multi-use pathway to connect neighborhoods and enhance access to the community recreation center and secondary school, reducing greenhouse gas emissions by promoting active transportation.
$150,000
$399,975
$200,025
$0
City of Salmon Arm
Shaw Centre Heat Recovery and Air Handling Upgrade
Upgrade heat recovery equipment and the ventilation system to improve energy efficiency and indoor air quality.
$152,654
$157,605
$112,841
$0
District of Stewart
BC Hydro Customer Connection Project: KSM Mine Electrification – Phase 2
Construct the Treaty Creek Switching Station to supply KSM Mine with clean and renewable energy, and to allow customers to connect to the grid for both construction and operations.
$3,013,400
$0
$0
$3,013,400
*City of Surrey
Surrey City Energy Sewer Heat Recovery Project
Construct a sewer heat recovery facility with sewage screening equipment, heat exchangers, distribution pumps, and a district energy system.
$1,292,513
$3,446,486
$1,723,567
$0
Township of Langley
BC Hydro – Customer Connection Project: Martini Film Studios Electrification
Construct a new circuit extension from the existing Fleetwood substation to provide customers with clean and renewable electricity.
$2,712,500
$0
$0
$2,712,500
City of Vancouver
BC Hydro Customer Connection Project: St. Paul’s Hospital and Health Campus
Design and construct electrical infrastructure to enable electrification at the new hospital and health campus.
$1,775,000
$0
$0
$1,775,000
City of Vancouver
Creative Energy Vancouver – District Energy System for Senakw Development
Construct a district energy system that includes a sewer main connection with screening equipment, heat pumps, a natural gas backup boiler, electric peaking boilers, evaporative cooling towers, and 11 building energy transfer stations.
$1,666,830
$1,000,098
$0
$4,000,392