%%tb-image-alt-text%%
Kamloops.me

Me and my Kamloops

Highway 97A – Both Directions – Future Planned

Highway 97A, in both directions. Road sweeping planned between Hutchison Rd and the end of Highway 97A for 12.5 km (Sicamous). Starting Wed May 12 at 7:00 AM PDT until Wed May 12 at 3:00 PM PDT. Watch for traffic control personnel. Watch for slow moving vehicle. Last updated Tue May 11 at 2:24 PM PDT. (DBC-29100)