Highway 1 (TransCanada Highway), in both directions. Construction work between Ford Rd and Tappen Valley Rd for 3.2 km (Tappen). Until Tue Dec 31, 2024. From 7:00 AM to 12:00 AM PST on weekdays and Saturday. Expect delays. Reduced speed through work zone at 80 km/hr during inactive work, 60 km/hr during active work. Intermittent minor stoppages. Last updated Sat Dec 9 at 2:50 PM PST. (DBC-57219)
Highway 1 (TransCanada Highway), in both directions. Blasting between Tappen Beach Rd and 65 Ave NW (1 km west of Salmon Arm). Until Thu Oct 31, 2024. From 7:00 AM to 5:00 PM PST and from 5:30 PM to 3:00 AM PST on weekdays and Saturday. Up to one 20 minute closure daily. Additional 5 minute closures may be required intermittently. Watch for traffic control. Last updated Sat Dec 9 at 2:50 PM PST. (DBC-57687)
McKay Road, in both directions. Flooding at McKay Road. Road closed. Next update time Thu Jan 4, 2024 at 2:00 PM PST. Last updated Tue Dec 5 at 5:03 PM PST. (DBC-53013)
Highway 1 (TransCanada Highway), in both directions. Road construction work between Gladwin Rd and Nicomen River Rd (10 km east of Lytton). From 7:00 AM to 6:00 PM PST daily. Expect minor delays. Last updated Wed Nov 29 at 9:22 AM PST. (DBC-57786)
Soda-Creek Macalister Road, in both directions. Landslide at 10 kms from the Junction of Highway 97. Road closed. Geotech assessment underway. Next update time Fri Mar 15, 2024 at 2:00 PM PST. Last updated Thu Nov 16 at 3:11 PM PST. (DBC-16911)
Durrell Road, in both directions. Landslide at 700m from Highway 97. Road closed. Detour in effect. Detour available via Highway 97 and Dale Lake Road. Next update time Fri Apr 19, 2024 at 2:00 PM PDT. Last updated Thu Oct 19 at 5:36 PM PDT. (DBC-27390)
Big Bar Reaction Ferry, in both directions. Seasonal shutdown at Big Bar Reaction Ferry (Big Bar Reaction Ferry). Road closed. Aerial Car available for foot traffic only. Next update time Fri Mar 1, 2024 at 10:00 AM PDT. Last updated Thu Oct 19 at 9:07 AM PDT. (DBC-57353)
Johnston Bridge. Travel advisory in effect at Front St. In Quesnel. Bridge is open to vehicles with gross vehicle weight rating of 10,000 kilograms or lower. Industrial traffic and heavy commercial traffic must detour via Plywood Rd and Maple Drive. Industrial traffic is not allowed to detour through Johnston Subdivision. Next update time Wed Apr 10, 2024 at 2:00 PM PDT. Last updated Tue Sep 5 at 7:31 PM PDT. (DBC-47311)
Kersley-Dale Landing Rd. Landslide at 500 metres in from Highway 97 Intersection. Road closed. A temporary Single Lane Gravel Road for Local Traffic via Arnoldus Road. Next update time Tue Jan 23, 2024 at 2:00 PM PDT. Last updated Sun Aug 27 at 4:38 PM PDT. (DBC-23443)
Quesnel-Hixon Road, in both directions. Landslide at Cottonwood bridge. Road closed. Next update time Tue Jan 23, 2024 at 2:00 PM PDT. Last updated Sun Jul 23 at 2:46 PM PDT. (DBC-28386)
Highway 8, in both directions. Utility work between Porcupine Ridge Rd and Aberdeen Rd for 39.0 km (7 km west of Merritt to 14 km east of Spences Bridge). Until Sat Jun 1, 2024. From 7:00 AM to 5:00 PM PDT on Friday and Saturday. Single lane alternating traffic. Last updated Thu Jun 29 at 2:25 PM PDT. (DBC-53957)