%%tb-image-alt-text%%
Kamloops.me

Me and my Kamloops

Highway 97 – Both Directions – Future Planned

Highway 97, in both directions. Bridge maintenance planned between Sage Mesa Dr and Wharf St (Summerland). Starting Tue May 18 at 9:00 AM PDT until Tue May 18 at 2:00 PM PDT. Lane Closure. Watch for traffic control personnel. Bridge cleaning. Single lane with 5 minute delays. Last updated Thu May 13 at 5:07 PM PDT. (DBC-29224)