%%tb-image-alt-text%%
Kamloops.me

Me and my Kamloops

Highway 97A – Both Directions – Future Planned

Highway 97A, in both directions. Utility work planned between Harding Rd and Smith Dr for 0.8 km (12 to 13 km south of Enderby). Starting Wed May 19 at 9:00 AM PDT until Thu May 20 at 3:00 PM PDT. Install LED street lights. Please us caution and obey all traffic control signs when travelling in the area. Last updated Tue May 18 at 2:58 PM PDT. (DBC-29400)