Cariboo
Highway 20 – Road Condition

Highway 20. Muddy sections between Olsen Dr and Rainbow Range Trailhead for 77.7 km (16 km east of Bella Coola to 39 km west of Anahim Lake). Last updated Wed May 1 at 3:05 PM PDT. (DBCRCON-186066)

Posted on: May 1, 2024


Thompson Okanagan
Highway 1 – Future Planned

Highway 1 (TransCanada Highway). Road maintenance work planned between 3rd Nations Rd and Salmon River Rd for 1.8 km (Salmon Arm). Starting Thu May 2 at 7:00 AM PDT until Thu May 2 at 2:00 PM PDT. Left lane will be closed. Last updated Wed May 1 at 2:49 PM PDT. (DBC-63455)

Posted on: May 1, 2024


Kootenays
Highway 1 – Eastbound – Future Planned

Highway 1 (TransCanada Highway), eastbound. Maintenance planned between Highway 23 North and Meadows in the Sky Pkwy (Revelstoke). Starting Wed May 29 until Fri May 31. From 8:00 AM to 5:00 PM PDT on Wednesday, Thursday and Friday. Right lane will be closed. Watch for traffic control personnel. Exit ramp closed to meadows in the sky. Traffic may enter from eastbound side of highway. Next update time Fri May 31 at 5:00 PM PDT. Last updated Wed May 1 at 12:37 PM PDT. (DBC-63452)

Posted on: May 1, 2024


Kootenays
Highway 1 – Eastbound – Future Planned

Highway 1 (TransCanada Highway), eastbound. Maintenance planned between Highway 23 North and Meadows in the Sky Pkwy (Revelstoke). Starting Mon May 27 until Tue May 28. From 8:00 AM to 5:00 PM PDT on Monday and Tuesday. Right lane will be closed. Watch for traffic control personnel. Last updated Wed May 1 at 12:28 PM PDT. (DBC-63451)

Posted on: May 1, 2024


Thompson Okanagan
Highway 1 – Current Planned

Highway 1 (TransCanada Highway). Road sweeping between Loftus Rd and Avoca Rd W for 8.5 km (25 to 16 km east of Sicamous). Until Wed May 1 at 4:00 PM PDT. Left lane is closed. Last updated Wed May 1 at 11:16 AM PDT. (DBC-63444)

Posted on: May 1, 2024


Thompson Okanagan
Highway 5A – Westbound – Current Planned

Highway 5A, westbound. Construction work between Airport Road and Coyote Valley Road 4 km east of Merritt. Until Fri May 31 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT daily. Single lane alternating traffic. Expect minor delays. Last updated Wed May 1 at 11:09 AM PDT. (DBC-63443)

Posted on: May 1, 2024


Thompson Okanagan
Lytton Ferry – Incident

Lytton Ferry. There will be required maintenance between Lytton Ferry Start and Lytton Ferry End for 0.1 km (Lytton). Starting Tue May 7 at 9:30 AM PDT until Tue May 7 at 2:30 PM PDT. Ferry will be out of service. Limited to Emergency Services only. Last updated Wed May 1 at 11:49 AM PDT. (DBC-63448)

Posted on: May 1, 2024


Thompson Okanagan
Highway 1 – Westbound – Future Planned

Highway 1 (TransCanada Highway), westbound. Road sweeping planned between Bernie Rd and 70 Ave NE for 11.8 km (Salmon Arm to 8 km west of Sicamous). Starting Thu May 2 at 7:00 AM PDT until Thu May 2 at 4:00 PM PDT. Watch for slow moving vehicles & equipment. Last updated Wed May 1 at 11:20 AM PDT. (DBC-63445)

Posted on: May 1, 2024


Cariboo
Nazko Rd – Current Planned

Nazko Rd. Maintenance between Brennen Rd and Bluestone Rd for 15.6 km (91 to 75 km east of Nazko). Until Wed May 1 at 5:00 PM PDT. Watch for traffic control
Watch for slow moving vehicles. Last updated Wed May 1 at 8:51 AM PDT. (DBC-63435)

Posted on: May 1, 2024


Thompson Okanagan
Highway 1 – Current Planned

Highway 1 (TransCanada Highway). Bridge maintenance between Ward Rd and Prosh Frtg for 3.4 km (24 to 21 km east of Sicamous). Until Wed May 1 at 3:00 PM PDT. Single lane alternating traffic. Last updated Wed May 1 at 8:44 AM PDT. (DBC-63434)

Posted on: May 1, 2024


Thompson Okanagan
Highway 5 – Northbound – Future Planned

Highway 5 (Coquihalla South), northbound. Electrical maintenance planned between Exit 202: Portia and Exit 221: Falls Lake Rd for 19.8 km (2 km north of Coquihalla Summit to 11 km south of Great Bear Snowshed). Starting Mon May 6 at 9:30 AM PDT until Thu May 9 at 4:00 PM PDT. Right lane will be closed. Watch for traffic control personnel. Variable speed limit maintenance in various locations. Last updated Wed May 1 at 7:57 AM PDT. (DBC-63431)

Posted on: May 1, 2024


Kootenays
Highway 3 – Current Planned

Highway 3 (Crowsnest Highway). Bridge maintenance between Beadman Rd and Murray St for 0.6 km (4 to 5 km west of Midway). Until Wed May 1 at 3:00 PM PDT. Single lane alternating traffic. Last updated Wed May 1 at 6:26 AM PDT. (DBC-63421)

Posted on: May 1, 2024


Cariboo
Highway 20 – Both Directions – Current Planned

Highway 20, in both directions. Road sweeping between Meldrum Creek Rd and Fairview Dr for 23.3 km (Williams Lake). Until Wed May 1 at 4:00 PM PDT. Watch for slow moving vehicles. Last updated Wed May 1 at 6:53 AM PDT. (DBC-63424)

Posted on: May 1, 2024


Kootenays
Highway 6 NS – Road Condition

Highway 6 NS. Limited visibility with fog between Junction Hwy 3 and US Border for 10.4 km (BC and WA Border, South of Osoyoos). Last updated Wed May 1 at 6:36 AM PDT. (DBCRCON-186072)

Posted on: May 1, 2024


Kootenays
Highway 6 NS – Road Condition

Highway 6 NS. Limited visibility with fog between Spruce St and Junction Hwy 3 for 12.1 km (Salmo). Last updated Wed May 1 at 6:36 AM PDT. (DBCRCON-186071)

Posted on: May 1, 2024


Kootenays
Highway 3 – Road Condition

Highway 3 (Crowsnest Highway). Limited visibility with fog between Junction Hwy 3B and Junction Hwy 6NS for 24.5 km (Salmo). Last updated Wed May 1 at 6:36 AM PDT. (DBCRCON-186068)

Posted on: May 1, 2024


Kootenays
Highway 6 NS – Road Condition

Highway 6 NS. Limited visibility with fog between Junction Hwy 3 and US Border for 10.4 km (BC and WA Border, South of Osoyoos). Last updated Wed May 1 at 6:36 AM PDT. (DBCRCON-186064)

Posted on: May 1, 2024


Kootenays
Highway 6 NS – Road Condition

Highway 6 NS. Limited visibility with fog between Spruce St and Junction Hwy 3 for 12.1 km (Salmo). Last updated Wed May 1 at 6:36 AM PDT. (DBCRCON-186063)

Posted on: May 1, 2024


Thompson Okanagan
Highway 97A – Both Directions – Current Planned

Highway 97A, in both directions. Road sweeping between Hutchison Rd and Kappel St for 15.2 km (Sicamous). Until Wed May 1 at 4:30 PM PDT. Watch for road crew and slow moving vehicles. Last updated Wed May 1 at 7:05 AM PDT. (DBC-63427)

Posted on: May 1, 2024


Kootenays
Highway 3 – Current Planned

Highway 3 (Crowsnest Highway). Bridge maintenance between Columbia Ave and Junction Hwy 3B for 0.6 km (10 km west of Salmo). Until Wed May 1 at 1:00 PM PDT. Single lane alternating traffic. Last updated Wed May 1 at 6:23 AM PDT. (DBC-63420)

Posted on: May 1, 2024


Cariboo
Highway 97 – Current Planned

Highway 97 (Cariboo Connector). Pavement patching underway between Fircrest Rd and Kokanee Bay Rd for 2.4 km (29 to 31 km north of 100 Mile House). Until Wed May 1 at 2:00 PM PDT. Lane Closure. Last updated Wed May 1 at 7:04 AM PDT. (DBC-63426)

Posted on: May 1, 2024


Thompson Okanagan
Highway 5 – Northbound – Future Planned

Highway 5 (Coquihalla North), northbound. Road sweeping planned between Inks Lake Rd and West Kamloops for 7.7 km (Kamloops). Starting Wed May 1 at 7:00 AM PDT until Wed May 1 at 11:00 AM PDT. Watch for slow moving vehicle. Last updated Wed May 1 at 6:10 AM PDT. (DBC-63417)

Posted on: May 1, 2024


Kootenays
Highway 3 – Road Condition

Highway 3 (Crowsnest Highway). Limited visibility with fog between Junction Hwy 3B and Junction Hwy 6NS for 24.5 km (Salmo). Last updated Wed May 1 at 6:36 AM PDT. (DBCRCON-186062)

Posted on: May 1, 2024


Thompson Okanagan
Highway 1 – Eastbound – Future Planned

Highway 1 (TransCanada Highway), eastbound. Road sweeping planned between Grand Blvd and Pat Rd for 5.8 km (Kamloops). Starting Wed May 1 at 12:00 PM PDT until Wed May 1 at 4:00 PM PDT. Watch for slow moving vehicle. Last updated Wed May 1 at 6:14 AM PDT. (DBC-63418)

Posted on: May 1, 2024


Kootenays
Highway 93 – Road Condition

Highway 93. Limited visibility dense fog between Canal Flats Cut-Off Rd and Stanley St for 61.3 km (Canal Flats to Radium Hot Springs). Limited visibility with fog. Last updated Wed May 1 at 5:46 AM MDT. (DBCRCON-186061)

Posted on: May 1, 2024


Kootenays
Upper Arrow Lake Ferry – Both Directions – Current Planned

Upper Arrow Lake Ferry, in both directions. Maintenance between Upper Arrow Lake Ferry and the end of Upper Arrow Lake Ferry (Upper Arrow Lake). Expect delays. 30 minute delays in both directions due to unscheduled maintenance. Next update time Tue Apr 30 at 8:00 PM PDT. Last updated Tue Apr 30 at 5:45 PM PDT. (DBC-63406)

Posted on: April 30, 2024


Thompson Okanagan
Highway 97 – Northbound – Future Planned

Highway 97, northbound. Shoulder maintenance planned between Ash Ave and Pineview Dr for 1.1 km (4 to 5 km south of Penticton). Starting Wed May 1 at 7:00 AM PDT until Fri May 3 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on Wednesday and Friday. Watch for traffic control. Watch for construction workers. Last updated Tue Apr 30 at 5:30 PM PDT. (DBC-63405)

Posted on: April 30, 2024


Thompson Okanagan
Highway 5 – Southbound – Incident

Highway 5, southbound. Vehicle recovery planned between Skinner Rd and Hoirup Rd for 3.2 km (14 to 10 km north of Vavenby). Starting Mon May 6 at 6:00 AM PDT until Mon May 6 at 6:00 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Watch for traffic control personnel. Last updated Tue Apr 30 at 4:44 PM PDT. (DBC-63404)

Posted on: April 30, 2024


Cariboo
Other Roads – Future Planned

Hwy 24. Utility work planned between Hwy 97 and Watch Lake rd. Starting Wed May 1 until Fri May 31. From 8:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Tue Apr 30 at 11:30 AM PDT. (DBC-63387)

Posted on: April 30, 2024


Cariboo
Horse Lake Rd – Future Planned

Horse Lake Rd. Utility work planned between Birch Ave; Cariboo Trail and McMillan Rd for 12.4 km (100 Mile House). Starting Wed May 1 until Fri May 31. From 8:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Tue Apr 30 at 11:33 AM PDT. (DBC-63389)

Posted on: April 30, 2024


Thompson Okanagan
Highway 1 – Eastbound – Current Planned

Highway 1 (TransCanada Highway), eastbound. Construction work between Coburn St and Little River Rd for 11.9 km (Chase). Until Fri May 10 at 7:00 PM PDT. Expect minor delays. Lane Closure. Single lane alternating traffic. Watch for traffic control. Last updated Tue Apr 30 at 11:24 AM PDT. (DBC-63385)

Posted on: April 30, 2024


Cariboo
Highway 24 – Future Planned

Highway 24. Electrical maintenance planned between Netherland Rd and Watch Lake Rd for 1.4 km (Lone Butte). Starting Wed May 1 at 8:00 AM PDT until Wed May 1 at 6:00 PM PDT. Single lane alternating traffic will be in effect. Expect delays of up to 5 minutes. Please watch for signage and personnel. Last updated Tue Apr 30 at 11:20 AM PDT. (DBC-63384)

Posted on: April 30, 2024


Kootenays
Highway 1 – Both Directions – Incident

Highway 1 (TransCanada Highway), in both directions. Avalanche control work planned between Three Valley Avalanche Gate and Clanwilliam OH Bridge for 9.3 km (18 to 9 km west of Revelstoke). Starting Thu May 2 at 8:00 AM PDT until Thu May 2 at 12:00 PM PDT. Watch for traffic control personnel. Speed limit 70 km/h. Expect up to 20 minute delays. Next update time Thu May 2 at 12:00 PM PDT. Last updated Tue Apr 30 at 10:15 AM PDT. (DBC-63380)

Posted on: April 30, 2024


Cariboo
Highway 97 – Both Directions – Incident

Highway 97 (Cariboo Connector), in both directions. Vehicle incident at Lynes Creek Rd (10 km north of Wildwood). Road closed. Detour not available. Estimated time of opening not available. Next update time Tue Apr 30 at 11:00 AM PDT. Last updated Tue Apr 30 at 10:11 AM PDT. (DBC-63382)

Posted on: April 30, 2024


Kootenays
Highway 3A – Current Planned

Highway 3A. Bridge maintenance between Nelson Ave and Jorgensen Rd for 0.5 km (Nelson). Until Tue Apr 30 at 4:30 PM PDT. Single lane alternating traffic. Last updated Tue Apr 30 at 9:40 AM PDT. (DBC-63381)

Posted on: April 30, 2024


Thompson Okanagan
Highway 5 – Northbound – Current Planned

Highway 5 (Coquihalla North), northbound. Road sweeping between Inks Lake Rd and West Kamloops for 7.7 km (Kamloops). Until Tue Apr 30 at 4:00 PM PDT. Please watch for crews and slow moving vehicles. Last updated Tue Apr 30 at 7:28 AM PDT. (DBC-63365)

Posted on: April 30, 2024


Kootenays
Highway 1 – Both Directions – Current Planned

Highway 1 (TransCanada Highway), in both directions. Maintenance between Wiseman Rd and Forde Station Rd for 6.3 km (18 to 25 km west of Golden). Until Thu May 2. From 8:00 AM to 3:30 PM MDT on Tuesday, Wednesday and Thursday. Lane closures in both directions in effect. Watch for slow moving vehicles. Last updated Tue Apr 30 at 9:07 AM MDT. (DBC-63369)

Posted on: April 30, 2024


Thompson Okanagan
Highway 5 – Northbound – Current Planned

Highway 5 (Coquihalla North), northbound. Shoulder maintenance between Exit 336: Walloper and West Kamloops for 26.7 km (14 km north of Surrey Lake Summit to Kamloops). Until Tue Apr 30 at 4:30 PM PDT. Right lane closed. Last updated Tue Apr 30 at 7:31 AM PDT. (DBC-63366)

Posted on: April 30, 2024


Thompson Okanagan
Highway 5 – Road Condition

Highway 5. Limited visibility with fog between McLure Ferry Rd and Wire Cache Rest Area for 126.5 km (13 km south of Barriere to 18 km south of Avola). Last updated Tue Apr 30 at 6:53 AM PDT. (DBCRCON-186058)

Posted on: April 30, 2024


Thompson Okanagan
Highway 1 – Both Directions – Current Planned

Highway 1 (TransCanada Highway), in both directions. Road sweeping between Bernie Rd and Old Spallumcheen Rd for 8.6 km (Sicamous). Until Tue Apr 30 at 4:00 PM PDT. Single lane alternating traffic. Please watch for slow moving vehicles and crews. Last updated Tue Apr 30 at 6:52 AM PDT. (DBC-63357)

Posted on: April 30, 2024


Cariboo
Highway 97 – Current Planned

Highway 97 (Cariboo Connector). Bridge maintenance between Parke Rd and Loon Lake Rd for 20.7 km (Cache Creek to 17 km south of Clinton). Until Tue Apr 30 at 2:00 PM PDT. Lane Closure. Last updated Tue Apr 30 at 7:15 AM PDT. (DBC-63364)

Posted on: April 30, 2024


Kootenays
Highway 43 – Road Condition

Highway 43. Snowing between the start of Highway 43 and Alpine Way for 33.7 km (Sparwood to Elkford). Last updated Tue Apr 30 at 6:12 AM MDT. (DBCRCON-186056)

Posted on: April 30, 2024


Kootenays
Highway 3 – Road Condition

Highway 3 (Crowsnest Highway). Snowing between Junction Rd and BC/AB Border for 81.2 km (1 km west of Elko to British Columbia and Alberta Border). Last updated Tue Apr 30 at 6:12 AM MDT. (DBCRCON-186055)

Posted on: April 30, 2024


Thompson Okanagan
Highway 97C – Both Directions – Current Planned

Highway 97C (Okanagan Connector), in both directions. Road sweeping planned between Trepanier Rd and Pennask Summit for 26.4 km (3 km west of Peachland to Pennask Summit). Starting Mon Apr 29 at 6:00 PM PDT until Sun May 5 at 2:00 AM PDT. From 6:00 PM to 2:00 AM PDT on weekdays and Saturday. Please watch for slow moving vehicle. Last updated Mon Apr 29 at 5:15 PM PDT. (DBC-63350)

Posted on: April 29, 2024


Thompson Okanagan
Highway 1 – Incident

Highway 1 (TransCanada Highway). Vehicle recovery between Comazzetto Rd and Vicars Rd for 0.7 km (Kamloops). Left lane is closed. Please slow down for emergency vehicles. Next update time Mon Apr 29 at 6:30 PM PDT. Last updated Mon Apr 29 at 4:37 PM PDT. (DBC-63348)

Posted on: April 29, 2024


Thompson Okanagan
Highway 5 – Northbound – Future Planned

Highway 5, northbound. Shoulder maintenance planned between Harmon Rd and Vavenby Bridge Rd for 2.6 km (Vavenby). Starting Mon May 6 until Sat May 11. From 8:00 AM to 6:00 PM PDT daily. Northbound lane will be closed. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Expect minor delays. Last updated Mon Apr 29 at 3:58 PM PDT. (DBC-63344)

Posted on: April 29, 2024


Kootenays
Highway 93 – Road Condition

Highway 93. Slushy with slippery sections between Stanley St and the end of Highway 93 for 94.4 km (Radium Hot Springs to British Columbia and Alberta Border). Last updated Mon Apr 29 at 4:54 PM MDT. (DBCRCON-186045)

Posted on: April 29, 2024


Cariboo
Other Roads – Southbound – Future Planned

Highway 99 S (Duffy Lake Rd), southbound. Maintenance planned between Lillooet and Pemberton. Starting Tue Apr 30 at 7:00 AM PDT until Fri May 31 at 5:00 PM PDT. Delays up to 15 minutes. Please watch for signage and personnel. Last updated Mon Apr 29 at 4:05 PM PDT. (DBC-63345)

Posted on: April 29, 2024


Kootenays
Highway 43 – Both Directions – Future Planned

Highway 43, in both directions. Road sweeping between the start of Highway 43 and Alpine Way for 33.7 km (Sparwood to Elkford). Until Mon Apr 29 at 8:00 PM MDT. Shoulder closed. Watch for slow moving vehicle. Last updated Mon Apr 29 at 4:18 PM MDT. (DBC-63341)

Posted on: April 29, 2024


Kootenays
Highway 3B – Future Planned

Highway 3B. Paving operations planned between Fourth Ave and Walsh Rd for 6.7 km (Trail). Starting Tue Apr 30 at 5:30 PM PDT until Fri Jun 14 at 6:30 AM PDT. From 5:30 PM to 6:30 AM PDT on weekdays and Saturday. Single lane alternating traffic will be in effect. Night time milling and paving. Reduced speed. Watch for crew and equipment. Watch for uneven pavement and milled surfaces. Last updated Mon Apr 29 at 12:40 PM PDT. (DBC-63337)

Posted on: April 29, 2024